Commission Decision of 12 May 2011 concerning the technical specification for interoperability relating to the operation and traffic management subsystem of the trans-European conventional rail system (notified under document C(2011) 3099) (Text with EEA relevance) (2011/314/EU)
Grade B
mapped from publisher markup. A grade says how a document's structure was obtained, not how reliable the law is.
Address https://gelex.eu/eli/EU/decision/2011/314@2011-05-12/en
Contents
- Preamble
- ANNEX
- ANNEX TECHNICAL SPECIFICATION FOR INTEROPERABILITY FOR THE OPERATION AND TRAFFIC MANAGEMENT SUBSYTEM
- 1.
- 1.3.
- 2.
- 2.2.
- 2.2.1. Staff involved with the working of trains that will cross-state borders and proceed beyond the frontier location Staff working trains that do not cross state borders or do so as far as frontier locations
- 3.
- 4.
- 4.2.
- 4.2.1.
- 4.2.1.1.
- 1.
- 4.2.1.2.
- 4.2.1.2.2.
- 4.2.1.2.2.1.
- 4.2.2.
- 4.2.2.1.
- 4.2.2.1.3.
- 4.2.2.2.
- 4.2.2.4.
- 4.2.2.5.
- 4.2.2.6.
- 4.2.2.7.
- 4.2.3.
- 4.2.3.2.
- 4.2.3.3.
- 4.2.3.4.
- 4.2.3.4.2.
- 4.2.3.4.2.1.
- 4.2.3.5.
- 4.2.3.6.
- 4.3.
- 4.3.3.
- 4.6.
- 4.6.1.
- 4.6.1.1.
- 4.6.2.
- 4.6.2.2.
- 4.6.3.
- 4.6.3.1. A.
- 4.6.3.2.
- 4.6.3.2.3.
- 4.7.
- 4.7.4.
- 4.7.4.1.
- 4.7.4.1.2.
- 4.7.4.2.
- 4.7.5.
- 4.8.
- 5.
- 6.
- 6.2.
- 7.
- 7.1.
- 7.2.
- 7.3.
- 7.3.1.
- 7.3.2.
- Appendix A ERTMS/ETCS OPERATING RULES
- Appendix B OTHER RULES ENABLING A COHERENT OPERATION
- A.
- B.
- C.
- D.
- E.
- Appendix C SAFETY RELATED COMMUNICATIONS METHODOLOGY
- INTRODUCTION
- 1.
- 1.1.
- 1.1.1.
- 1.1.2.
- 1.1.3.
- 1.2.
- 1.2.1.
- 1.2.2.
- 1.2.2.2.
- 2.
- 3.
- 4.
- Appendix D INFORMATION TO WHICH THE RAILWAY UNDERTAKING MUST HAVE ACCESS IN CONNECTION WITH THE ROUTE(S) OVER WHICH HE INTENDS TO OPERATE
- PART 1.
- PART 2.
- 2.1.2.1.1.2.1.2.
- 2.2.2.2.1.2.2.2.2.2.3.2.2.4.2.2.5.
- 2.3.2.3.1.2.3.2.2.3.3.2.3.4.2.3.5.2.3.6.2.3.7.2.3.8.2.3.9.2.3.10.2.3.11.2.3.12.2.3.13.
- PART 3.
- 3.1.3.1.1.3.1.2.3.1.3.3.1.4.3.1.5.3.1.6.3.1.7.3.1.8.3.1.9.3.1.10.3.1.11.3.1.12.3.1.13.3.1.14.
- 3.2.3.2.1.3.2.2.3.2.3.3.2.4.3.2.5.3.2.6.3.2.7.3.2.8.3.2.9.3.2.10.3.2.11.3.2.12.3.2.13.3.2.14.3.2.15.3.2.16.3.2.17.3.2.18.
- 3.3.3.3.1.3.3.2.3.3.3.3.3.4.3.3.5.3.3.6.3.3.7.3.3.8.3.3.9.3.3.10.3.3.11.3.3.12.3.3.13.3.3.14.3.3.15.3.3.16.3.3.17.3.3.18.3.3.19.3.3.20.3.3.21.
- 3.4.3.4.1.3.4.2.3.4.3.3.4.4.
- ERTMS/ETCS 3.4.5.3.4.6.3.4.7.3.4.8.3.4.9.
- Class B train protection, control and warning system(s) 3.4.14.
- 3.5.3.5.1.3.5.2.3.5.3.3.5.4.3.5.5.3.5.6.
- Appendix E LANGUAGE AND COMMUNICATION LEVEL —
- Appendix F
- Appendix G
- Appendix H
- Appendix I
- Appendix J MINIMUM ELEMENTS RELEVANT TO PROFESSIONAL QUALIFICATION FOR THE TASKS ASSOCIATED WITH ACCOMPANYING TRAINS
- 1.
- 2.
- 2.1.
- 2.2.
- 2.3.
- 2.4.
- 3.
- Appendix K
- Appendix L MINIMUM ELEMENTS RELEVANT TO PROFESSIONAL QUALIFICATION FOR THE TASK OF PREPARING TRAINS
- 1.
- 2.
- 2.1.
- 2.2.
- 2.3.
- 3.
- Appendix M
- Appendix N
- Appendix O
- Appendix P
- PART 0
- Standard number and linked abbreviations
- PART 1
- PART 2
- PART 3
- Examples 1 2 —
- PART 4 Information relating to third countries is given for information purposes only
- PART 5 Notes: (a)(b)
- PART 6
- PART 7
- PART 8
- PART 9
- PART 10 CODES FOR THE TECHNICAL CHARACTERISTICS OF HAULED PASSENGER STOCK (DIGITS 5-6)
- PART 11 CODES FOR THE TECHNICAL CHARACTERISTICS OF SPECIAL VEHICLES (DIGIT 6 TO 8) Authorised speed for special vehicles (digit 6)
- PART 12
- DEFINITION OF THE CATEGORY AND INDEX LETTERS
- CATEGORY LETTER: F — OPEN HIGH-SIDED WAGON
- CATEGORY LETTER: H — COVERED WAGON
- CATEGORY LETTER: I — TEMPERATURE CONTROLLED WAGON
- CATEGORY LETTER: L — FLAT WAGON WITH SEPARATE AXLES
- CATEGORY LETTER: S — FLAT BOGIE WAGON
- CATEGORY LETTER: T — WAGON WITH OPENING ROOF
- CATEGORY LETTER: U — SPECIAL WAGONS
- CATEGORY LETTER: Z — TANK WAGON
- PART 13
- PART 14
- Appendix Pa
- PART 0
- PART 1
- PART 2
- PART 3
- Examples 1 2 —
- PART 4
- PART 5 Notes: (a)(b)
- PART 6
- PART 7
- PART 8
- PART 9
- PART 10
- PART 11
- PART 12
- PART 13
- PART 14
- Appendix Q
- Appendix R
- Appendix S
- Appendix T BRAKING PERFORMANCE
- A.
- B.
- C.
- Appendix U LIST OF OPEN POINTS
- APPENDIX B (SEE POINT 4.4 OF THIS TSI)
- POINT 4.2.2.1.3.3
- Appendix V
- Appendix W GLOSSARY
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Directive 2008/57/EC of the European Parliament and of the Council of 17 June 2008 on the interoperability of the rail system within the Community, and in particular Article 6(1) thereof,
Whereas:
(1) Article 12 of Regulation (EC) No 881/2004 of the European Parliament and of the Council of 29 April 2004 establishing a European Railway Agency requires the European Railway Agency (hereinafter referred to as the Agency) to ensure that the technical specifications for interoperability (hereinafter referred to as TSIs) are adapted to technical progress and market trends and to the social requirements and to propose to the Commission the amendments to the TSIs which it considers necessary.
(2) By Decision C(2007) 3371 of 13 July 2007, the Commission gave a framework mandate to the Agency to perform certain activities under Council Directive 96/48/EC of 23 July 1996 on the interoperability of the trans-European high-speed rail system and Directive 2001/16/EC of the European Parliament and of the Council of 19 March 2001 on the interoperability of the trans-European conventional rail system. Under the terms of that framework mandate, the Agency was requested to revise the TSI adopted by Commission Decision 2006/920/EC of 11 August 2006 concerning the technical specification of interoperability relating to the subsystem Traffic Operation and Management of the trans-European conventional rail system.
(3) On 17 July 2009, the Agency issued four recommendations concerning European Rail Traffic Management System (ERTMS) operating rules (ERA/REC/2009-02/INT), the revision of Annex P of the TSIs on operation and traffic management (ERA/REC/2009-03/INT), the revision of Annex T of the TSI on operation and traffic management for conventional rail (ERA/REC/2009-04/INT), and the consistency with Directive 2007/59/EC in respect to train driver competencies (ERA/REC/2009-05/INT), respectively. Those four recommendations led to the draft Commission decision amending Decisions 2006/920/EC and 2008/231/EC concerning TSIs on operation and traffic management, which, on 25 February 2010, received the positive opinion of the Committee established in accordance with Article 29(1) of Directive 2008/57/EC.
(4) The Agency’s recommendation of 7 May 2010 (ERA/REC/03-2010/INT) proposes further amendments to the TSI on operation and traffic management for conventional rail concerning, inter alia, train visibility (rear end), identifications of trains, and consistency with Directive 2004/49/EC of the European Parliament and of the Council of 29 April 2004 on safety on the Community’s railways and amending Council Directive 95/18/EC on the licensing of railway undertakings and Directive 2001/14/EC on the allocation of railway infrastructure capacity and the levying of charges for the use of railway infrastructure and safety certification.
(5) For the sake of clarity and simplicity, it is appropriate to replace Decision 2006/920/EC.
(6) The TSI set out in the Annex should not demand the use of specific technologies or technical solutions except where this is strictly necessary for the interoperability of the trans-European conventional rail system.
(7) Implementation of the TSI set out in the Annex and conformity with the relevant points of that TSI must be determined in accordance with an implementation plan that each Member State is required to update for the lines for which it is responsible.
(8) Rail traffic currently operates under existing national, bilateral, multinational or international agreements. It is important that those agreements do not hinder current and future progress towards interoperability. To this end, it is necessary that the Commission examine those agreements in order to determine whether the TSI set out in the Annex needs to be revised accordingly.
(9) The measures provided for in this Decision are in conformity with the opinion of the Committee established in accordance with Article 29(1) of Directive 2008/57/EC,
HAS ADOPTED THIS DECISION:
Article 1
1. The technical specification for interoperability (TSI) relating to the operation and traffic management subsystem of the trans-European conventional rail system, as set out in the Annex, is adopted.
2. The TSI set out in the Annex to this Decision shall apply to the operation and traffic management subsystem as described in point 2.4 of Annex II to Directive 2008/57/EC.
Article 2
1. The Agency shall publish on its website the lists of codes referred in parts 9, 10, 11, 12 and 13 of Appendix Pa.
2. The Agency shall keep the lists of codes referred to in paragraph 1 up to date and inform the Commission of their evolution. The Commission shall inform the Member States of the evolution of these codes through the Committee established in accordance with Article 29 of Directive 2008/57/EC.
Article 3
Until 31 December 2013, if a vehicle as defined in Article 2(c) of Directive 2008/57/EC is sold or rented for a continuous period exceeding six months and if all technical characteristics under which the vehicle has been authorised to be placed in service remain unchanged, its European Vehicle Number (hereinafter referred to as EVN) may be changed through a new registration of the vehicle and withdrawal of the first registration. If that new registration concerns a Member State which is different from that of the first registration, the registering entity competent for the new registration may require a copy of the documentation related to the former registration. Such change of EVN is without prejudice to the application of Articles 21 to 26 of Directive 2008/57/EC as far as the authorisation procedures are concerned. The administrative costs incurred to change the EVN shall be borne by the applicant requesting the change of EVN.
Article 4
Member States shall notify the following types of agreement to the Commission within six months of the entry into force of the TSI set out in the Annex, provided that they were not already notified under Decision 2006/920/EC:
1. national agreements between the Member States and railway undertakings or infrastructure managers, agreed on either a permanent or a temporary basis and required by the very specific or local nature of the intended transport service;
2. bilateral or multilateral agreements between railway undertakings, infrastructure managers or safety authorities which deliver significant levels of local or regional interoperability;
3. international agreements between one or more Member States and at least one third country, or between railway undertakings or infrastructure managers of Member States and at least one railway undertaking or infrastructure manager of a third country which deliver significant levels of local or regional interoperability.
Article 5
Each Member State shall update the national implementation plan of the TSI which it established in accordance with Article 4 of Decision 2006/920/EC. The updated implementation plan shall be drawn up in accordance with Chapter 7 of the Annex to this Decision. Each Member State shall forward the updated implementation plan to the other Member States and the Commission by 31 December 2012 at the latest.
Article 6
Commission Decision 2006/920/EC is repealed with effect from 1 January 2012.
Article 7
This Decision shall apply from 1 January 2012. However,
1. Appendix P shall apply from 1 January 2012 until 31 December 2013;
2. Appendix Pa shall apply from 1 January 2014.
Article 8
This Decision is addressed to the Member States.
Done at Brussels, 12 May 2011. For the Commission Siim Kallas Vice-President
ANNEX
ANNEX TECHNICAL SPECIFICATION FOR INTEROPERABILITY FOR THE OPERATION AND TRAFFIC MANAGEMENT SUBSYTEM
1. INTRODUCTION
1.
1.1. Technical scope This Technical Specification for Interoperability (hereinafter referred to as TSI) concerns the operation and traffic management subsystem shown in the list contained in point 1 of Annex II to Directive 2008/57/EC. Further information on this subsystem is provided in Chapter 2.
1.2. Geographical scope The geographical scope of this TSI is the trans-European conventional rail system as described in Annex I to Directive 2008/57/EC.
1.3. Content of this TSI In accordance with Article 5(3) of Directive 2008/57/EC, this TSI: Moreover, in accordance with Article 5(5) of Directive 2008/57/EC, provision may be made for specific cases for each TSI. These are indicated in Chapter 7. This TSI also comprises, in Chapter 4, the operating and maintenance rules specific to the scope indicated in points 1.1 and 1.2 of this Annex.
1.3.
(a) indicates its intended scope for the operation and traffic management subsystem — Chapter 2;
(b) lays down essential requirements for the subsystem concerned and its interfaces vis-à-vis other subsystems — Chapter 3;
(c) establishes the functional and technical specifications to be met by the target subsystem and its interfaces vis-à-vis other subsystems. If necessary, these specifications may vary according to the use of the subsystem, for example according to the categories of line, hub and/or rolling stock provided for in Annex I to Directive 2008/57/EC — Chapter 4;
(d) determines the interoperability constituents and interfaces covered by European specifications, including European standards, which are necessary to achieve interoperability within the trans-European conventional rail system — Chapter 5;
(e) states, in each case under consideration, which procedures are to be used in order to assess the conformity or suitability for use of the interoperability constituents — Chapter 6;
(f) indicates the strategy for implementing the TSI. In particular, it is necessary to specify the stages to be completed and the elements that can be applied in order to make a gradual transition from the existing situation to the final situation in which compliance with the TSI must be the norm — Chapter 7;
(g) indicates, for the staff concerned, the professional qualifications and health and safety conditions at work required for the operation and maintenance of the subsystem concerned, as well as for the implementation of the TSI — Chapter 4.
2. DESCRIPTION OF SUBSYSTEM/SCOPE
2.
2.1. Subsystem The operation and traffic management subsystem is described in point 2.4. of Annex II to Directive 2008/57/EC as: The procedures and related equipment enabling a coherent operation of the different structural subsystems, both during normal and degraded operation, including in particular training and train driving, traffic planning and management. The professional qualifications which may be required for carrying out cross-border services.
2.2. Scope This TSI applies to the operation and traffic management subsystem of infrastructure managers (hereinafter referred to as IM) and railway undertakings (hereinafter referred to as RU) related to the operation of trains on the conventional rail TEN lines. The specifications laid down in the TSI on operation and traffic management may be used as a reference document for the operation of trains even if they are not covered by the scope of this TSI.
