THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty establishing the European Community, and in particular Article 308 thereof,
Having regard to the proposal of the Commission,
Having regard to the opinion of the European Parliament,
Whereas:
(1) The Commission consulted the Economic and Financial Committee before submitting its proposal.
(2) The Council, by Decision 1999/282/EC, approved, in the aftermath of the Kosovo crisis, macro-financial assistance for Albania of up to EUR 20 million in the form of a long-term loan facility. In the light of a better-than-expected balance of payments situation, the Albanian authorities did not request the release of this assistance; therefore, the Commission deprogrammed it in 2001.
(3) Within the Stabilisation and Association process, the framework for EU relations with the region, it is desirable to support efforts to sustain political and economic stabilisation in Albania, with a view to evolving towards the development of a full cooperation relationship with the Community; this is also the aim of the Stabilisation and Association Agreement which is currently under negotiation between Albania and the EU.
(4) The International Monetary Fund (IMF) approved on 21 June 2002 in favour of Albania a three-year programme supported by a Poverty Reduction and Growth Facility (PRGF) for an amount of about USD 36 million, to support the authorities' economic programme over the period from June 2002 to June 2005; out of this amount, USD 11 million are projected to be disbursed in 2004.
(5) In the framework of the new three-year Country Assistance Strategy (CAS) adopted by the World Bank Board on 20 June 2002, USD 8 million are projected to be disbursed in 2004 under the Poverty Reduction Support Credit.
(6) Over and above these estimated financial supports projected to be provided by the International Monetary Fund and the World Bank, a significant residual financing gap remains in 2004, to be covered to support the policy objectives attached to the authorities' reform efforts.
(7) The Community already provided macro-financial assistance to Albania; the authorities of Albania have requested further financial assistance from the international financial institutions, the Community, and other bilateral donors.
(8) Community macro-financial assistance to Albania is an appropriate measure to help the country meet its external financing needs, including through a reinforcement of its reserves and budget support.
(9) Financial assistance from the Community in the form of a combination of a long-term loan and a straight grant is an appropriate measure to support the sustainability of Albania's external financial position, given the country's relatively low level of development.
(10) This financial support, in particular the grant component, should be provided after verifying whether the financial and economic conditions lay down can be fulfilled.
(11) In order to ensure efficient protection of the Community's financial interests linked to the present macro-financial assistance, it is necessary to provide for appropriate measures by Albania related to the prevention of fraud and other irregularities linked to this assistance, as well as for controls by the Commission and audits by the Court of Auditors.
(12) The inclusion of a grant component in this assistance is without prejudice to the powers of the budgetary authority.
(13) This assistance should be managed by the Commission in consultation with the Economic and Financial Committee.
(14) The Treaty does not provide, for the adoption of this Decision, powers other than those of Article 308,
HAS DECIDED AS FOLLOWS:
Article 1
1. The Community shall make available to Albania a macro-financial assistance in the form of a long-term loan and a straight grant with a view to helping the country meet its external financing needs, including through a reinforcement of its reserves and budget support.
2. The loan component of this assistance shall amount to a maximum principal of EUR 9 million with a maximum maturity of 15 years. To this end, the Commission is empowered to borrow, on behalf of the Community, the necessary resources that will be placed at the disposal of Albania in the form of a loan.
3. The grant component of this assistance shall amount to a maximum of EUR 16 million.
4. This Community financial assistance shall be managed by the Commission in close consultation with the Economic and Financial Committee and in a manner consistent with the agreements reached between the IMF and Albania.
5. The Community financial assistance shall be made available for two years starting from the first day after the entry into force of this decision. However, if circumstances so require, the Commission, after consultation of the Economic and Financial Committee, may decide to extend the availability period by a maximum of one year.
Article 2
1. The Commission is empowered to agree with the authorities of Albania, after consultation with the Economic and Financial Committee the economic policy and financial conditions attached to this assistance to be laid down in a Memorandum of Understanding. These conditions shall be consistent with the agreements referred to in Article 1(4).
2. Before proceeding with the actual implementation of the Community assistance, the Commission shall check the reliability of Albania's financial circuits, administrative procedures, internal and external control mechanisms which are relevant for this Community macro-financial assistance.