2.2.
2.2.1. Staff involved with the working of trains that will cross-state borders and proceed beyond the frontier location Staff working trains that do not cross state borders or do so as far as frontier locations
Staff and trains Points 4.6 and 4.7 apply to those staff undertaking the safety-critical tasks of accompanying a train, when this involves crossing a border(s) between states and working beyond any location(s) designated as the frontier in the network statement of an infrastructure manager and included in his safety authorisation. Point 4.6.2 also applies to train drivers as stipulated by point 8 of Annex VI to Directive 2007/59/EC. A staff member will not be considered as crossing a border if the activity only involves working as far as any frontier locations as described in the first paragraph of this point. For those staff undertaking the safety-critical tasks of despatching trains and authorising train movements, mutual recognition of professional qualifications and health and safety conditions between Member States will apply. For those staff undertaking the safety-critical tasks associated with the last preparation of a train before it is scheduled to cross a border(s) and work beyond any frontier location(s) as described in the first paragraph of this point, point 4.6 will apply with mutual recognition between Member States of health and safety conditions. A train will not be considered to be a cross border service, if all the vehicles of the train crossing the state border cross it only to the frontier location(s) as described in the first paragraph of this point. This can be summarised in the tables below: Task Professional Qualifications Medical Requirements Accompanying a Train 4.6 4.7 Authorising Train movements Mutual recognition Mutual recognition Train Preparation 4.6 Mutual recognition Train Despatch Mutual recognition Mutual recognition Task Professional Qualifications Medical Requirements Accompanying a Train Mutual recognition Mutual recognition Authorising Train movements Mutual recognition Mutual recognition Train Preparation Mutual recognition Mutual recognition Train Despatch Mutual recognition Mutual recognition
2.2.2. Principles This TSI covers those elements (as set out in Chapter 4) of the conventional rail operation and traffic management subsystem, where principally there are operational interfaces between RU and IM and where there is a particular benefit to interoperability. RU and IM must ensure that all requirements concerning rules and procedures as well as documentation are met by the establishment of the appropriate processes. The set up of these processes is a relevant part of RU’s and IM’s safety management system (hereinafter referred to as SMS) as required by Directive 2004/49/EC. The SMS itself is assessed by the relevant national safety authority (hereinafter referred to as NSA) before granting safety certificate/authorisation.
2.2.3. Applicability to existing vehicles and infrastructure While the majority of the requirements contained in this TSI relate to processes and procedures, a number also relate to physical elements, trains and vehicles which are important for operation. The design criteria for these elements are described in the TSIs covering other subsystems such as rolling stock. In the context of this TSI it is their operational function that is considered.
3. ESSENTIAL REQUIREMENTS
3.
3.1. Compliance with the essential requirements In accordance with Article 4(1) of Directive 2008/57/EC, the trans-European conventional rail system, its subsystems and their interoperability constituents must meet the essential requirements set out in general terms in Annex III to the Directive.
3.2. Essential requirements — overview The essential requirements cover: According to Directive 2008/57/EC, the essential requirements may be generally applicable to the whole trans-European conventional rail system or be specific to each subsystem and its constituents. The following table summarises the correspondence between the essential requirements set out in Annex III to Directive 2008/57/EC and the present TSI. Clause Clause Title Safety Reliability & Availability Health Environmental protection Technical compatibility Essential requirements specific to operation and traffic management 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.2 1.3.1 1.3.2 1.4.1 1.4.2 1.4.3 1.4.4 1.4.5 1.5 2.6.1 2.6.2 2.6.3 4.2.1.2 Documentation for drivers X X X 4.2.1.2.1 Rule book X X X 4.2.1.2.2 Route book X X 4.2.1.2.2.1 Preparation of the Route book X 4.2.1.2.2.2 Modification to Information contained within the route book X X 4.2.1.2.2.3 Informing the driver in real time X X X 4.2.1.2.3 Time tables X X X 4.2.1.2.4 Rolling stock X X X 4.2.1.3 Documentation for railway undertaking staff other than drivers X X X 4.2.1.4 Documentation for infrastructure manager’s staff authorising train movements X X X 4.2.1.5 Safety-related communications between train crew, other railway undertaking staff and staff authorising train movements X X X X 4.2.2.1 Train visibility X X X 4.2.2.1.1 General requirement X X X 4.2.2.1.2 Front end X X X 4.2.2.1.3 Rear end X X X 4.2.2.2 Train audibility X X X X 4.2.2.2.1 General requirement X X X 4.2.2.2.2 Control X X 4.2.2.3 Vehicle identification X X X 4.2.2.4 Safety of passengers and load X 4.2.2.5 Train composition X 4.2.2.6 Train braking X X X 4.2.2.6.1 Minimum requirements of the braking system X X X 4.2.2.6.2 Braking performance X X X 4.2.2.7 Ensuring that the train is in running order X X X 4.2.2.7.1 General requirement X X 4.2.2.7.2 Data required X X 4.2.2.8 Requirements for Signal and lineside marker sighting X X 4.2.2.9 Driver vigilance X 4.2.3.1 Train planning X X X 4.2.3.2 Identification of trains X X X 4.2.3.3 Train departure X X 4.2.3.3.1 Checks and tests before departure X X X X 4.2.3.3.2 Informing the Infrastructure Manager of the train's operational status X X X X 4.2.3.4 Traffic management X X X 4.2.3.4.1 General requirements X X X 4.2.3.4.2 Train reporting X X X 4.2.3.4.2.1 Data required for train position reporting X X 4.2.3.4.2.2 Predicted hand over time X X 4.2.3.4.3 Dangerous goods X X 4.2.3.4.4 Operational quality X X 4.2.3.5 Data recording X X 4.2.3.5.1 Recording of supervision data outside the train X X 4.2.3.5.2 Recording of supervision data on-board the train X X 4.2.3.6 Degraded operation X X X 4.2.3.6.1 Advice to other users X X 4.2.3.6.2 Advice to train drivers X 4.2.3.6.3 Contingency arrangements X X X 4.2.3.7 Managing an emergency situation X X X 4.2.3.8 Aid to train crew in the event of an incident or of a major rolling stock malfunction X 4.4 ERTMS operating rules X X 4.6 Professional qualifications X X X 4.7 Health and safety conditions X
safety,
reliability and availability,
health,
environmental protection,
technical compatibility.
4. CHARACTERISTICS OF THE SUBSYSTEM
4.
4.1. Introduction Taking into account all the relevant essential requirements, the operation and traffic management subsystem, as described in point 2.2, covers only the elements specified in this Chapter. In conformity with Directive 2001/14/EC, it is the overall responsibility of the infrastructure manager to provide all the appropriate requirements which must be met by trains permitted to run on his network, taking into account the geographic particularities of individual lines and the functional or technical specifications set out in this Chapter.
4.2. Functional and technical specifications of the subsystem The functional and technical specifications of the operation and traffic management subsystem comprise of the following:
specifications relating to staff,
specifications relating to trains,
specifications relating to train operations.
4.2.
4.2.1. Specifications relating to staff
4.2.1.
4.2.1.1. General requirements This point deals with staff who contributes to the operation of the subsystem by performing safety-critical tasks involving a direct interface between a railway undertaking and an infrastructure manager. The areas covered are: In addition, for the staff as defined in point 2.2.1., this TSI sets out requirements on:
4.2.1.1.
1. Railway undertaking staff:
1.
(a) undertaking the task of driving trains (referred to throughout this TSI as driver) and forming part of the train crew,
(b) undertaking tasks on-board (other than driving) and forming part of the train crew,
(c) undertaking the task of preparing trains.
2. Infrastructure manager’s staff undertaking the task of authorising the movement of trains
Documentation
Communication
Qualifications (see point 4.6. and Appendix L)
Health and safety conditions (see point 4.7)
4.2.1.2. Documentation for drivers The railway undertaking operating the train must supply the driver with all the necessary information and documentation required to carry out his duties. This information must take into account the necessary elements for operation in normal, degraded and emergency situations for the routes to be worked over and the rolling stock used on those routes.
4.2.1.2.
4.2.1.2.1. Driver’s Rule Book All the necessary procedures for the driver must be included in a document or a computer medium called the Driver’s Rule Book. The Driver's Rule Book must state the requirements for all the routes worked and the rolling stock used on those routes according to the situations of normal operation, degraded operation and in emergency situations which the driver may encounter. The Driver’s Rule Book must cover two distinct aspects: It must include procedures covering, as a minimum, the following aspects: The railway undertaking is responsible for compiling the Driver’s Rule Book. The railway undertaking must present the Driver's Rule Book in the same format for the entire infrastructure over which their drivers will work. The railway undertaking must compile the Driver’s Rule Book in such a way that the driver’s application of all operational rules is enabled. It must have two appendices: Messages and forms must remain in the operating language of infrastructure manager(s). The process for preparing and updating the Driver's Rule Book must include the following steps: The infrastructure manager must ensure that the content of the documentation provided to the railway undertaking(s) is complete and accurate. The railway undertaking must ensure that the content of the Driver’s Rule Book is complete and accurate.
one which describes the set of common rules and procedures valid across the TEN (taking into account the contents of Appendices A, B and C),
another which sets out any necessary rules and procedures specific to each infrastructure manager.
Staff safety and security,
Signalling and control command,
Train operation including degraded mode,
Traction and rolling stock,
Incidents and accidents.
Appendix 1: Manual of communication procedures;
Appendix 2: Book of Forms.
the infrastructure manager (or the organisation responsible for the preparation of the operating rules) must provide the railway undertaking with the appropriate information in the infrastructure manager’s operating language,
the railway undertaking must draw up the initial or updated document;
if the language chosen by the railway undertaking for the Driver’s Rule Book is not the language in which the appropriate information was originally supplied, it is the responsibility of the railway undertaking to arrange for any necessary translation and/or provide explanatory notes in another language.
4.2.1.2.2. Description of the line and the relevant line-side equipment associated with the lines worked over Drivers must be provided with a description of the lines and the associated line-side equipment for the lines over which they will operate and relevant to the driving task. Such information must be set out in a single document called the Route Book (which can either be a traditional document or computer based). The following is a list of information which must, as a minimum, be provided:
the general operating characteristics,
indication of rising and falling gradients,
detailed line diagram.
4.2.1.2.2.
4.2.1.2.2.1. Preparation of the route book The format of the Route Book must be prepared in the same manner for all the infrastructures worked over by the trains of an individual railway undertaking. The railway undertaking is responsible for the competent and correct compilation of the Route book (for example, arranging for any necessary translation and/or providing explanatory notes), using the information supplied by the infrastructure manager(s). The following information must be included (this list is not exhaustive): The infrastructure manager must ensure that the content of the documentation provided to the railway undertaking(s) is complete and accurate. The railway undertaking must ensure that the content of the Route Book is complete and accurate.
4.2.1.2.2.1.
(a) the general operating characteristics:
type of signalling and corresponding running regime (double track, reversible working, left or right hand running, etc.),
type of power supply,
type of ground-train radio equipment.
(b) indication of rising and falling gradients with their gradient values and location;
(c) detailed line diagram:
names of stations on the line and key locations and their location;
tunnels, including location, name, length, specific information such as the existence of walkways and points of safe egress as well as the location of safe places where evacuation of passengers can take place
essential locations such as neutral sections
permissible speed limits for each track, including, if necessary, differential speeds relating to certain types of train,
the responsible infrastructure manager
means of communication with the traffic management/control centre in normal and degraded mode
4.2.1.2.2.2. Modifications to information contained within the route book The infrastructure manager must advise the railway undertaking of any permanent or temporary modifications to information supplied in accordance with point 4.2.1.2.2.1. These changes must be grouped by the railway undertaking into a dedicated document or computer medium whose format must be the same for all the infrastructures worked over by the trains of an individual railway undertaking. The infrastructure manager must ensure that the content of the documentation provided to the railway undertaking(s) is complete and accurate. The railway undertaking must ensure that the content of the document grouping the modifications to information contained within the Route book is complete and accurate.
4.2.1.2.2.3. Informing the driver in real time The infrastructure manager must inform drivers of any changes to the line or relevant lineside equipment that have not been advised as modifications to information for the Route Book as set out in point 4.2.1.2.2.2.
4.2.1.2.3. Timetables The provision of train schedule information facilitates the punctual running of trains and assists in service performance. The railway undertaking must provide drivers with the information necessary for the normal running of the train and as a minimum include: Such train running information, which must be based on information supplied by the infrastructure manager, may be provided either electronically or in a paper format. Presentation to the driver must be consistent across all the lines over which the railway undertaking operates.
the train identification;
the train running days (if necessary);
the stopping points and the activities associated with them
other timing points;
the arrival/departure/passing times at each of those points.
4.2.1.2.4. Rolling stock The railway undertaking must provide the driver with all information relevant to the working of the rolling stock during degraded situations (such as trains requiring assistance). Such documentation must also focus on the specific interface with the infrastructure manager’s staff in these cases.
4.2.1.3. Documentation for railway undertaking staff other than drivers The railway undertaking must provide all members of his staff (whether on train or otherwise) who undertake safety-critical tasks involving a direct interface with the staff, equipment or systems of the infrastructure manager with the rules, procedures, rolling stock and route specific information it deems appropriate to such tasks. Such information shall be applicable in both normal and degraded operation. For staff on-board trains, the structure, format, content and process for preparation and updating of such information must be based on the specification set out in Subsection 4.2.1.2 of this TSI.
4.2.1.4. Documentation for infrastructure manager’s staff authorising train movements All the information necessary to ensure safety-related communication between staff authorising the movement of trains and train crews must be set out in: The infrastructure manager must draw up these documents in his operating language.
documents describing the Communications Principles (Appendix C);
the document entitled Book of forms.
4.2.1.5. Safety-related communications between train crew, other railway undertaking staff and staff authorising train movements The language used for safety-related communication between train crew, other railway undertaking staff (as defined in Appendix L) and the staff authorising train movements is the operating language (see glossary) used by the infrastructure manager on the route concerned. The principles for safety-related communication between train crew and staff responsible for authorising the movement of trains are to be found in Appendix C. In conformity with Directive 2001/14/EC, the infrastructure manager is responsible for publishing the operating language used by his personnel in daily operational use. Where, however, local practice requires that a second language is also provided for, it is the responsibility of the infrastructure manager to determine the geographic boundaries for its use.
4.2.2. Specifications relating to trains
4.2.2.
4.2.2.1. Train visibility
4.2.2.1.
4.2.2.1.1. General requirement The railway undertaking must ensure that trains are fitted with means of indicating the front and rear of the train.
4.2.2.1.2. Front end The railway undertaking must ensure that an approaching train is clearly visible and recognisable as such, by the presence and layout of its lit white front-end lights. The forward facing front-end of the leading vehicle of a train must be fitted with three lights in an isosceles triangle, as shown below. These lights must always be lit when the train is being driven from that end. The front lights must optimise train detectability (for example, to track workers and those using public crossings) (marker lights), provide sufficient visibility for the train driver (illumination of the line ahead, lineside information markers/boards, etc.) (head lights) by night and during low light conditions and must not dazzle the drivers of oncoming trains. The spacing, the height above rails, the diameter, the intensity of the lights, the dimensions and shape of the emitted beam in both day and night time operation are defined in the rolling stock TSI(hereinafter referred to as RST TSI).
4.2.2.1.3. Rear end The railway undertaking must provide the required means of indicating the rear of a train. The rear end signal must only be exhibited on the rear of the last vehicle of the train. It must be displayed as shown below.
4.2.2.1.3.
4.2.2.1.3.1. Passenger trains The rear end indication of a passenger train must consist of 2 steady red lights at the same height above buffer on the transversal axis.
4.2.2.1.3.2. Freight trains in international traffic The Member State must notify which of the following requirements will apply on the network of its Member State for trains that cross a border between Member States: Either The lamps or plates must be on the same height above buffer on the transversal axis. Member States that require 2 reflective plates must also accept 2 steady red lights as train rear end indication.
2 steady red lights, or
2 reflective plates of the following shape with white side triangles and red top and bottom triangle:
4.2.2.1.3.3. Freight trains not crossing a border between member states For freight trains not crossing a border between Member States the train rear end indication is an open point (see Appendix U).
4.2.2.2. Train audibility
4.2.2.2.
4.2.2.2.1. General requirement The railway undertaking must ensure that trains are fitted with an audible warning device to indicate the approach of a train.
4.2.2.2.2. Control The activation of the audible warning device must be possible from all driving positions.
4.2.2.3. Vehicle identification Each vehicle must have a number to uniquely identify it from any other rail vehicle. This number must be prominently displayed at least on each longitudinal side of the vehicle. It must also be possible to identify operational restrictions applicable to the vehicle. Further requirements are specified in Appendix P.
4.2.2.4. Safety of passengers and load
4.2.2.4.
4.2.2.4.1. Safety of load The railway undertaking must make sure that freight vehicles are safely and securely loaded and remain so throughout the journey.
4.2.2.4.2. Safety of passengers The railway undertaking must ensure that passenger transport is undertaken safely at the departure and during the journey.
4.2.2.5. Train composition The railway undertaking must define the rules and procedures to be followed by his staff so as to ensure that the train is in compliance with the allocated path. Train composition requirements must take into account the following elements: Additional constraints may be required or imposed due to the type of braking regime or traction type on a particular train.
4.2.2.5.
(a) the vehicles
all vehicles in the train must be in compliance with all the requirements applicable on the routes over which the train will run;
all vehicles on the train must be fit to run at the maximum speed at which the train is scheduled to run;
all vehicles on the train must be currently within their specified maintenance interval and will remain so for the duration (in terms of both time and distance) of the journey being undertaken;
(b) the train
the combination of vehicles forming a train must comply with the technical constraints of the route concerned and be within the maximum length permissible for forwarding and receiving terminals.
the railway undertaking is responsible for ensuring that the train is technically fit for the journey to be undertaken and remains so throughout the journey
(c) the weight and axle load
the weight of the train must be within the maximum permissible for the section of route, the strength of the couplings, the traction power and other relevant characteristics of the train. Axle load limitations must be respected.
(d) the maximum speed of the train
the maximum speed at which the train can run must take into account any restrictions on the route(s) concerned, braking performance, axle load and vehicle type.
(e) the kinematic envelope
the kinematic gauge of each vehicle (inclusive of any load) in the train must be within the maximum permissible for the section of route.
4.2.2.6. Train braking
4.2.2.6.
4.2.2.6.1. Minimum requirements of the braking system All vehicles in a train must be connected to the continuous automatic braking system as defined in the RST TSI. The first and last vehicles (including any traction units) in any train must have the automatic brake operative. In the case of a train becoming accidentally divided into two parts, both sets of detached vehicles must come automatically to a stand as a result of a maximum application of the brake.
4.2.2.6.2. Braking performance The infrastructure manager must provide the railway undertaking with the actual performance required. This data shall include, if necessary, conditions of use of braking systems possibly affecting the infrastructure such as magnetic, regenerative and eddy-current brake. The railway undertaking is responsible for ensuring that the train has sufficient braking performance by providing braking rules for its staff to be followed. The rules concerning braking performance have to be managed within the infrastructure manager’s and railway undertaking’s safety management system. Further requirements are specified in Appendix T.
4.2.2.7. Ensuring that the train is in running order
4.2.2.7.
4.2.2.7.1. General requirement The railway undertaking must define the process to ensure that all safety-related on-train equipment is in a fully functional state and that the train is safe to run. The railway undertaking must inform the infrastructure manager of any modification to the characteristics of the train affecting its performance or any modification that might affect the ability to accommodate the train in its allocated path. The infrastructure manager and the railway undertaking must define and keep up to date conditions and procedures for train running in degraded mode.
4.2.2.7.2. Data required The data required for safe and efficient operation and the process by which this data must be forwarded must comprise: The railway undertaking must ensure that this data is made available to the infrastructure manager(s) prior to the departure of the train. The railway undertaking must advise the infrastructure manager(s) if a train will not occupy its allocated path or is cancelled.
the train identification
the identity of the railway undertaking responsible for the train
the actual length of the train
if a train carries passengers or animals when it is not scheduled to do so
any operational restrictions with an indication of the vehicle(s) concerned (gauge, speed restrictions, etc.)
information the infrastructure manager requires for the transport of dangerous goods.
4.2.2.8. Requirements for signal and lineside marker sighting The driver must be able to observe signals and lineside markers, and they must be observable by the driver. The same applies for other types of lineside signs if they are safety related. Therefore, signals, lineside markers, signs and information boards must be designed and positioned in such a consistent way to facilitate this. Issues that must be taken into account include: Driving cabs must be designed in such a consistent way that the driver is able to easily see the information displayed to him.
that they are suitably sited so that train headlights allow the driver to read the information,
suitability and intensity of lighting, where required to illuminate the information,
where retro-reflectivity is employed, the reflective properties of the material used are in compliance with appropriate specifications and the signs are fabricated so that train headlights easily allow the driver to read the information.
4.2.2.9. Driver vigilance A means of onboard monitoring of driver vigilance is necessary. This shall intervene to bring the train to a stand if the driver does not react within a certain time; the time range is specified in the rolling stock TSI.
4.2.3. Specifications relating to train operations
4.2.3.
4.2.3.1. Train planning In accordance with Directive 2001/14/EC the infrastructure manager must advise what data is required when a train path is requested.
4.2.3.2. Identification of trains Each train must be identified by a train running number. The train running number is given by the infrastructure manager when allocating a train path and must be known by the railway undertaking and all infrastructure managers operating the train. The train running number must be unique per network. Changes of train running number during a train journey should be avoided.
4.2.3.2.
4.2.3.2.1. Format of train running number The train running number format is defined in the control-command and signalling TSI (hereinafter referred to as CCS TSI)
4.2.3.3. Train departure
4.2.3.3.
4.2.3.3.1. Checks and tests before departure The railway undertaking must define the checks and tests to ensure that any departure is undertaken safely (e.g. doors, load, brakes).
4.2.3.3.2. Informing the infrastructure manager of the train's operational status The railway undertaking shall inform the infrastructure manager when a train is ready for access to the network. The railway undertaking must inform the infrastructure manager of any anomaly affecting the train or its operation having possible repercussions on the train's running prior to departure and during the journey.
4.2.3.4. Traffic management
4.2.3.4.
4.2.3.4.1. General requirements Traffic management must ensure the safe, efficient and punctual operation of the railway, including effective recovery from service disruption. The infrastructure manager must determine procedures and means for: Any additional processes required by the railway undertaking and which affect the interface with the infrastructure manager(s) can be introduced after being agreed with the infrastructure manager.
the real time management of trains,
operational measures to maintain the highest possible performance of the infrastructure in case of delays or incidents, whether actual or anticipated, and
the provision of information to the railway undertaking(s) in such cases.
4.2.3.4.2. Train reporting
4.2.3.4.2.
4.2.3.4.2.1. Data required for train position reporting The infrastructure manager must:
4.2.3.4.2.1.
(a) provide a means of real time recording of the times at which trains depart from, arrive at or pass appropriate pre-defined reporting points on their networks and the delta-time value;
(b) provide the specific data required in relation to train position reporting. Such information must include:
Train identification
Identity of reporting point
Line on which the train is running
Scheduled time at reporting point
Actual time at reporting point (and whether depart, arrive or pass — separate arrival and departure times must be provided in respect of intermediate reporting points at which the train calls)
Number of minutes early or late at the reporting point
Initial explanation of any single delay exceeding 10 minutes or as otherwise required by the performance monitoring regime
Indication that a report for a train is overdue and the number of minutes by which it is overdue
Former train identification(s), if any
Train cancelled for a whole or a part of its journey.
4.2.3.4.2.2. Predicted hand over time The infrastructure manager must have a process, which enables an indication of the estimated number of minutes of deviation from the scheduled time a train is scheduled to be handed over from one infrastructure manager to another. This must include information on service disruption (description and location of problem).
4.2.3.4.3. Dangerous goods The railway undertaking must define the procedures to supervise the transport of dangerous goods. These procedures must include:
the provisions as specified in Directive 2008/68/EC of the European Parliament and of the Council
advice to the driver of the presence and position of dangerous goods on the train
information the infrastructure manager requires for transport of dangerous goods
determination, in conjunction with the infrastructure manager, of lines of communication and planning of specific measures in case of emergency situations involving the goods.
4.2.3.4.4. Operational quality The infrastructure manager and the railway undertaking must have processes in place to monitor the efficient operation of the all the services concerned. Monitoring processes must be designed to analyse data and detect underlying trends, both in terms of human error and system error. The results of this analysis must be used to generate improvement actions, designed to eliminate or mitigate against events which could compromise the efficient operation of the network. Where such improvement actions would have network-wide benefits, involving other infrastructure managers and railway undertakings, they must, subject to commercial confidentiality, be communicated accordingly. Events that have significantly disrupted operations must be analysed as soon as possible by the infrastructure manager. Where appropriate, and in particular where one of their staff is concerned, the infrastructure manager must invite those railway undertaking(s) involved in the event concerned to participate in the analysis. Where the result of such analysis leads to network improvement recommendations designed to eliminate or mitigate against causes of accidents/incidents, these must be communicated to all relevant infrastructure managers and railway undertakings concerned. These processes shall be documented and subject to internal audit.
4.2.3.5. Data recording Data pertaining to the running of a train must be recorded and retained for the purposes of: It must be possible to match recorded data to: Requirements with regard to storage, periodic evaluation of and access to this data are specified in relevant national laws of the Member State:
Supporting systematic safety monitoring as a means of preventing incidents and accidents.
Identifying driver, train and infrastructure performance in the period leading up to and (if appropriate) immediately after an incident or accident, to enable the identification of causes related to train driving or train equipment, and supporting the case for new or changed measures to prevent recurrence.
To record information relating to the performance of both the locomotive/traction unit and the person driving.
the date and time of the recording
the precise geographic location of the event being recorded (distance in kilometres from a recognisable location)
the train identification
the identity of the driver
in which the railway undertaking is licensed (with regard to on-board recorded data), or
of the Member State in which the infrastructure is located (with regard to data recorded outside the train).
4.2.3.5.
4.2.3.5.1. Recording of supervision data outside the train As a minimum, the infrastructure manager must record the following data:
the failure of line-side equipment associated with the movement of trains (signalling, points etc.);
the detection of an overheating axle bearing, where this equipment is provided;
communication between the train driver and infrastructure manager’s staff authorising train movements.
4.2.3.5.2. Recording of supervision data on-board the train As a minimum, the railway undertaking must record the following data:
the passing of signals at danger or end of movement authority without authority
application of the emergency brake
speed at which the train is running
any isolation or overriding of the on-board train control (signalling) systems
operation of the audible warning device (horn)
operation of door controls (release, closure)
detection by on-board hot axle box detectors, if fitted
identity of the cab for which data is being recorded to be checked.
4.2.3.6. Degraded operation
4.2.3.6.
4.2.3.6.1. Advice to other users The infrastructure manager in conjunction with the railway undertaking(s) must define a process to immediately inform each other of any situation that impedes the safety, performance and/or the availability of the rail network or rolling stock.
4.2.3.6.2. Advice to train drivers In any case of degraded operation associated with the infrastructure manager’s area of responsibility, the infrastructure manager must give formal instructions to drivers on what measures to take in order to safely overcome the degradation.
4.2.3.6.3. Contingency arrangements The infrastructure manager in conjunction with all the railway undertakings operating over his infrastructure, and neighbouring infrastructure managers as appropriate, must define, publish and make available appropriate contingency measures and assign responsibilities based on the requirement to reduce any negative impact as a result of degraded operation. The planning requirements and the response to such events must be proportional to the nature and potential severity of the degradation. These measures, which must as a minimum include plans for recovering the network to normal status, may also address: The infrastructure manager must establish and keep updated contact information for key infrastructure manager and railway undertaking staff who may be contacted in the event of service disruption leading to degraded operation. This information must include contact details both during and outside office hours. The railway undertaking must submit this information to the infrastructure manager and advise the infrastructure manager of any changes to these contact details. The infrastructure manager must advise all the railway undertaking(s) of any changes to his details.
rolling stock failures (for example, those which could result in substantial traffic disruption, the procedures for rescuing failed trains);
infrastructure failures (for example, when there has been a failure of the electric power or the conditions under which trains may be diverted from the booked route);
extreme weather conditions.
4.2.3.7. Managing an emergency situation The infrastructure manager must, in consultation with: define, publish and make available appropriate measures to manage emergency situations and restore the line to normal operation. Such measures shall typically cover: The railway undertaking must provide the infrastructure manager with any specific information in respect to these circumstances, especially in respect to the recovery or re-railing of their trains. Additionally, the railway undertaking must have processes to inform passengers about onboard emergency and safety procedures.
all railway undertakings operating over his infrastructure, or, where appropriate, representative bodies of railway undertakings operating over his infrastructure,
neighbouring infrastructure managers, as appropriate,
local authorities, representative bodies of the emergency services (including fire fighting and rescue) at either local or national level, as appropriate.
collisions,
fires on train,
evacuation of trains,
accidents in tunnels,
incidents involving dangerous goods
derailments
4.2.3.8. Aid to train crew in the event of an incident or of a major rolling stock malfunction The railway undertaking must define appropriate procedures to assist the train crew in degraded situations in order to avoid or decrease delays caused by technical or other failures of the rolling stock (for example, lines of communication, measures to be taken in case of evacuation of a train).
4.3. Functional and technical specifications of the interfaces In the light of the essential requirements set out in Chapter 3, the functional and technical specifications of the interfaces are as follows:
4.3.
4.3.1. Interfaces with the infrastructure TSI Reference conventional rail operation TSI Reference conventional rail infrastructure TSI Parameter Point Parameter Point Braking performance 4.2.2.6.2 Longitudinal track resistance 4.2.7.2 Modifications to information contained in the route book 4.1.2.2.2 Operating rules 4.4 Degraded operation 4.2.3.6
4.3.2. Interfaces with the control-command and signalling TSI Reference conventional rail operation TSI Reference conventional rail CCS draft TSI Parameter Point Parameter Point Rule book 4.2.1.2.1 Operating rules 4.4 Operating rules 4.4 Signal and lineside marker sighting 4.2.2.8 Visibility of track-side control-command objects 4.2.16 Braking performance 4.2.2.6 Train braking performance and characteristics 4.3.2.3 Rule Book 4.2.1.2.1 Use of sanding equipment 4.2.10 Train running number 4.2.3.2.1 ETCS DMI 4.2.12 GSM-R DMI 4.2.13 Data recording onboard 4.2.3.5 Interface to data recording for regulatory purposes 4.2.15
4.3.3. Interfaces with the rolling stock TSI
4.3.3.