3. The Commission shall verify at regular intervals, in collaboration with the Economic and Financial Committee and in coordination with the IMF, that economic policies in Albania are in accordance with the objectives of this assistance and that its economic policy and financial conditions are being fulfilled.
Article 3
1. The loan and grant components of this assistance shall be made available by the Commission to Albania in at least two instalments. Subject to the provisions of Article 2 and a satisfactory assessment in accordance with Article 2(2), the first instalment shall be released on the basis of a satisfactory track record of the macro-economic programme of Albania under the present Poverty Reduction and Growth Facility with the IMF.
2. Subject to the provisions of Article 2, the second and any further instalments shall be released on the basis of a satisfactory implementation of the abovementioned programme, and not before one quarter after the release of the previous instalment.
3. The funds shall be paid to the Central Bank of Albania. The final recipient of the funds will be the Central Bank of Albania, to the extent that the assistance is intended to reinforce the country's reserves, or the Ministry of Finance if it is intended for budgetary support purposes.
Article 4
The implementation of this assistance shall take place in accordance with the provisions of the Financial Regulation applicable to the General Budget of the European Communities and its implementing rules. In particular, the memorandum of understanding to be agreed with the authorities of Albania shall provide for appropriate measures by Albania related to the prevention of fraud and other irregularities linked to this assistance. It will also provide for controls by the Commission, including the European Anti-Fraud Office (OLAF), with the right to perform on-the-spot checks and inspections and for audits by the Court of Auditors, where appropriate, to be carried out on the spot.
Article 5
1. The borrowing and lending operations referred to in Article 1(2) shall be carried out using the same value date and must not involve the Community in the transformation of maturities, in any exchange or interest rate risks, or in any other commercial risk.
2. The Commission shall take the necessary steps, if Albania so requests, to ensure that an early repayment clause is included in the loan terms and conditions and that it may be exercised.
3. At the request of Albania, and where circumstances permit an improvement in the interest rate of the loan, the Commission may refinance all or part of its initial borrowings or restructure the corresponding financial conditions. Refinancing or restructuring operations shall be carried out in accordance with the conditions set out in paragraph 1 and shall not have the effect of extending the average maturity of the borrowing concerned or increasing the amount, expressed at the current exchange rate, of capital outstanding at the date of the refinancing or restructuring.
4. All costs incurred by the Community which are directly related to the borrowing and lending operations under this Decision shall be borne by Albania.
5. The Economic and Financial Committee shall be kept informed of developments in the operations referred to in paragraphs 2 and 3.
Article 6
At least once a year, and before September, the Commission shall address to the European Parliament and to the Council a report, which will include an evaluation on the implementation of this Decision in the previous year.
Article 7
Council Decision 1999/282/EC is hereby repealed.
Article 8
This Decision shall take effect on the day of its publication in the Official Journal of the European Union.
Done at Luxembourg, 29 April 2004. For the Council The President M. McDowell
Versions
Cited by
- Definitive adoption (EU, Euratom) 2024/207 of the European Union’s annual budget for the financial year 2024 Act · Grade B
These contributions shall constitute external assigned revenue in accordance with Article 21(2), point (d) and (e) of the Financial Regulation. PILOT PROJECTS, PREPARATORY ACTIONS, PREROGATIVES AND OTHER ACTIONS Title Chapter Article Item Heading FF 2024 appropriations 2023 appropriations 2022 out-turn % Payments 2022/2024 Commitments Payments Commitments Payments Commitments Payments 14 20PILOT PROJECTS, PREPARATORY ACTIONS, PREROGATIVES AND OTHER ACTIONS 14 20 01 Pilot projects 6 p.m. p.m. p.m. p.m. 0,— 277107,76 14 20 02 Preparatory actions 6 p.m. p.m. p.m. p.m. 0,— 15616,65 14 20 03Other a