4.3.3.1. Interfaces with TSI on locomotives and passenger rolling stock TSI Reference conventional rail operation TSI Reference conventional rail locom. and pass. TSI Parameter Point Parameter Point Contingency arrangements 4.2.3.6.3 Rescue coupling 4.2.2.2.4 Train composition 4.2.2.5 Interface with infrastructure: axle load parameter 4.2.3.2 Minimum requirements of the braking system 4.2.2.6.1 Braking performance 4.2.4.5 Train visibility 4.2.2.1 External front and rear lights 4.2.7.1 Train audibility 4.2.2.2 Horn 4.2.7.2 Signal sighting 4.2.2.8 External visibility 4.2.9.1.3 Optical characteristics of the windscreen 4.2.9.2.2 Internal lighting 4.2.9.1.8 Driver vigilance 4.2.2.9 Driver's activity control function 4.2.9.3.1 Data recording 4.2.3.5.2 Recording device 4.2.9.5
4.3.3.2. Interfaces with TSI on freight wagons Reference conventional rail operation TSI Reference conventional freight wagon draft TSI Parameter Point Parameter Point Rear end 4.2.2.1.3.2 Attachment devices for rear-end signal 4.2.6.3 Rear end 4.2.2.1.3.2 Rear-end signal Annex E Train composition 4.2.2.5 Gauging 4.2.3.1 Train composition 4.2.2.5 Axle load parameter 4.2.3.3.2 Contingency arrangements 4.2.3.6.3 Lifting and jacking 4.2.2.2 Train braking 4.2.2.6 Brake 4.2.4
4.3.4. Interfaces with the Energy TSI Reference conventional rail operation TSI Reference conventional rail energy TSI Parameter Point Parameter Point Description of the line and the relevant line side equipment associated with the lines worked over 4.2.1.2.2 Management of power supply 4.4.2 Informing the driver in real time 4.2.1.2.2.3 Modifications to information contained within the route book 4.2.1.2.2.2 Execution of works 4.4.3
4.4. Operating rules The rules and procedures enabling coherent operation of new and different structural subsystems intended to be used in the TEN, and in particular those that are linked directly to the operation of a new train control and signalling system, must be identical where identical situations exist. To this end, the operating rules for the European Rail Traffic Management System (ERTMS/ETCS) and for ERTMS/GSM-R radio system are specified in Appendix A. Other operating rules, which are able to be standardised across the TEN, will be specified in Appendix B.
4.5. Maintenance rules Not applicable
4.6. Professional qualifications In accordance with point 2.2.1 of this TSI, this point deals with professional and linguistic competency and the assessment process required for staff to attain this competency.
4.6.
4.6.1. Professional competency Staff (including contractors) of the railway undertaking and the infrastructure manager must have attained appropriate professional competency to undertake all necessary safety-related duties in normal, degraded and emergency situations. Such competency comprises professional knowledge and the ability to put this knowledge into practice. Minimum elements relevant to professional qualification for individual tasks can be found in Appendices J and L.
4.6.1.
4.6.1.1. Professional knowledge Taking these appendices into account and dependant on the duties of the individual staff member concerned, the knowledge required will comprise the following:
4.6.1.1.
(a) general railway operation with particular emphasis on safety-critical activity:
principles of operation of their organisation’s safety management system;
the roles and responsibilities of the key players involved in interoperable operations;
appreciation of hazards, especially in relation to the risks involving railway operation and electric traction supply.
(b) appropriate knowledge of safety-related tasks in respect to procedures and interfaces for:
lines and line-side equipment;
rolling stock;
the environment.
4.6.1.2. Ability to put this knowledge into practice The ability to apply this knowledge in routine, degraded and emergency situations will require staff to be fully acquainted with: Staff must also possess a general ability to adapt to the different circumstances an individual may encounter. Railway undertakings and infrastructure managers are required to establish a competence management system to ensure that the individual competency of their staff involved is assessed and maintained. Additionally, training must be provided, as necessary, to ensure that knowledge and skills are kept up to date, especially in relation to weaknesses or deficiencies in system or individual performance.
the method and principles for applying these rules and procedures
the process for the use of line-side equipment and rolling stock, as well as any specific safety-related equipment
the principles of the safety management system to avoid the introduction of any undue risk to people and process.
4.6.2. Linguistic competency
4.6.2.
4.6.2.1. Principles The infrastructure manager and the railway undertaking are required to ensure that their relevant personnel are competent in the use of the communication protocols and principles set out in this TSI. Where the operating language used by the infrastructure manager differs from that habitually used by the railway undertaking’s personnel, such linguistic and communications training must form a critical part of the railway undertaking’s overall competency management system. Railway undertaking staff whose duties require them to communicate with staff of the infrastructure manager in connection with safety-critical matters, whether in routine, degraded or emergency situations, must have a sufficient level of knowledge in the operating language of the infrastructure manager.
4.6.2.2. Level of knowledge The level of knowledge in the infrastructure manager’s language must be sufficient for safety purposes. Guidance on the appropriate levels of competency is defined in Appendix E. The level of knowledge for drivers must be at least level 3. The level of knowledge for staff accompanying trains must be at least level 2.
4.6.2.2.
(a) As a minimum this must comprise of the driver being able to:
send and understand all the messages specified in Appendix C to this TSI;
effectively communicate in routine, degraded and emergency situations;
complete the forms associated with the use of the Book of Forms;
(b) Other members of the train crew whose duties require them to communicate with the infrastructure manager on safety-critical matters, must as a minimum, be able to send and understand information describing the train and its operational status.
4.6.3. Initial and ongoing assessment of staff
4.6.3.
4.6.3.1. Basic elements Railway undertakings and infrastructure managers are required to define the assessment process for their staff. It is recommended that account be taken of each of the following:
4.6.3.1. A.
Selection of personnel
evaluation of individual experience and competence
evaluation of individual competence in the use of any required foreign language(s) or the aptitude to learn them
B.
Initial professional training
analysis of training needs;
training resources
training of the trainers
C.
Initial assessment
basic conditions;
assessment programme, including practical demonstration;
qualification of the trainers.
deliver a certificate of competency.
D.
Competency retention
principles for retention of competency
methods to be followed
formalisation of the competency retention process.
assessment process.
E.
Refresher training
principles for ongoing training (including language)
4.6.3.2. Analysis of training needs
4.6.3.2.
4.6.3.2.1. Development of the analysis of training needs The railway undertaking and the infrastructure manager must undertake an analysis of training needs for their relevant staff. This analysis must set out both scope and complexity and take into account the risks associated with the operation of trains on the TEN, especially in relation to human capabilities and limitations (human factors) which may come about as a result of: Guidance on the elements that should be considered can be found in the appendices referred to in point 4.6.1. As appropriate, elements of the training for staff must be put in places which take these into account. It is possible that due to the type of operation envisaged by a railway undertaking or the nature of the network being run by an infrastructure manager, some of the elements in the appendices referred to in point 4.6.1. will not be appropriate. The analysis of training needs must document those not deemed appropriate and the reasons why.
differences in operating practices between infrastructure managers and the risks associated with changing between these;
the differences between tasks, operating procedures and communication protocols;
any difference in the operating language used by the infrastructure manager’s personnel;
local operating instructions which may include special procedures or particular equipment to be applied in certain cases, for example a specific tunnel.
4.6.3.2.2. Updating the analysis of training needs The railway undertaking and the infrastructure manager must define a process for reviewing and updating their individual training needs, taking into account issues such as previous audits, system feedback and known changes to rules and procedures, infrastructure and technology.
4.6.3.2.3. Specific elements for train crew and auxiliary staff
4.6.3.2.3.
4.6.3.2.3.1. Infrastructure knowledge The railway undertaking must ensure that the on board staff has appropriate knowledge for the relevant infrastructure. The railway undertaking must define the process by which knowledge of on board staff of the routes worked over is acquired and maintained. This process must be:
based upon the route information provided by the infrastructure manager and
in accordance with the process described in point 4.2.1.
4.6.3.2.3.2. Knowledge of rolling stock The railway undertaking must define the process for the acquisition and retention of traction and rolling stock knowledge by its train crew.
4.6.3.2.3.3. Auxiliary staff The railway undertaking must make sure that the auxiliary staff (for example, catering and cleaning) not forming part of the train crew is, in addition to their basic instruction, trained to respond to the instructions of the fully trained members of the train crew.
4.7. Health and safety conditions
4.7.
4.7.1. Introduction Staff specified in point 4.2.1 as staff performing safety-critical tasks in accordance with point 2.2 must have appropriate fitness to ensure that overall operational and safety standards are met. Railway undertakings and infrastructure managers must set up and document the process they put in place to meet the medical, psychological and health requirements for their staff within their safety management system. Medical examinations as specified in point 4.7.4 and any associated decisions on the individual fitness of staff must be conducted by a recognised occupational doctor. Staff must not perform safety-critical work whilst vigilance is impaired by substances such as alcohol, drugs or psychotropic medication. Therefore, the railway undertaking and the infrastructure manager must have in place procedures to control the risk that staff attend for work under the influence of such substances, or consume such substances at work. National rules of the Member State where a train service is operated apply with regard to defined limits of the above mentioned substances.
4.7.2. Deleted
4.7.3. Deleted
4.7.4. Medical examinations and psychological assessments
4.7.4.
4.7.4.1. Before appointment
4.7.4.1.
4.7.4.1.1. Minimum content of the medical examination Medical examinations must cover:
General medical examination;
Examinations of sensory functions (vision, hearing, colour perception);
Urine or blood analysis for the detection of diabetes mellitus and other conditions as indicated by the clinical examination;
Screening for drugs of abuse.
4.7.4.1.2. Psychological assessment The aim of the psychological assessment is to support the railway undertaking in the appointment and management of staff who have the cognitive, psychomotor, behavioural and personality capabilities to perform their roles safely. In determining the content of the psychological assessment the psychologist must, as a minimum, take the following criteria into account relevant to the requirements of each safety function: If the psychologist omits any of those elements, the respective decision must be justified and documented.
4.7.4.1.2.
(a) Cognitive:
Attention and concentration
Memory
Perceptive capability
Reasoning
Communication
(b) Psychomotor:
Speed of reaction
Gestured co-ordination
(c) Behavioural and personality
Emotional self control
Behavioural reliability
Autonomy
Conscientiousness
4.7.4.2. After appointment
4.7.4.2.
4.7.4.2.1. Periodicity of periodic medical examinations At least one systematic medical examination must be performed: Increased periodicity of examination must be set by the occupational doctor if the state of health of the member of the staff requires so.
Every 5 years for staff aged up to 40;
Every 3 years for staff aged between 41 and 62;
Every year for staff aged over 62.
4.7.4.2.2. Minimum content of the periodic medical examination If the worker complies with the criteria required at the examination, which is carried out before practising an occupation, the periodic specialised examinations must include as a minimum:
General medical examination;
Examination of sensory functions (vision, hearing, colour perception);
Urine or blood analysis for the detection of diabetes mellitus and other conditions as indicated by the clinical examination;
Screening for drugs of abuse where clinically indicated.
4.7.4.2.3. Additional medical examinations and/or psychological assessments Besides the periodic medical examination, an additional specific medical examination and/or psychological assessment must be performed where there is reasonable ground for doubting the medical or psychological fitness of a member of staff or reasonable suspicion of use of drugs of abuse or abuse or inappropriate use of alcohol. This would be the case especially after an incident or accident caused by human error on the part of the individual. The employer must request a medical examination after any sickness absence exceeding 30 days. In suitable cases such an examination can be limited to an assessment by the occupational doctor based on available medical information indicating that the employee’s fitness for work has not been affected. The railway undertaking and the infrastructure manager must put systems in place to ensure that such additional examinations and assessments are undertaken as appropriate.
4.7.5. Medical requirements
4.7.5.
4.7.5.1. General requirements Staff must not suffer from medical conditions or take medical treatment likely to cause: The following vision and hearing requirements must be met:
Sudden loss of consciousness;
Impairment of awareness or concentration;
Sudden incapacity;
Impairment of balance or co-ordination;
Significant limitation of mobility.
4.7.5.2. Vision requirements
Aided or unaided distance visual acuity: 0,8 (right eye + left eye — measured separately); minimum of 0,3 for the worse eye.
Maximum corrective lenses: hypermetropia + 5/myopia — 8. The occupational doctor may allow values outside this range in exceptional cases and after having sought the opinion of an eye specialist.
Intermediate and near vision: sufficient whether aided or unaided.
Contact lenses are allowed.
Normal colour vision: using a recognised test, such as the Ishihara, completed by another recognised test if required.
Vision field: normal (absence of any abnormality affecting the task to be performed)
Vision for both eyes: present
Binocular vision: present
Contrast sensitivity: good
Absence of progressive eye disease
Lens implants, keratotomies and keratectomies are allowed only on condition that they are checked on a yearly basis or according to a periodicity set by the occupational doctor.
4.7.5.3. Hearing requirements Sufficient hearing confirmed with tone audiogram, that is:
Hearing good enough to keep a phone conversation going and be able to hear alert tones and radio messages.
The following values given for information should be taken as guidelines:
The hearing deficiency must not be higher than 40 dB at 500 and 1000 Hz;
The hearing deficiency must not be higher than 45 dB at 2000 Hz for the ear with the worst air conduction of sound.
4.8. Registers of infrastructure and vehicles Due to the characteristics of the registers of infrastructure and vehicles, as defined in Articles 33, 34 and 35 of Directive 2008/57/EC, these registers are not suitable for the particular requirements of the operation and traffic management subsystem. Therefore this TSI specifies nothing in respect of these registers. However, there is an operational requirement for certain infrastructure related data items to be made available to a railway undertaking and conversely for certain rolling stock related items to be made available to an infrastructure manager, as specified in point 4.8.1 and point 4.8.2. In both cases the data concerned must be complete and accurate.
4.8.
4.8.1. Infrastructure The requirements for the conventional rail infrastructure related data items with regard to the operation and traffic management subsystem, and which must be made available to railway undertakings, are specified in Appendix D. The infrastructure manager is responsible for the correctness of the data.
4.8.2. Rolling stock The following rolling stock related data items must be available to infrastructure managers. The keeper is responsible for the correctness of the data:
whether the vehicle is constructed from materials which can be hazardous in case of accidents or fire (for example, asbestos)
length over buffers.
5. INTEROPERABILITY CONSTITUENTS
5.
5.1. Definition According to Article 2(f) of Directive 2008/57/EC, interoperability constituents means any elementary component, group of components, subassembly or complete assembly of equipment incorporated or intended to be incorporated into a subsystem, upon which the interoperability of the rail system depends directly or indirectly. The concept of a constituent covers both tangible objects and intangible objects such as software.
5.2. List of constituents In respect to the operation and traffic management subsystem, there are no interoperability constituents.
6. ASSESSMENT OF CONFORMITY AND/OR SUITABILITY FOR USE OF THE CONSTITUENTS AND VERIFICATION OF THE SUBSYSTEM
6.
6.1. Interoperability constituents As this TSI does not yet specify any interoperability constituents, no assessment arrangements are discussed.
6.2. Operation and traffic management subsystem
6.2.
6.2.1. Principles The operation and traffic management subsystem is a functional subsystem according to Annex II to Directive 2008/57/EC. In conformity with Articles 10 and 11 of Directive 2004/49/EC, railway undertakings and infrastructure managers must demonstrate compliance with the requirements of this TSI within their safety management system when applying for any new or amended safety certificate or safety authorisation. The common safety methods on conformity assessment require national safety authorities to set up an inspection regime to supervise and monitor the day to day compliance with the safety management system including all TSIs. It should be noted that none of the elements contained within this TSI require separate assessment by a Notified Body. Requirements in this TSI that refer to structural subsystems and are listed in the interfaces (point 4.3) are assessed under the relevant structural TSIs.
7. IMPLEMENTATION
7.
7.1. Principles Implementation of this TSI and conformity with the relevant points of this TSI must be determined in accordance with an implementation plan that must be drawn up by each Member State for the lines for which they are responsible. This plan must take into account: At this time any specific exceptions that may be applicable should be taken into account and documented as part of the plan. The implementation plan must take into account the various levels of potential for implementation from any of the following events, namely when: It is commonly understood that the full implementation of all elements of this TSI cannot be complete until the hardware (infrastructure, control and command, etc.) that is to be operated has been harmonised. The guidelines set out in this Chapter must therefore only be seen as an interim phase supporting migration to the target system.
7.1.
(a) the specific human factors issues associated with operating any given line;
(b) the individual operating and safety elements of each line involved; and
(c) whether implementation of the element(s) under consideration is to be:
for all trains on the line, or not,
only for certain lines,
applicable on all TEN lines,
applicable to all trains running on TEN lines
(d) the relationship with implementation with the other subsystems (control-command and signalling, rolling stock, etc.).
(a) a railway undertaking or infrastructure manager commences operations,
(b) a renewal or upgrade to the existing operational systems of a railway undertaking or infrastructure manager is introduced,
(c) new or upgraded infrastructure, energy, rolling stock or command control & signalling subsystems, requiring a corresponding set of operating procedures, are put into service.
7.2. Implementation guidelines There are three distinct elements to implementation:
7.2.
(a) Confirmation that any existing systems and processes comply with the requirements of this TSI
(b) Adaptation of any existing systems and processes to comply with the requirements of this TSI
(c) New systems and processes arising from implementation of other subsystems
New/upgraded conventional lines (infrastructure/energy)
New or upgraded ETCS signalling installations, GSM-R radio installations, Hot Axle Box Detectors, … (control-command and signalling)
New rolling stock (rolling stock)
7.3. Specific cases
7.3.
7.3.1. Introduction The following special provisions are permitted in the specific cases below. These specific cases belong to two categories:
7.3.1.
(a) the provisions apply either permanently (case P), or temporarily (case T).
(b) In temporary cases Member States shall conform with the relevant subsystem either by 2016 (case T1), or by 2024 (case T2).
7.3.2. List of specific cases
7.3.2.
7.3.2.1. Temporary specific case (T1) Estonia, Latvia and Lithuania For the implementation of point 4.2.2.1.3.2 of this TSI, trains which are operated solely on the 1520 mm gauge network of Estonia, Latvia and Lithuania may use another specified train rear end signal.
7.3.2.2. Temporary specific case (T2) Ireland and United Kingdom For the implementation of 4.2.3.2.1 of this TSI, Ireland and United Kingdom are using alphanumeric number in the existing systems. The MS set out the requirements and time schedule for the transition from alphanumeric train running numbers to numeric train running numbers in the target system.
Appendix A ERTMS/ETCS OPERATING RULES
The operating rules for ERTMS/ETCS and ERTMS/GSM-R are specified in the technical document ETCS and GSM-R rules and principles — Version 1 published on the ERA website (http://www.era.europa.eu).
Appendix B OTHER RULES ENABLING A COHERENT OPERATION
A.
GENERAL Reserved
B.
STAFF SAFETY AND SECURITY Reserved
C.
OPERATIONAL INTERFACE WITH SIGNALLING AND COMMAND AND CONTROL EQUIPMENT
C1. Sanding If the train is equipped with a manually activated sanding device, the driver shall always be allowed to apply sand but shall avoid it wherever possible: The exceptions to this are:
in the area of points and crossings,
during braking at speeds less than 20 km/h,
when at a standstill.
if there is a risk of SPAD (Signal Passed at Danger), or other serious incident and the application of sand would assist adhesion,
when starting away,
when required to test the sanding equipment on the traction unit (testing should normally be undertaken in areas specifically designated in the Infrastructure Register).
C2. Activation of Hot Axle Box Detectors Reserved
D.
TRAIN MOVEMENTS
D1. Normal conditions
D2. Degraded conditions Reserved
E.
ANOMALIES, INCIDENTS AND ACCIDENTS Reserved
Appendix C SAFETY RELATED COMMUNICATIONS METHODOLOGY
INTRODUCTION
This Appendix sets out the rules for safety-related ground-to-mobile and mobile-to-ground communications applicable to information transmitted or exchanged for safety-critical situations on the interoperable network and in particular to: This Appendix is to serve as basis: The extent to which forms are used and their structure may vary. For some risks the use of forms will be appropriate, whilst for others it will not be appropriate. In the context of a given risk, the Infrastructure Manager shall decide whether the use of a form is appropriate. A form should only be used if the value of its safety and performance benefits exceeds that of any safety and performance disadvantage. The Infrastructure Managers must structure his communications protocol in a formalised way and in line with the following three categories: To support the disciplined approach to transmission of these messages a Communications Methodology has been developed.
1.
1.1.
1.1.1.
1.1.2.
1.1.3.
1.2.
1.2.1.
1.2.2.
1.2.2.2.
2.
3.
4.
Appendix D INFORMATION TO WHICH THE RAILWAY UNDERTAKING MUST HAVE ACCESS IN CONNECTION WITH THE ROUTE(S) OVER WHICH HE INTENDS TO OPERATE
PART 1.
GENERIC INFORMATION REGARDING THE INFRASTRUCTURE MANAGER
1.1. Name(s)/identity of infrastructure manager(s)
1.2. Country (or Countries)
1.3. Brief description
1.4. List of general operational rules and regulations (and how to obtain them)
PART 2.
MAPS AND DIAGRAMS
2.1.2.1.1.2.1.2.
Geographic map Routes Principal locations (stations, yards, junctions, freight terminals)
2.2.2.2.1.2.2.2.2.2.3.2.2.4.2.2.5.
Line diagram Information to be included on diagrams, supplemented as necessary by text. Where a separate station/yard/depot diagram is provided then information on line diagram may be simplified Indication of distance Identification of running lines, loops, sidings and catch/trap points Connections between running lines Principal locations (stations, yards, junctions, freight terminals) Location and meanings of all fixed signals
2.3.2.3.1.2.3.2.2.3.3.2.3.4.2.3.5.2.3.6.2.3.7.2.3.8.2.3.9.2.3.10.2.3.11.2.3.12.2.3.13.
Station/Yard/Depot diagrams (NB: Applies only to locations available to interoperable traffic) Information to be identified on location specific diagrams, supplemented as necessary by text Name of location Location identity code Type of location (passenger terminal, freight terminal, yard, depot) Location and meanings of all fixed signals Identification and plan of tracks, including catch/trap points Identification of platforms Length of platforms Height of platforms Identification of sidings Length of sidings Availability of shore electric supply Distance between the edge of the platform and the centre of the track, parallel to the running surface (For passenger stations) Availability of access for disabled persons
PART 3.
SPECIFIC LINE SEGMENT INFORMATION
3.1.3.1.1.3.1.2.3.1.3.3.1.4.3.1.5.3.1.6.3.1.7.3.1.8.3.1.9.3.1.10.3.1.11.3.1.12.3.1.13.3.1.14.
General characteristics Country Line segment identification code: national code Line segment extremity 1 Line segment extremity 2 Times of opening for traffic (times, days, special arrangements for holidays) Lineside indications of distance (frequency, appearance and positioning) Type of traffic (mixed, passenger, freight, …) Maximum permissible speed(s) Any other information which is necessary for safety reasons Specific local operational requirements (including any special staff qualifications) Special restrictions for dangerous goods Special loading restrictions Model of temporary works notice (and way to obtain it) Indication that Line segment is congested (Article 22 of Directive 2001/14/EC)
3.2.3.2.1.3.2.2.3.2.3.3.2.4.3.2.5.3.2.6.3.2.7.3.2.8.3.2.9.3.2.10.3.2.11.3.2.12.3.2.13.3.2.14.3.2.15.3.2.16.3.2.17.3.2.18.
Specific technical characteristics EC verification for Infrastructure TSI Date of putting into service as an interoperable line List of possible specific cases List of possible specific derogations Track gauge Structure gauge Maximum axle load Maximum load per linear metre Transversal track forces Longitudinal track forces Minimum radius of curvature Gradient percentage Gradient location For brake systems that do not use wheel-rail adhesion, accepted braking effort Bridges Viaducts Tunnels Comments
3.3.3.3.1.3.3.2.3.3.3.3.3.4.3.3.5.3.3.6.3.3.7.3.3.8.3.3.9.3.3.10.3.3.11.3.3.12.3.3.13.3.3.14.3.3.15.3.3.16.3.3.17.3.3.18.3.3.19.3.3.20.3.3.21.
Energy subsystem EC verification for Energy TSI Date of putting into service as an interoperable line List of possible specific cases List of possible specific derogations Type of power supply system (e.g. none, overhead, third rail) Power supply system frequency (e.g. AC, DC) Minimum voltage Maximum voltage Restriction related to power consumption of specific electric traction unit(s) Restriction related to the position of Multiple Traction unit(s) to comply with contact line separation (position of pantograph) How to obtain electrical isolation Contact wire height Permissible contact wire gradient in relation to the track and the variation of the gradient Type of pantographs approved Minimum static force Maximum static force Location of neutral sections Information on operation Lowering of pantographs Conditions applying with regard to regenerative braking Maximum allowable train current
3.4.3.4.1.3.4.2.3.4.3.3.4.4.
Control-command and signalling subsystem EC verification for CCS TSI Date of putting into service as an interoperable line List of possible specific cases List of possible specific derogations
ERTMS/ETCS 3.4.5.3.4.6.3.4.7.3.4.8.3.4.9.
Level of application Optional functions installed lineside Optional functions required on board Software version number Placing-in-service date of this version
ERTMS/GSM-R radio 3.4.10.3.4.11.3.4.12.
Optional functions as specified in FRS Version number Placing-in-service date of this version
For ERTM/ETCS level 1 with infill function 3.4.13.
Technical implementation required for rolling stock
Class B train protection, control and warning system(s) 3.4.14.
National rules for operating Class B systems (and way to obtain them)
Line system 3.4.15.3.4.16.3.4.17.3.4.18.3.4.19.3.4.20.3.4.21.
Responsible Member State System name Software version number Placing-in-service date of this version End of period of validity Need for more than one system active simultaneously On-board system
Class B radio system 3.4.22.3.4.23.3.4.24.3.4.25.3.4.26.3.4.27.3.4.28.3.4.29.
Responsible Member State System name Version number Placing-in-service date of this version End of period of validity Special conditions to switch over between different Class B train protection, control and warning systems Special technical conditions required to switch over between ERTMS/ETCS and Class B Systems Special conditions to switch over between different radio systems
Technical degraded modes of: 3.4.30.3.4.31.3.4.32.3.4.33.3.4.34.
ERTM/ETCS Class B train protection, control and warning system ERTM/GSM-R Class B radio system Lineside signalling
Speed restrictions related to braking performance 3.4.35.3.4.36.
National rules for functioning Class B system 3.4.37.3.4.38.
National rules linked to braking performance Other national rules, e.g. data corresponding with UIC leaflet 512 (eighth edition of 1 January 1979 and two Amendments)
EMC susceptibility of infrastructure-side control-command and signalling 3.4.39.3.4.40.3.4.41.3.4.42.
Requirement to be specified according to European Standards Permissibility to use eddy-current brake Permissibility to use magnetic brake Requirements for technical solutions concerning implemented derogations
3.5.3.5.1.3.5.2.3.5.3.3.5.4.3.5.5.3.5.6.
Traffic operation and management subsystem EC verification for OPE TSI Date of putting into service as an interoperable line List of possible specific cases List of possible specific derogations Language used for safety-critical communications with infrastructure manager staff Special climatic conditions and associated arrangements
Appendix E LANGUAGE AND COMMUNICATION LEVEL —
The oral qualification in a language can be subdivided into five levels: Level Description 5 4 3 2 1 can talk using memorised sentences
can adapt the way he/she speaks to any interlocutor
can put forward an opinion
can negotiate
can persuade
can give advice
can cope with totally unforeseen situations
can make assumptions
can express an argued opinion
can cope with practical situations involving an unforeseen element
can describe
can keep a simple conversation going
can cope with simple practical situations
can ask questions
can answer questions
Appendix F
Not used
Appendix G
Not used
Appendix H
Not used
Appendix I
Not used
Appendix J MINIMUM ELEMENTS RELEVANT TO PROFESSIONAL QUALIFICATION FOR THE TASKS ASSOCIATED WITH ACCOMPANYING TRAINS
1. GENERAL REQUIREMENTS
1.
(a) This Appendix, which must be read in conjunction with points 4.6 and 4.7 is a list of the elements that are deemed to be relevant to the task of accompanying a train on the TEN.
(b) The expression professional qualification, when taken within the context of this TSI, refers to those elements that are important to ensuring that operational staff are trained and able to understand and discharge the elements of the task.
(c) Rules and procedures apply to the task being performed and to the person carrying out the task. These tasks may be carried out by any authorised qualified person irrespective of any name, job title or grade used in rules or procedures or by the individual company.
(d) Any authorised qualified person must carry out all rules and procedures related to the task being performed.
2. PROFESSIONAL KNOWLEDGE Any authorisation requires a successfully passed initial examination and provisions for ongoing assessment and training as described in point 4.6.
2.
2.1. General professional knowledge
2.1.
(a) General principles of safety management within the railway system, relevant to the task, including interfaces with other subsystems
(b) General conditions relevant to the safety of passengers or cargo and persons on or about the railway track
(c) Conditions of health and safety at work
(d) General principles of security of the railway system
(e) Personal safety including when leaving the train on the running line
2.2. Knowledge of operational procedures and safety systems applied to the infrastructure to be used
2.2.
(a) Operational procedures and safety rules
(b) Control command and signalling system
(c) Communications principles and formalised messaging procedure including use of communication equipment
2.3. Knowledge of rolling stock
2.3.
(a) Passenger vehicle interior equipment
(b) Repairing minor defects within the passenger areas of rolling stock, as required by the Railway Undertaking
2.4. Knowledge of the route
2.4.
(a) Operational arrangements (such as the method of train despatch) at individual locations (signalling, station equipment etc.)
(b) Stations at which passengers may alight or join
(c) Local operating and emergency arrangements specific to the line(s) of route
3. ABILITY TO PUT THE KNOWLEDGE INTO PRACTICE
3.
(a) Checks before departure, including brake tests and correct closure of the doors
(b) Departure processes
(c) Communication with passengers especially in relation to circumstances involving passenger safety
(d) Degraded operations
(e) Assess the potential of a defect within the passenger areas and react according to rules and procedures
(f) Protection and warning measures as required by the rules and regulations or in assistance to the driver
(g) Train evacuation and passenger safety especially if they are required to be on or near the line
(h) Communicate with the Infrastructure Manager’s staff when assisting the driver or during an evacuation incident
(i) Report any unusual occurrences concerning the operation of the train, the condition of the rolling stock and the safety of passengers. If required, these reports must be made in writing, in the language chosen by the Railway Undertaking.
Appendix K
Not used
Appendix L MINIMUM ELEMENTS RELEVANT TO PROFESSIONAL QUALIFICATION FOR THE TASK OF PREPARING TRAINS
1. GENERAL REQUIREMENTS This Appendix, which must be read in conjunction with point 4.6, gives a list of the elements that are deemed to be relevant to the task of preparing a train on the TEN.
1.
(a) The expression professional qualification, when taken within the context of this TSI, refers to those elements that are important to ensuring that operational staff are trained and able to understand and discharge the elements of the task.
(b) Rules and procedures apply to the task being performed and to the person carrying out the task. These tasks may be carried out by any authorised qualified person irrespective of any name, job title or grade used in rules or procedures or by the individual company.
(c) Any authorised qualified person must follow all rules and procedures related to the task being performed.
2. PROFESSIONAL KNOWLEDGE Any authorisation requires a successfully passed initial examination and provisions for ongoing assessment and training as described in point 4.6.
2.
2.1. General professional knowledge
2.1.
(a) General principles of safety management within the railway system, relevant to the task, including interfaces with other subsystems
(b) General conditions relevant to the safety of passengers and/or cargo including the carriage of dangerous goods and exceptional loads
(c) Conditions of health and safety at work
(d) General principles of security of the railway system
(e) Personal safety when on or in the vicinity of rail lines
(f) Communications principles and formalised messaging procedure including use of communication equipment
2.2. Knowledge of operational procedures and safety systems applied to the infrastructure to be used
2.2.
(a) Working of trains in normal, degraded and emergency conditions
(b) Operational procedures at individual locations (signalling, station/depot/yard equipment) and safety rules
(c) Local operating arrangements
2.3. Knowledge of train equipment
2.3.