- Definitive adoption (EU, Euratom) 2024/207 of the European Union’s annual budget for the financial year 2024 Act · Grade B
As of 31 December 2022, all loans to third countries were financed through back-to-back borrowing operations. The same funding approach applied to the financing of loans under BoP loans, EFSM loans, Euratom loans and SURE loans. Under back-to-back financing, each loan is funded with a corresponding EU bond that fully matches the Union loan in terms of its maturity, interest rate and repayment schedule. The liability for the Union is contingent, because the beneficiary country is contractually obliged to provide the revenue flow to repay the EU bonds. So, no outflow of Union resources is in pri
- Definitive adoption (EU, Euratom) 2026/72 of the European Union’s annual budget for the financial year 2026 Act · Grade B
In accordance with Articles 21 and 22 of the Financial Regulation, any assigned revenue entered in the statement of revenue give rise to the provision of corresponding appropriations and to implementation under this chapter. The related estimated amounts as well as the corresponding article or item of the statement of revenue are indicated, wherever possible, in the relevant budget lines. Regulation (EU) 2022/2463 of the European Parliament and of the Council of 14 December 2022 establishing an instrument for providing support to Ukraine for 2023 (macro-financial assistance +) (OJ L 322, 16.12
- Definitive adoption (EU, Euratom) 2026/72 of the European Union’s annual budget for the financial year 2026 Act · Grade B
To finance these programmes the Commission uses as of January 2023, a unified funding approach implemented through a diversified funding strategy, which delinks the disbursement of loans to a beneficiary from the issuance of the EU bonds. The diversified funding strategy was established for NextGenerationEU in 2021, but in December 2022 and in accordance with Regulation (EU, Euratom) 2022/2434 of the European Parliament and of the Council of 6 December 2022 amending Regulation (EU, Euratom) 2018/1046 as regards the establishment of an diversified funding strategy as a general borrowing method
- Definitive adoption (EU, Euratom) 2021/417 of the European Union’s general budget for the financial year 2021 Act · Grade B
Appropriations 2021 Appropriations 2020 Outturn 2019 Commitments Payments Commitments Payments Commitments Payments p.m. p.m. New article This appropriation is intended to provide the financial resources for the provisioning of the common provisioning fund, for budgetary guarantees for Euratom loans in third countries. Assigned revenue may give rise to additional appropriations, including under budgetary guarantees for loans granted under previous MFFs. Council Regulation (EC, Euratom) No 480/2009 of 25 May 2009 establishing a Guarantee Fund for external actions (OJ L 145, 10.6.2009, p. 10). R
- Definitive adoption (EU, Euratom) 2021/417 of the European Union’s general budget for the financial year 2021 Act · Grade B
EUROPEAN UNION GUARANTEE FOR THE BORROWING PROGRAMMES CONTRACTED BY THE UNION TO PROVIDE MACRO-FINANCIAL ASSISTANCE FOR THE COUNTRIES OF THE WESTERN BALKANS Legal basis Council Decision 1999/325/EC of 10 May 1999 providing macro-financial assistance to Bosnia and Herzegovina (OJ L 123, 13.5.1999, p. 57). Council Decision 1999/733/EC of 8 November 1999 providing supplementary macro-financial assistance to the former Yugoslav Republic of Macedonia (OJ L 294, 16.11.1999, p. 31). Council Decision 2001/549/EC of 16 July 2001 providing macro-financial assistance to the Federal Republic of Yugoslavia
- Definitive adoption (EU, Euratom) 2016/150 of the European Union’s general budget for the financial year 2016 Act · Grade B
The budget presents appropriations and resources by purpose (activity-based budgeting), with a view to enhancing transparency in the management of the budget with reference to the objectives of sound financial management and in particular efficiency and effectiveness. The expenditure authorised by the present budget totals EUR 155004173148 in commitment appropriations and EUR 143885295484 in payment appropriations, representing a variation rate of – 4,48 % and of + 1,84 % respectively by comparison with the 2015 budget. Budgetary revenue totals EUR 143885295484. The uniform rate of call for th
- Definitive adoption (EU, Euratom) 2016/150 of the European Union’s general budget for the financial year 2016 Act · Grade B