(a) Purpose and use of wagon and vehicle equipment
(b) Identification of and arranging for technical inspections
3. ABILITY TO PUT THE KNOWLEDGE INTO PRACTICE
3.
(a) Application of train composition rules, train braking rules, train loading rules etc. to ensure the train is in running order
(b) Understanding of marking and labels on vehicles
(c) Process for determining and making train data available
(d) Communication with train crew
(e) Communication with staff responsible for controlling the movement of trains
(f) Degraded operations especially as it affects the preparation of trains
(g) Protection and warning measures as required by the rules and regulations or local arrangements at the location in question
(h) Actions to be taken in respect to incidents involving the carriage of dangerous goods (where relevant)
Appendix M
Not used
Appendix N
Not used
Appendix O
Not used
Appendix P
PART 0
VEHICLE IDENTIFICATION
General remarks 1.2.
This Appendix describes the number and linked marking applied in a visible manner on the vehicle to identify it uniquely in operation. It does not describe other numbers or markings eventually engraved or fixed in a permanent manner on the chassis or the main components of the vehicle during its construction. The conformity of the number and linked marking with the indications described in this Appendix is not mandatory for: Nevertheless, these vehicles must receive a temporary number permitting their operation.
vehicles that are only used on networks to which this TSI does not apply;
heritage vehicles, in a historical guise;
vehicles that are not normally used or transported on the networks to which this TSI applies.
Standard number and linked abbreviations
Each railway vehicle receives a number consisting of on 12 figures (called standard number) with the following structure: Types of rolling stock Type of vehicle and indication of the interoperability ability [2 figures] Country in which the vehicle is registered [2 figures] Technical characteristics [4 figures] Serial number [3 figures] Self-checking digit [1 figure] Wagons 00 to 09 10 to 19 20 to 29 30 to 39 40 to 49 80 to 89 [details in part 6] 01 to 99 [details in part.4] 0000 to 9999 [details in part 9] 001 to 999 0 to 9 [details in part 3] Hauled passenger vehicles 50 to 59 60 to 69 70 to 79 [details in part 7] 0000 to 9999 [details in part 10] 001 to 999 Tractive rolling stock 90 to 99 [details in part 8] 0000001 to 8999999 [the meaning of these figures is defined by the Member States, eventually by bilateral or multilateral agreement] Special vehicles 9000 to 9999 [details in part 11] 001 to 999 In a given country, the 7 digits of technical characteristics and serial number are sufficient to identify uniquely a vehicle inside each group of wagons, hauled passenger vehicles, tractive rolling stock and special vehicles Alphabetical markings complete the number: Technical characteristics, codes and abbreviations are managed by one or more bodies (hereafter designed as central body) to be proposed by ERA (European Railway Agency) as a result of activity No 15 of its work programme 2005.
markings linked to the interoperability ability (details in part 5);
abbreviation of the country in which the vehicle is registered (details in part 4);
keeper’s abbreviation (details in part 1);
abbreviation of the technical characteristics (details in part 13 for hauled passenger vehicles, part 12 for wagons, part 14 for special vehicles).
Allocation of number
The rules for the management of the numbers will be proposed by the ERA as part of the activity No 15 of its work programme 2005.
PART 1
VEHICLE KEEPER MARKING
Definition of the Vehicle Keeper Marking (VKM)
A Vehicle Keeper Marking (VKM) is an alphanumeric code, consisting of 2 to 5 letters. A VKM is inscribed on each rail vehicle, near the vehicle number. The VKM denominates the Vehicle Keeper as registered in the Rolling Stock Register. A VKM is unique in all countries covered by this TSI and all countries that enter into an agreement that involves the application of the system of vehicle numbering and vehicle keeper marking as described in this TSI.
Format of the Vehicle Keeper Marking
The VKM is representation of the full name or abbreviation of the vehicle keeper, if possible in a recognisable manner. All 26 letters of the Latina alphabet may be used. The letters in the VKM are written in capitals. Letters that do not stand for first letters of words in the keeper's name may be written in lower case. For checking uniqueness, the written name will be ignored. Letters may contain diacritical signs. Diacritical signs used by these letters are ignored for checking uniqueness. For vehicles of keepers that reside in a country that does not use the Latin alphabet, a translation of the VKM in its own alphabet may be applied behind the VKM separated from it by a slash-sign (/). This translated VKM is disregarded for data-processing purposes.
Exemptions for using a Vehicle Keeper Marking
Member States may decide to apply the following exemptions. A VKM is not required for the vehicles whose numbering system does not follow the present Appendix (cf. part 0, point 2). Nevertheless, adequate information about the identity of the vehicle keeper has to be provided to the organisations involved in their operation over networks to which this TSI applies. When the full name and address information is inscribed on the vehicle, a VKM is not required for: A VKM is not required for locomotives, multiple units and passenger vehicles used in national traffic only, when: When a company logo is applied in addition to besides the application of a VKM, only the VKM is valid and the logo is disregarded.
vehicles of keepers with such a limited vehicle fleet that this does not warrant the use of a VKM;
specialised vehicles for infrastructure maintenance.
they carry their keeper's logo and that logo contains the same and well recognisable letters as the VKM;
they carry a well recognisable logo that has been accepted by the competent national authority as an adequate equivalent for the VKM.
Provisions about allocation of Vehicle Keeper Markings
A vehicle keeper can be issued more than one VKM, in case: A single VKM can be issued for a group of companies:
the vehicle keeper has a formal name in more than one language;
a vehicle keeper has good cause to distinguish between separate vehicle fleets within his organisation.
that belong to single corporate structure that has appointed and mandated one organisation within this structure to handle all issues on behalf of all others;
that has mandated a separate, single legal entity for handling all issues on their behalf, in which event the legal entity is the keeper.
Register of Vehicle Keeper Markings and procedure for allocation
The register of VKM is public and updated on a real time basis. An application for a VKM is filed with the applicant's competent national authority and forwarded to the central body. A VKM can be used only after publication by the central body. The holder of a VKM must inform the competent national authority when he ends the use of a VKM, and the competent national authority will forward the information to the central body. A VKM will then be revoked once the keeper has proved that the marking has been changed on all vehicles concerned. It will not be reissued for 10 years, unless it is reissued to the original holder or at his request to another holder. A VKM can be transferred to another holder, which is the legal successor to the original holder. A VKM stays valid when the holder changes his name to a name that does not bear resemblance to the VKM. The first list of VKM will be drafted using existing railway company abbreviations. The VKM will be applied to all new build wagons after entry into force of the relevant TSIs. Existing wagons will have to be brought in compliance with the VKM marking by 31 December 2013. In case of inconsistency between the VKM marked on the vehicle and the data registered in the NVR, the NVR registration supersedes.
PART 2
INSCRIPTION OF THE NUMBER AND LINKED ALPHABETICAL MARKING ON THE BODYWORK
General arrangements for external markings
The capital letters and figures making up the marking inscriptions shall be at least 80 mm in height, in a sans serif font type of correspondence quality. A smaller height may only be used where there is no option but to place the marking on the sole bars. The marking is put not higher than 2 metres above rail level.
Wagons
The marking shall be inscribed on the wagon bodywork in the following manner: 23 TEN 80 D-RFC 7369 553-4 Zcs 31 TEN 80 D-DB 0691 235-2 Tanoos 33 TEN 84 NL-ACTS 4796 100-8 Slpss 43 87 F 4273 361-3 Laeks (In this case without VKM, full name and address information is inscribed on the vehicle) For wagons whose bodywork does not offer a large enough area for this type of arrangement, particularly in the case of flat wagons, the marking shall be arranged as follows: 0187 3320 644-7 TEN F-SNCF Ks When one or more index letters of national significance are inscribed on a wagon, this national marking must be shown after the international letter marking and separated from it by a hyphen.
Coaches and hauled passenger stock
The number shall be applied to each sidewall of the vehicle in the following manner: F-SNCF 61 87 20 – 72 021 – 7 B10 tu The marking of the country in which the vehicle is registered and of the technical characteristics are printed directly in front of, behind or under the twelve digits of the vehicle number. In case of coaches with driver’s cabin, the number is also written inside the cabin.
Locomotives, power cars and special vehicles
The standard 12-digit number must be marked on each sidewall of the tractive stock used in international service in the following manner: 91 88 0001323-0 The standard 12-digit number is also written inside each cabin of the tractive rolling stock. The keeper can add, in letters of larger bigger size than the standard number, an own number marking (consisting generally of digits of the serial number supplemented by alphabetical coding) useful in operations. The place where the own number is marked is left to the choice of the keeper. Examples SP 42037 ES 64 F4-099 88-1323 473011 92 51 0042037-9 94 80 0189 999-6 91 88 0001323-0 92 87 473011-0 94 79 2 642 185-5 These rules may be altered in bilateral agreements for vehicles existing when the TSI comes into force and assigned to a specific service and where if there is no risk of confusion between different stocks operating on the rail networks concerned. The exemption is valid for a period decided upon by the competent national authorities. The national authority can prescribe that the alphabetic country code and the VKM be recorded additional to the 12 digit vehicle number.
PART 3
RULES FOR THE DETERMINATION OF THE CHECK-DIGIT (DIGIT 12) The check-digit is determined in the following manner:
the digits in the even positions of the basic number (counting from the right) are taken at their own decimal value;
the digits in the odd positions of the basic number (counting from the right) are multiplied by 2;
the sum formed by the digits in even position and by all the digits which constitute the partial products obtained from the odd positions is then established;
the units digit of this sum is retained;
the complement required to bring the units digit to 10 forms the check-digit; should this units digit be nought, then the check-digit will also be nought.
Examples 1 2 —
Let the basic number be 3 3 8 4 4 7 9 6 1 0 0 Multiplication factor 2 1 2 1 2 1 2 1 2 1 2 6 3 16 4 8 7 18 6 2 0 0 Sum: 6 + 3 + 1 + 6 + 4 + 8 + 7 + 1 + 8 + 6 + 2 + 0 + 0 = 52 The units digit of this sum is 2. The check-digit number will therefore be 8 and the basic number thus becomes the registration number 33 84 4796 100-8. Let the basic number be 3 1 5 1 3 3 2 0 1 9 8 Multiplication factor 2 1 2 1 2 1 2 1 2 1 2 6 1 10 1 6 3 4 0 2 9 16 Sum: 6 + 1 + 1 + 0 + 1 + 6 + 3 + 4 + 0 + 2 + 9 + 1 + 6 = 40 The units digit of this sum is 0. The check-digit number will therefore be 0 and the basic number thus becomes the registration number 31 51 3320 198-0.
PART 4 Information relating to third countries is given for information purposes only
CODING OF THE COUNTRIES IN WHICH THE VEHICLES ARE REGISTERED (DIGITS 3-4 AND ABBREVIATION) Countries Alphabetical country code Numerical country code Companies concerned by the square brackets in part 6 and part 7 Albania AL 41 HSh Algeria DZ 92 SNTF Armenia AM 58 ARM Austria A 81 ÖBB Azerbaijan AZ 57 AZ Belarus BY 21 BC Belgium B 88 SNCB/NMBS Bosnia-Herzegovina BIH 44 ŽRS 50 ŽFBH Bulgaria BG 52 BDZ, SRIC China RC 33 KZD Croatia HR 78 HŽ Cuba CU 40 FC Cyprus CY Czech Republic CZ 54 ČD Denmark DK 86 DSB, BS Egypt ET 90 ENR Estonia EST 26 EVR Finland FIN 10 VR, RHK France F 87 SNCF, RFF Georgia GE 28 GR Germany D 80 DB, AAE Greece GR 73 CH Hungary H 55 MÁV, GySEV/ROeEE Iran IR 96 RAI Iraq IRQ 99 IRR Ireland IRL 60 CIE Israel IL 95 IR Italy I 83 FS, FNME Japan J 42 EJRC Kazakhstan KZ 27 KZH Kyrgyzstan KS 59 KRG Latvia LV 25 LDZ Lebanon RL 98 CEL Liechtenstein LIE Lithuania LT 24 LG Luxembourg L 82 CFL Macedonia (Former Yugoslav Republic of) MK 65 CFARYM (MŽ) Malta M Moldova MD 23 CFM Monaco MC Mongolia MGL 31 MTZ Morocco MA 93 ONCFM Netherlands NL 84 NS North Korea PRK 30 ZC Norway N 76 NSB, JBV Poland PL 51 PKP Portugal P 94 CP, REFER Romania RO 53 CFR Russia RUS 20 RZD Serbia-Montenegro SCG 72 JŽ Slovakia SK 56 ŽSSK, ŽSR Slovenia SLO 79 SŽ South Korea ROK 61 KNR Spain E 71 RENFE Sweden S 74 GC, BV Switzerland CH 85 SBB/CFF/FFS, BLS Syria SYR 97 CFS Tajikistan TJ 66 TZD Tunisia TN 91 SNCFT Turkey TR 75 TCDD Turkmenistan TM 67 TRK Ukraine UA 22 UZ United Kingdom GB 70 BR Uzbekistan UZ 29 UTI Vietnam VN 32 DSVN
PART 5 Notes: (a)(b)
ALPHABETICAL MARKING OF THE INTEROPERABILITY CAPABILITY TEN Vehicle which: PPV/PPW Vehicle which complies with PPV/PPW or PGW agreement (inside OSJD States) (original: PPV/PPW: ППВ (Правила пользования вагонами в международном сообщении); PGW: Правила Пользования Грузовыми Вагонами) Vehicles marked TEN correspond to coding 0 to 3 of the first digit in the vehicle number specified in part 6 Vehicles which are not authorised for operation in all Member States need a marking indicating the Member States where they have been authorised. The list of authorising MS should be marked according to one of the following drawings, where D stands for the MS who has granted the first authorisation (in the given example, Germany) and F stands for the second authorising MS (in the given example, France). The MS are codified in accordance with part 4. This may cover vehicles which are TSI compliant or which are not. These vehicles correspond to coding 4 or 8 of the first digit in the vehicle number specified in part 6.
(a) complies with all relevant TSIs which are in force at the moment of placing in service and has been authorised to be placed in service according to Article 22(1) of Directive 2008/57/EC and
(b) is provided with an authorisation valid in all Member States in accordance with Article 23(1) of Directive 2008/57/EC.
PART 6
INTEROPERABILITY CODES USED FOR WAGONS (DIGITS 1-2) 2nd digit 1st digit 0 1 2 3 4 5 6 7 8 9 2nd digit 1st digit Gauge fixed or variable fixed variable fixed variable fixed variable fixed variable fixed or variable Gauge TSI and/or COTIF and/or PPW 0 with axles Spare TSI and/or COTIF wagons [of which keeper is a railway undertaking listed in part 4] Not to be used pending further decision PPW wagons (variable gauge) with axles 0 1 with bogies Wagons used by industry with bogies 1 2 with axles Spare TSI and/or COTIF wagons [of which keeper is a railway undertaking listed in part 4] PPW wagons TSI and/or COTIF wagons PPW wagons Others TSI and/or/or COTIF wagons PPW wagons PPW wagons (fixed gauge) with axles 2 3 with bogies with bogies 3 Non TSI and non COTIF and non PPW 4 with axles Service wagons Others wagons [of which keeper is a railway undertaking listed in part 4] Others wagons Others wagons Wagons with special numbering for technical characteristics with axles 4 8 with bogies with bogies 8 Traffic Domestic traffic or international traffic by special agreement International traffic by special agreement Domestic traffic International traffic by special agreement Domestic traffic International traffic by special agreement Domestic traffic International traffic by special agreement Domestic traffic Domestic traffic or international traffic by special agreement Traffic 1st digit 2nd digit 0 1 2 3 4 5 6 7 8 9 1st digit 2nd digit
PART 7
INTERNATIONAL TRAFFIC ABILITY CODES USED FOR HAULED PASSENGER VEHICLES (DIGITS 1-2) Warning: The conditions between square brackets are transitional and will be deleted with the evolutions of RIC (see general remarks, point 3). Domestic traffic TSI and/or RIC/COTIF and/or PPW Domestic traffic or international traffic by special agreement TSI and/or RIC/COTIF PPW 2nd digit 1st digit 0 1 2 3 4 5 6 7 8 9 5 Vehicles for domestic traffic [of which keeper is a RIC railways undertaking listed in part 4] Fixed-gauge non air-conditioned vehicles (including car-carrying wagons) [of which keeper is a RIC railways undertaking listed in part 4] Gauge-adjustable (1435/1520) non air-conditioned vehicles [of which keeper is a RIC railways undertaking listed in part 4] Reserved Gauge-adjustable (1435/1672) non air-conditioned vehicles [of which keeper is a RIC railways undertaking listed in part 4] Vehicles with special numbering for technical characteristics Fixed-gauge vehicles Fixed-gauge vehicles Gauge-adjustable (1435/1520) vehicles with change of bogies Gauge-adjustable (1435/1520) vehicles with gauge-adjustable axles 6 Service vehicles not run in revenue-earning service Fixed-gauge air-conditioned vehicles [of which keeper is a RIC railways undertaking listed in part 4] Gauge-adjustable (1435/1520) air-conditioned vehicles [of which keeper is a RIC railways undertaking listed in part 4] Service vehicles not run in revenue-earning service [of which keeper is a RIC railways undertaking listed in part 4] Gauge-adjustable (1435/1672) air-conditioned vehicles [of which keeper is a RIC railways undertaking listed in part 4] Car-carrying wagons Gauge-adjustable vehicles 7 Air-conditioned and pressure-tight vehicles [of which keeper is a RIC railways undertaking listed in part 4] Reserved Reserved Pressure-tight fixed-gauge air-conditioned vehicles [of which keeper is a RIVC railways undertaking listed part 4] Reserved Other vehicles Reserved Reserved Reserved Reserved
PART 8
TYPES OF TRACTIVE STOCK (DIGITS 1-2) The first digit is 9. The second digit is defined by each Member State. It can for example fit with the self-checking digit if this digit is also calculated with the serial number. If the second digit describes the type of tractive stock, following coding is mandatory: Code General vehicle type 0 Miscellaneous 1 Electric locomotive 2 Diesel locomotive 3 Electric multiple-unit set (high speed) [power car or trailer] 4 Electric multiple-unit set (except high speed) [power car or trailer] 5 Diesel multiple-unit set [power car or trailer] 6 Specialised trailer 7 Electric shunting engine 8 Diesel shunting engine 9 Special vehicle
PART 9
STANDARD NUMERICAL MARKING OF WAGONS (DIGITS 5 TO 8) This part indicates in tables the numerical marking in 4 figures associated to the main technical characteristics of the wagon. This part is distributed on a separate medium (electronic file).
PART 10 CODES FOR THE TECHNICAL CHARACTERISTICS OF HAULED PASSENGER STOCK (DIGITS 5-6)
Note: Fractions of a compartment are not considered. The equivalent accommodation in open saloon cars with centre aisle is obtained by dividing the number of available seats by 6, 8 or 10 depending on the construction of the vehicle. 6th digit 5th digit 0 1 2 3 4 Reserved 0 Reserved Reserved Reserved Reserved Reserved Vehicles with 1st class seats 1 10 side-corridor compartments or equivalent open-saloon space with centre aisle ≥ 11 side-corridor compartments or equivalent open-saloon space with centre aisle Reserved Reserved Two or three axles Vehicles with 2nd class seats 2 10 side-corridor compartments or equivalent open-saloon space with centre aisle 11 side-corridor compartments or equivalent open-saloon space with centre aisle ≥ 12 side-corridor compartments or equivalent open-saloon space with centre aisle Three axles Two axles Vehicles with 1st or 1st/2nd class seats 3 10 side-corridor compartments or equivalent open-saloon space with centre aisle 11 side-corridor compartments or equivalent open-saloon space with centre aisle ≥ 12 side-corridor compartments or equivalent open-saloon space with centre aisle Reserved Two or three axles 1st or 1st/2nd class couchette cars 4 10 1st/2nd class compartments Reserved Reserved Reserved ≤ 9 1st/2nd class compartments 2nd class couchette cars 5 10 compartments 11 compartments ≥ 12 compartments Reserved Reserved Reserved 6 Reserved Reserved Reserved Reserved Reserved Sleeping cars 7 10 compartments 11 compartments 12 compartments Reserved Reserved Vehicles of special design and vans 8 Driving trailer with seats, all classes, with or without luggage compartment, with driving cab for reversible working Vehicles with 1st or 1st/2nd class seats with luggage or mail compartment Vehicles with 2nd class seats with luggage or mail compartment Reserved Vehicles with seats, all classes with specially-fitted areas, e.g. children’s play area 9 Mail vans Luggage vans with mail compartment Luggage vans Luggage vans and two or three-axle 2nd class vehicles with seats, with luggage or mail compartment Side-corridor luggage vans, with or without compartment under customs seal
Note: Fractions of a compartment are not considered. The equivalent accommodation in open saloon cars with centre aisle is obtained by dividing the number of available seats by 6, 8 or 10 depending on the construction of the vehicle. 6th digit 5th digit 5 6 7 8 9 Reserved 0 Reserved Reserved Reserved Reserved Reserved Vehicles with 1st class seats 1 Reserved Double-deck coaches ≥ 7 side-corridor compartments or equivalent open-saloon space with centre aisle 8 side-corridor compartments or equivalent open-saloon space with centre aisle 9 side-corridor compartments or equivalent open-saloon space with centre aisle Vehicles with 2nd class seats 2 Only for OSJD, double-deck coaches Double-deck coaches Reserved ≥ 8 side-corridor compartments or equivalent open-saloon space with centre aisle 9 side-corridor compartments or equivalent open-saloon space with centre aisle Vehicles with 1st or 1st/2nd class seats 3 Reserved Double-deck coaches Reserved ≥ 8 side-corridor compartments or equivalent open-saloon space with centre aisle 9 side-corridor compartments or equivalent open-saloon space with centre aisle 1st or 1st/2nd class couchette cars 4 Reserved Reserved Reserved Reserved ≤ 9 1st class compartments 2nd class couchette cars 5 Reserved Reserved Reserved Reserved ≤ 9 compartments Reserved 6 Reserved Reserved Reserved Reserved Reserved Sleeping cars 7 > 12 compartments Reserved Reserved Reserved Reserved Vehicles of special design and vans 8 Coaches with seats and couchette cars, all classes, with bar or buffet area Double-deck driving coach with seats, all classes, with or without luggage compartment, with driving cab for reversible working Dining cars or coaches with bar or buffet area, with luggage compartment Dining cars Other special coaches (conference, disco, bar, cinema, video, ambulance coaches) 9 Two or three-axle luggage vans with mail compartment Reserved Two or three-axle car-carrying wagons Car-carrying wagons Service vehicles
CODES FOR THE GENERAL CHARACTERISTICS OF HAULED PASSENGER STOCK (DIGITS 7-8) Notes:
All tensions Single phase alternating current 1000 V 51 to 15 Hz, single phase alternating current 1500 V 50 Hz, direct current 1500 V, direct current 3000 V. Can include single phase alternating current 3000 V 50 Hz. A Autonomous heating, without train bus electricity supply line. G Vehicles with train bus electricity supply line for all voltages, but requiring a generator van to supply air-conditioning. Steam Steam heating only. If tensions are written, the code is also available for vehicles without steam heating. Energy supply Maximum speed 8th digit 7th digit 0 1 2 3 4 5 6 7 8 9 < 120 km/h 0 All tensions Reserved 3000 V~ + 3000 V = 1000 V~ Reserved 1500 V~ Other tensions than 1000 V, 1500 V, 3000 V 1500 V~ + 1500 V = 3000 V = Reserved 1 All tensions + Steam 1000 V~ + Steam 1000 V~ + Steam 1000 V~ + Steam 1000 V~ + Steam 1000 V~ + Steam Reserved 1500 V~ + 1500 V = + Steam 3000 V = + Steam 3000 V = + Steam 2 Steam Steam 3000 V~ + 3000 V = + Steam Steam 3000 V~ + 3000 V = + Steam Steam 3000 V~ + 3000 V =1500 V~ + Steam 1500 V~ + Steam 1500 V~ + Steam A 121 to 140 km/h 3 All tensions Reserved 1000 V~ + 3000 V = 1000 V~ 1000 V~ 1000 V~ 1000 V~ + 1500 V~ + 1500 V = 1500 V~ + 1500 V = 3000 V = 3000 V = 4 All tensions + Steam All tensions + Steam All tensions + Steam 1000 V~ + Steam 1500 V~ + 1500 V = 1000 V~ + Steam 3000 V~ + 3000 V = 1500 V~ + 1500 V = + Steam 3000 V = + Steam Reserved 5 All tensions + Steam All tensions + Steam All tensions + Steam 1000 V~ + Steam Reserved 1500 V~ + Steam Other tensions than 1000 V, 1500 V, 3000 V 1500 V~ + 1500 V = + Steam Reserved Reserved 6 Steam Reserved 3000 V~ + 3000 V = Reserved 3000 V~ + 3000 V = Reserved Steam Reserved Reserved A 141 to 160 km/h 7 All tensions All tensions 1500 V~ + 3000 V = All tensions 1000 V~ 1500 V~ + 1500 V = 1000 V~ 1500 V~ 1500 V~ + 1500 V = 3000 V = 3000 V = 8 All tensions + Steam All tensions + Steam 3000 V~ + 3000 V = Reserved All tensions + Steam 1000 V~ + Steam 3000 V~+ 3000 V = Other tensions than 1000 V, 1500 V, 3000 V All tensions + Steam A G > 160 km/h 9 All tensions All tensions All tensions + Steam 1000 V~ + 1500 V~ 1000 V~ 1000 V~ Reserved 1500 V~ + 1500 V = 3000 V = A G
PART 11 CODES FOR THE TECHNICAL CHARACTERISTICS OF SPECIAL VEHICLES (DIGIT 6 TO 8) Authorised speed for special vehicles (digit 6)
Classification Self-propelled travelling speed ≥ 100 km/h < 100 km/h 0 km/h Can be put into a train V ≥ 100 km/h Self-propelled 1 2 Non self-propelled 3 V < 100 km/h and/or restrictions Self-propelled 4 Non self-propelled 5 Cannot be put into a train Self-propelled 6 Non self-propelled 7 Self-propelled rail/road vehicle than can be put into a train 8 Self-propelled rail/road vehicle than cannot be put into a train 9 Non self-propelled rail/road vehicle 0
TYPE AND SUB-TYPE OF SPECIAL VEHICLE (DIGITS 7-8)
7th digit 8th digit Vehicles/machines 1 Infrastructure and superstructure 1 Track laying and renewal train 2 Switches and crossing laying equipment 3 Track rehabilitation train 4 Ballast cleaning machine 5 Earthworks machine 6 7 8 9 Rail-mounted crane (excl. re-railing) 0 Other or general 2 Track 1 High capacity plain track tamping machine 2 Other plain track tamping machines 3 Tamping machine with stabilisation 4 Tamping machine for switches and crossings 5 Ballast plough 6 Stabilisation machine 7 Grinding and welding machine 8 Multi-purpose machine 9 Track inspection car 0 Other 3 Overhead line 1 Multi-purpose machine 2 Rolling and unrolling machine 3 Mast installation machine 4 Drum carrier machine 5 Overhead line tensioning machine 6 Machine with elevating work platform and machine with scaffold 7 Cleaning train 8 Greasing train 9 Overhead line inspection car 0 Other 4 Structures 1 Deck laying machine 2 Bridge inspection platform 3 Tunnel inspection platform 4 Gas purification machine 5 Ventilation machine 6 Machine with elevating work platform or with scaffold 7 Tunnel lighting machine 8 9 0 Other 5 Loading, unloading and various transport 1 Rail loading/unloading and transport machine 2 Loading/unloading and transport machine for ballast, gravel, etc. 3 4 5 Sleeper loading/unloading and transport machine 6 7 8 Loading/unloading and transport machine for switchgear, etc. 9 Loading/unloading and transport machine for other materials 0 Other 6 Measuring 1 Earthworks recording car 2 Track recording car 3 Overhead line recording car 4 Gauge recording car 5 Signalling recording car 6 Telecommunications recording car 7 8 9 0 Other 7 Emergency 1 Emergency crane 2 Emergency haulage car 3 Emergency tunnel train 4 Emergency car 5 Fire car 6 Sanitary vehicle 7 Equipment car 8 9 0 Other 8 Traction, transport, energy, etc. 1 Tractive units 2 3 Transport car (excl. 59) 4 Power car 5 Track car / powered car 6 7 Concreting train 8 9 0 Other 9 Environment 1 Self-propelled snow plough 2 Hauled snow plough 3 Snow broom 4 De-icing machine 5 Weed-killing machine 6 Rail cleaning machine 7 8 9 0 Other 0 Rail/road 1 Category 1 rail/road machine 2 3 Category 2 rail/road machine 4 5 Category 3 rail/road machine 6 7 Category 4 rail/road machine 8 9 0 Other
PART 12
LETTER MARKING FOR WAGONS EXCLUDING ARTICULATED AND MULTIPLE WAGONS
DEFINITION OF THE CATEGORY AND INDEX LETTERS
1. Important notes In the attached tables:
the information given in meters refers to the inside length of the wagons (lu);
the information given in tonnes (tu) corresponds to the highest load limit shown in the loading table for the wagon in question, this limit being determined in accordance with the procedures laid down.
2. Index letters with an international value common to all categories q pipe for electric heating which can be supplied by all accepted currents qq pipe and installation for electric heating which can be supplied by all accepted currents s wagons authorised to run under s conditions (see Annex B of Rolling Stock TSI) ss wagons authorised to run under ss conditions (see Annex B of Rolling Stock TSI)