The Commission, when implementing this article, should take duly into account the outcomes of the meetings of the Interinstitutional Group on Information (IGI). The implementation of the Commission’s communication strategy takes place in close coordination with the Member States and the European Parliament. The Commission adopts a strategy and an annual work plan drawing on the orientations set out in its Communication of 11 August 2004 (COM(2004) 552 final) and it reports regularly to the relevant committee of the European Parliament on the implementation of the programme and on planning for
- Definitive adoption (EU, Euratom) 2016/150 of the European Union’s general budget for the financial year 2016 Act · Grade B
EUROPEAN UNION GUARANTEE FOR THE BORROWING PROGRAMMES CONTRACTED BY THE UNION TO PROVIDE MACRO-FINANCIAL ASSISTANCE FOR THE COUNTRIES OF THE WESTERN BALKANS Legal basis Council Decision 97/471/EC of 22 July 1997 providing macro-financial assistance for the former Yugoslav Republic of Macedonia (OJ L 200, 29.7.1997, p. 59). Council Decision 1999/325/EC of 10 May 1999 providing macro-financial assistance to Bosnia and Herzegovina (OJ L 123, 13.5.1999, p. 57). Council Decision 1999/733/EC of 8 November 1999 providing supplementary macro-financial assistance to the former Yugoslav Republic of Mace
- Definitive adoption (EU, Euratom) 2019/333 of the European Union’s general budget for the financial year 2019 Act · Grade B
The budget presents appropriations and resources by purpose (activity-based budgeting), with a view to enhancing transparency in the management of the budget with reference to the objectives of sound financial management and in particular efficiency and effectiveness. The expenditure authorised by the present budget totals EUR 165605645322 in commitment appropriations and EUR 148198939744 in payment appropriations, representing a variation rate of + 3,05 % and of + 2,37 % respectively by comparison with the 2018 budget. Budgetary revenue totals EUR 148198939744. The uniform rate of call for th
- Definitive adoption (EU, Euratom) 2019/333 of the European Union’s general budget for the financial year 2019 Act · Grade B
The Commission, when implementing this article, should take duly into account the outcomes of the meetings of the Interinstitutional Group on Information (IGI). The implementation of the Commission’s communication strategy takes place in close coordination with the Member States and the European Parliament. The Commission adopts a strategy and an annual work plan drawing on the orientations set out in its Communication of 11 August 2004 (COM(2004) 552 final) and it reports regularly to the relevant committee of the European Parliament on the implementation of the programme and on planning for
- Definitive adoption (EU, Euratom) 2019/333 of the European Union’s general budget for the financial year 2019 Act · Grade B
EUROPEAN UNION GUARANTEE FOR THE BORROWING PROGRAMMES CONTRACTED BY THE UNION TO PROVIDE MACRO-FINANCIAL ASSISTANCE FOR THE COUNTRIES OF THE WESTERN BALKANS Legal basis Council Decision 1999/325/EC of 10 May 1999 providing macro-financial assistance to Bosnia and Herzegovina (OJ L 123, 13.5.1999, p. 57). Council Decision 1999/733/EC of 8 November 1999 providing supplementary macro-financial assistance to the former Yugoslav Republic of Macedonia (OJ L 294, 16.11.1999, p. 31). Council Decision 2001/549/EC of 16 July 2001 providing macro-financial assistance to the Federal Republic of Yugoslavia
- Definitive adoption (EU, Euratom) 2022/182 of the European Union’s general budget for the financial year 2022 Act · Grade B
Appropriations 2022 Appropriations 2021 Outturn 2020 Commitments Payments Commitments Payments Commitments Payments 1123978 1123978 p.m. p.m. This appropriation is intended to provide the financial resources for the provisioning of the common provisioning fund, for budgetary guarantees for Euratom loans in third countries. Assigned revenue may give rise to additional appropriations, including under budgetary guarantees for loans granted under previous MFFs. Regulation (EU, Euratom) 2018/1046 of the European Parliament and of the Council of 18 July 2018 on the financial rules applicable to the
- Definitive adoption (EU, Euratom) 2022/182 of the European Union’s general budget for the financial year 2022 Act · Grade B
EUROPEAN UNION GUARANTEE FOR THE BORROWING PROGRAMMES CONTRACTED BY THE UNION TO PROVIDE MACRO-FINANCIAL ASSISTANCE FOR THE COUNTRIES OF THE WESTERN BALKANS Legal basis Council Decision 1999/325/EC of 10 May 1999 providing macro-financial assistance to Bosnia and Herzegovina (OJ L 123, 13.5.1999, p. 57). Council Decision 1999/733/EC of 8 November 1999 providing supplementary macro-financial assistance to the former Yugoslav Republic of Macedonia (OJ L 294, 16.11.1999, p. 31). Council Decision 2001/549/EC of 16 July 2001 providing macro-financial assistance to the Federal Republic of Yugoslavia
- Definitive adoption of the European Union's general budget for the financial year 2010 (2010/117/EU, Euratom) Act · Grade B
The budget presents appropriations and resources by purpose (activity-based budgeting), with a view to enhancing transparency in the management of the budget with reference to the objectives of sound financial management and in particular efficiency and effectiveness. The expenditure authorised by the present budget totals EUR 141452827822 in commitment appropriations and EUR 122937000000 in payment appropriations, representing a growth rate of 3,57 % and of 8,76 % respectively by comparison with the 2009 budget. Budgetary revenue totals EUR 122937000000. The uniform rate of call for the VAT r
- Definitive adoption of the European Union's general budget for the financial year 2010 (2010/117/EU, Euratom) Act · Grade B
Legal basis Council Decision 2006/41/EC of 24 January 2006 providing macro-financial assistance to Georgia (OJ L 25, 28.1.2006, p. 28). Council Decision 2006/880/EC of 30 November 2006 providing exceptional Community financial assistance to Kosovo (OJ L 339, 6.12.2006, p. 36). Council Decision 2007/259/EC of 16 April 2007 providing Community macro-financial assistance to Moldova (OJ L 111, 28.4.2007, p. 69). Council Decision 2007/860/EC of 10 December 2007 providing Community macro-financial assistance to Lebanon (OJ L 337, 21.12.2007, p. 111). FINANCIAL OPERATIONS AND INSTRUMENTS Title Chapte
- Definitive adoption of the European Union's general budget for the financial year 2010 (2010/117/EU, Euratom) Act · Grade B
Council Decision 97/471/EC of 22 July 1997 providing macro-financial assistance for the former Yugoslav Republic of Macedonia (OJ L 200, 29.7.1997, p. 59). Council Decision 1999/325/EC of 10 May 1999 providing macro-financial assistance to Bosnia and Herzegovina (OJ L 123, 13.5.1999, p. 57). Council Decision 1999/733/EC of 8 November 1999 providing supplementary macro-financial assistance to the former Yugoslav Republic of Macedonia (OJ L 294, 16.11.1999, p. 31). Council Decision 2001/549/EC of 16 July 2001 providing macro-financial assistance to the Federal Republic of Yugoslavia (OJ L 197, 2
- Definitive adoption (EU, Euratom) 2015/339 of the European Union’s general budget for the financial year 2015 Act · Grade B
The budget presents appropriations and resources by purpose (activity-based budgeting), with a view to enhancing transparency in the management of the budget with reference to the objectives of sound financial management and in particular efficiency and effectiveness. The expenditure authorised by the present budget totals EUR 145321531152 in commitment appropriations and EUR 141214040563 in payment appropriations, representing a variation rate of + 1,84 % and of + 1,57 % respectively by comparison with the 2014 budget. Budgetary revenue totals EUR 141214040563. The uniform rate of call for th
- Definitive adoption (EU, Euratom) 2015/339 of the European Union’s general budget for the financial year 2015 Act · Grade B
The Commission, when implementing this article, should take duly into account the outcomes of the meetings of the Interinstitutional Group on Information (IGI). The Commission has set out its communication strategy on the euro in the Communication of 11 August 2004 on the implementation of an information and communication strategy on the euro and Economic and Monetary Union (COM(2004) 552 final). The implementation of the communication strategy takes place in close coordination with the Member States and the European Parliament. The Commission reports regularly to the European Parliament’s rel
- Definitive adoption (EU, Euratom) 2015/339 of the European Union’s general budget for the financial year 2015 Act · Grade B
EUROPEAN UNION GUARANTEE FOR THE BORROWING PROGRAMMES CONTRACTED BY THE UNION TO PROVIDE FINANCIAL ASSISTANCE FOR THE COUNTRIES OF THE WESTERN BALKANS Legal basis Council Decision 97/471/EC of 22 July 1997 providing macro-financial assistance for the former Yugoslav Republic of Macedonia (OJ L 200, 29.7.1997, p. 59). Council Decision 1999/325/EC of 10 May 1999 providing macro-financial assistance to Bosnia and Herzegovina (OJ L 123, 13.5.1999, p. 57). Council Decision 1999/733/EC of 8 November 1999 providing supplementary macro-financial assistance to the former Yugoslav Republic of Macedonia