3. Index letters with a national value t, u, v, w, x, y, z The value of these letters is defined by each Member State.
CATEGORY LETTER: E — OPEN HIGH-SIDED WAGON
Reference wagon of ordinary type, with side and end tipping, with flat floor with 2 axles: lu ≥ 7,70 m; 25 t ≤ tu ≤ 30 t with 4 axles: lu ≥ 12 m; 50 t ≤ tu ≤ 60 t with 6 axles or more: lu ≥ 12 m; 60 t ≤ tu ≤ 75 t Index letters a with 4 axles aa with 6 axles or more c with floor traps k with 2 axles: tu < 20 t with 4 axles: tu < 40 t with 6 axles or more: tu < 50 t kk with 2 axles: 20 t ≤ tu < 25 t with 4 axles: 40 t ≤ tu < 50 t with 6 axles or more: 50 t ≤ tu < 60 t l without side tipping ll without floor traps m with 2 axles: lu < 7,70 m with 4 axles or more: lu < 12 m mm with 4 axles or more: lu >12 m n with 2 axles: tu > 30 t with 4 axles: tu > 60 t with 6 axles or more: tu > 75 t o without end tipping p with station for brakeman
CATEGORY LETTER: F — OPEN HIGH-SIDED WAGON
The method of unloading these wagons is defined by a combination of the following characteristics: Reference wagon Of special type with 2 axles: 25 t ≤ tu ≤ 30 t with 3 axles: 25 t ≤ tu ≤ 40 t with 4 axles: 50 t ≤ tu ≤ 60 t with 6 axles or more: 60 t ≤ tu ≤ 75 t Index letters a with 4 axles aa with 6 axles or more b high capacity with axles (volume > 45 m3) c with controlled gravity unloading, on both sides, alternately, at the top cc with controlled gravity unloading, on both sides, alternately, at the bottom f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) k with 2 or 3 axles: tu < 20 t with 4 axles: tu < 40 t with 6 axles or more: tu < 50 t kk with 2 or 3 axles: 20 t ≤ tu < 25 t with 4 axles: 40 t ≤ tu < 50t with 6 axles or more: 50 t ≤ tu < 60 t l with bulk gravity unloading, on both sides, simultaneously, at the top ll with bulk gravity unloading, on both sides, simultaneously, at the bottom n with 2 axles: tu > 30 t with 3 axles or more: tu > 40 t with 4 axles: tu > 60 t with 6 axles or more: tu > 75 t o with axial bulk gravity unloading, at the top oo with axial bulk gravity unloading, at the bottom p with axial controlled gravity unloading, at the top pp with axial controlled gravity unloading, at the bottom ppp with station for brakeman
Arrangement of the unloading apertures: — axial Apertures situated above the centre of the track — bilateral Apertures on either side of the track, outside the rails (For these wagons, unloading is: — top The lower edge of the discharge through (without taking into account mobile devices which may extend this through) is situated at least 0,700 m above the rail, and allows for the use of a conveyor belt to take away the goods — bottom The position of the lower edge of the discharge through does not allow for the use of a conveyor belt to take away the goods
simultaneous, if complete emptying of the wagon requires the apertures to be open on both sides,
alternate, if complete emptying of the wagon can take place by opening the apertures on one side only)
Rate of unloading: — bulk Once the apertures are open for unloading, they cannot be closed again until the wagon is empty — controlled At any time during unloading, the flow of the goods can be regulated or even stopped
CATEGORY LETTER: G — COVERED WAGON
Reference wagon Of ordinary type with at least 8 ventilation apertures with 2 axles: 9 m ≤ lu < 12 m; 25 t ≤ tu ≤ 30 t with 4 axles: 15 m ≤ lu < 18 m; 50 t ≤ tu ≤ 60 t with 6 axles or more: 15 m ≤ lu < 18 m; 60 t ≤ tu ≤ 75 t Index letters a with 4 axles aa with 6 axles or more b high capacity: bb with 4 axles: lu > 18 m g for grain h for fruits and vegetables k with 2 axles: tu < 20 t with 4 axles: tu < 40t with 6 axles or more: tu < 50 t kk with 2 axles: 20 t ≤ tu < 25 t with 4 axles: 40 t ≤ tu < 50 t with 6 axles or more: 50 t ≤ tu < 60 t l with less than 8 ventilation apertures ll with enlarged doors apertures m with 2 axles: lu < 9 m with 4 axles or more: lu < 15 m n with 2 axles: tu > 30 t with 4 axles: tu > 60 t with 6 axles or more: tu > 75 t o with 2 axles: lu < 12 m and payload capacity ≥ 70 m3 p with station for brakeman
with 2 axles: lu ≥ 12 m and payload capacity ≥ 70 m3
with 4 axles or more: lu ≥ 18 m
CATEGORY LETTER: H — COVERED WAGON
Reference wagon of special type with 2 axles: 9 m ≤ lu ≤ 12 m; 25 t ≤ tu ≤ 28 t with 4 axles: 15 m ≤ lu < 18 m; 50 t ≤ tu ≤ 60 t with 6 axles or more: 15 m ≤ lu < 18 m; 60 t ≤ tu ≤ 75 t Index letters a with 4 axles aa with 6 axles or more b with 2 axles: 12 m ≤ lu ≤ 14 m and payload capacity ≥ 70 m3 with 4 axles or more: 18 m ≤ lu < 22 m bb with 2 axles: lu ≥ 14m with 4 axles or more: lu ≥ 22 m c with end doors cc with end doors and fitted internally for the transport of motor cars d with floor traps dd with tipping body e with 2 floors ee with 3 floors or more f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) g for grain gg for cement h for fruits and vegetables hh for mineral fertilizer i with opening or shunt walls ii with very robust opening or shunt walls k with 2 axles: tu < 20 t with 4 axles: tu < 40 t with 6 axles or more: tu < 50 t kk with 2 axles: 20 t ≤ tu < 25 t with 4 axles: 40 t ≤ tu < 50 t with 6 axles or more: 50 t ≤ tu < 60 t l with movable partitions ll with lockable movable partitions m with 2 axles: lu < 9 m with 4 axles or more: lu < 15 m mm with 4 axles or more: lu > 18 m n with 2 axles: tu > 28 t with 4 axles: tu < 60 t with 6 axles or more: tu > 75 t o with 2 axles: lu 12 m < 14 m et volume utile ≥ 70 m3 p with station for brakeman
CATEGORY LETTER: I — TEMPERATURE-CONTROLLED WAGON
Note: The floor area of covered refrigerator wagons is always determined taking into account the use of ice bunkers. Reference wagon refrigerator wagon with class IN thermal insulation, with motor-driven ventilation, with gratings and ice bunker ≥ 3,5 m3 with 2 axles: 19 m2 ≤ floor area < 22 m2; 15 t ≤ tu ≤ 25 t with 4 axles: floor area ≥ 39 m2; 30 t ≤ tu ≤ 40 t Index letters a with 4 axles b with 2 axles and large floor area: 22 m2 ≤ floor area ≤ 27 m2 bb with 2 axles and very large floor area: floor area > 27 m2 c with meat hooks d for fish e with electric ventilation f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) g with mechanical refrigeration gg refrigerator with liquefied gas h with class IR thermal insulation i mechanically refrigerated by the machinery of an accompanying technical wagon ii accompanying technical wagon k with 2 axles: tu > 15 t with 4 axles: tu < 30 t l insulated without ice bunkers m with 2 axles: floor area < 19 m2 with 4 axles: floor area < 39 m2 mm with 4 axles: floor area ≥ 39 m2 n with 2 axles: tu > 25 t with 4 axles; tu > 40 t o with ice bunkers of capacity less than 3,5 m3 p without gratings
CATEGORY LETTER: K — 2-AXLE FLAT WAGON
Reference wagon Of ordinary type with drop sides and short stanchions lu ≥ 12 m; 25 t ≤ tu ≤ 30 t Index letters b with long stanchions g fitted for the transport of containers i with removable cover and non-removable ends j with shock-absorbing device k tu < 20 t kk 20 t ≤ tu < 25 t l without stanchions m 9 m ≤ lu < 12 m mm lu < 9 m n tu > 30 t o with non-removable sides p without sides pp with removable sides
CATEGORY LETTER: L — 2-AXLE FLAT WAGON
Reference wagon of special type lu ≥ 12 m; 25 t ≤ tu ≤ 30 t Index letters b with special fittings for securing purposes for medium-sized containers (pa) c with swivelling bolster d fitted out for the transport of motor cars, without deck e with decks for the transport of motor cars f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) g fitted for the transport of containers (except pa) h fitted out for the transport of steel coils, eye to side hh fitted out for the transport of steel coils, eye to sky i with removable cover and non-removable ends ii with very robust removable metallic cover and non-removable ends j with shock-absorbing device k tu < 20 t kk 20 t ≤ tu < 25 t l without stanchions m 9 m ≤ lu < 12 m mm lu < 9 m n tu > 30 t p without sides
CATEGORY LETTER: O — MIXED FLAT AND OPEN HIGH-SIDED WAGON
Reference wagon of ordinary type with 2 or 3 axles, with drop sides or ends and stanchions with 2 axles: lu ≥ 12 m; 25 t ≤ tu ≤ 30 t with 3 axles: lu ≥ 12 m; 25 t ≤ tu ≤ 40 t Index letters a with 3 axles f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) k tu < 20 t kk 20 t ≤ tu < 25 t l without stanchions m 9 m ≤ lu < 12 m mm lu < 9 m n with 2 axles: tu > 30 t with 3 axles: tu > 40 t
CATEGORY LETTER: R — FLAT BOGIES WAGON
Reference wagon of ordinary type with drop ends and stanchions 18 m ≤ lu < 22 m; 50 t ≤ tu ≤ 60 t Index letters b lu ≥ 22 m e with drop sides g fitted for the transport of containers h fitted out for the transport of steel coils, eye to side hh fitted out for the transport of steel coils, eye to sky i with removable cover and non-removable ends j with shock-absorbing device k tu < 40 t kk 40 t ≤ tu < 50 t l without stanchions m 15 m ≤ lu < 18 m mm lu < 15 m n tu > 60 t o with non-removable ends less than 2 m in height oo with non-removable ends, 2 m or more in height p without drop ends pp with removable sides
CATEGORY LETTER: S — FLAT BOGIES WAGON
Reference wagon of special type with 4 axles: lu ≥ 18 m; 50 t ≤ tu ≤ 60 t with 6 axles or more: lu ≥ 22 m; 60 t ≤ tu ≤ 75 t Index letters a with 6 axles (2 bogies of 3 axles) aa with 8 axles or more aaa with 4 axles (2 bogies of 2 axles) b with special fittings for securing purposes for medium-sized containers (pa) c with swivelling bolster d fitted out for the transport of motor cars, without deck e with decks for the transport of motor cars f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) g fitted for the transport of containers, total loading length ≤ 60’ (except pa) gg fitted for the transport of containers, total loading length > 60’ (except pa) h fitted out for the transport of steel coils, eye to side hh fitted out for the transport of steel coils, eye to sky i with removable cover and non-removable ends ii with very robust removable metallic cover and non-removable ends j with shock-absorbing device k with 4 axles: tu < 40 t with 6 axles or more: tu < 50 t kk with 4 axles: 40 t ≤ tu < 50 t with 6 axles or more: 50 t ≤ tu < 60 t l without stanchions m with 4 axles: 15 m ≤ lu < 18 m; with 6 axles or more: 18 m ≤ lu < 22 m mm with 4 axles: lu < 15 m with 6 axles or more: lu < 18 m mmm with 4 axles : lu ≥ 22 m n with 4 axles: tu > 60 t with 6 axles or more: tu > 75 t p without sides
CATEGORY LETTER: T — WAGON WITH OPENING ROOF
The method of unloading these wagons is defined by a combination of the following characteristics: Reference wagon with 2 axles: 9 m ≤ lu < 12 m; 25 t ≤ tu ≤ 30 t with 4 axles: 15 m ≤ lu < 18 m; 50 t ≤ tu ≤ 60 t with 6 axles or more: 15 m ≤ lu < 18 m; 60 t ≤ tu ≤ 75 t Index letters a with 4 axles aa with 6 axles or more b high capacity: with 2 axles: lu ≥ 12 m with 4 axles or more: lu ≥ 18 m c with end doors d with controlled gravity unloading, on both sides, alternately, at the top dd with controlled gravity unloading, on both sides, alternately, at the bottom e with unobstructed height of the doors > 1,90 m f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) g for grain h fitted out for the transport of steel coils, eye to side hh fitted out for the transport of steel coils, eye to sky i with opening walls j with shock-absorbing device k with 2 axles: tu < 20 t with 4 axles: tu < 40 t with 6 axles or more: tu < 50 t kk with 2 axles: 20 t ≤ tu < 25 t with 4 axles: 40 t ≤ tu < 50 t with 6 axles or more: 50 t ≤ tu < 60 t l with bulk gravity unloading, on both sides, simultaneously, at the top ll with bulk gravity unloading, on both sides, simultaneously, at the bottom m with 2 axles: lu < 9 m with 4 axles or more: lu < 15 m n with 2 axles: tu > 30 t with 4 axles: tu > 60 t with 6 axles or more: tu > 75 t o with axial bulk gravity unloading, at the top oo with axial bulk gravity unloading, at the bottom p with axial controlled gravity unloading, at the top pp with axial controlled gravity unloading, at the bottom
Arrangement of the unloading apertures: — axial Apertures situated above the centre of the track — bilateral Apertures on either side of the track, outside the rails (For these wagons, unloading is: — top The lower edge of the discharge through (without taking into account mobile devices which may extend this through) is situated at least 0,700 m above the rail, and allows for the use of a conveyor belt to take away the goods — bottom The position of the lower edge of the discharge through does not allow for the use of a conveyor belt to take away the goods
simultaneous, if complete emptying of the wagon requires the apertures to be open on both sides,
alternate, if complete emptying of the wagon can take place by opening the apertures on one side only)
Rate of unloading: — bulk Once the apertures are open for unloading, they cannot be closed again until the wagon is empty — controlled At any time during unloading, the flow of the goods can be regulated or even stopped
CATEGORY LETTER: U — SPECIAL WAGONS
The method of unloading these wagons is defined by a combination of the following characteristics: Reference wagon other than those in categories F, H, L, S ou Z with 2 axles: 25 t ≤ tu ≤ 30 t with 3 axles: 25 t ≤ tu ≤ 40 t with 4 axles: 50 t ≤ tu ≤ 60t with 6 axles or more: 60 t ≤ tu ≤ 75 t Index letters a with 4 axles aa with 6 axles or more c with unloading under pressure d with controlled gravity unloading, on both sides, alternately, at the top dd with controlled gravity unloading, on both sides, alternately, at the bottom f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) g for grain i fitted out for the transport objects which should exceed the gauge if they were loaded on ordinary wagons k with 2 or 3 axles: tu < 20 t with 4 axles: tu < 40 t with 6 axles or more: tu < 50 t kk with 2 or 3 axles: 20 t ≤ tu < 25 t with 4 axles: 40 t ≤ tu < 50 t with 6 axles or more: 50 t ≤ tu < 60 t l with bulk gravity unloading, on both sides, simultaneously, at the top ll with bulk gravity unloading, on both sides, simultaneously, at the bottom n with 2 axles: tu > 30 t with 3 axles: tu > 40 t with 4 axles: tu > 60 t with 6 axles or more: tu > 75 t o with axial bulk gravity unloading, at the top oo with axial bulk gravity unloading, at the bottom p with axial bulk gravity unloading, at the top pp with axial bulk gravity unloading, at the bottom
Arrangement of the unloading apertures: — axial Apertures situated above the centre of the track — bilateral Apertures on either side of the track, outside the rails (For these wagons, unloading is: — top The lower edge of the discharge through (without taking into account mobile devices which may extend this through) is situated at least 0,700 m above the rail, and allows for the use of a conveyor belt to take away the goods — bottom The position of the lower edge of the discharge through does not allow for the use of a conveyor belt to take away the goods
simultaneous, if complete emptying of the wagon requires the apertures to be open on both sides,
alternate, if complete emptying of the wagon can take place by opening the apertures on one side only)
Rate of unloading: — bulk Once the apertures are open for unloading, they cannot be closed again until the wagon is empty — controlled At any time during unloading, the flow of the goods can be regulated or even stopped
CATEGORY LETTER: Z — TANK WAGON
Reference wagon with metal shell, for the transport of liquids or gases with 2 axles: 25 t ≤ lu ≤ 30 t with 3 axles: 25 t ≤ tu ≤ 40 t with 4 axles: 50 t ≤ tu ≤ 60 t with 6 axles or more: 60 t ≤ tu ≤ 75 t Index letters a with 4 axles aa with 6 axles or more b for oil products c with unloading under pressure d for food and chemical products e fitted with heating devices f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) g for the transport of gases under pressure, liquefied or dissolved under pressure i tank of non-metallic material j with shock-absorbing device k with 2 or 3 axles: tu < 20 t with 4 axles: tu < 40 t with 6 axles or more: tu < 50 t kk with 2 or 3 axles: 20 t ≤ tu < 25 t with 4 axles: 40 t ≤ tu < 50 t with 6 axles or more: 50 t ≤ tu < 60 t n with 2 axles: tu > 30 t with 3 axles: tu > 40 t with 4 axles tu > 60 t with 6 axles or more: tu > 75 t p with station for brakeman
LETTER MARKING FOR WAGONS FOR ARTICULATED AND MULTIPLE WAGONS
DEFINITION OF THE CATEGORY AND INDEX LETTERS
1. Important notes In the attached tables, the information given in meters refers to the inside length of the wagons (lu).
2. Index letters with an international value common to all categories q pipe for electric heating which can be supplied by all accepted currents qq pipe and installation for electric heating which can be supplied by all accepted currents s wagons authorised to run under s conditions (see annex B of rolling stock STI) ss wagons authorised to run under ss conditions (see annex B of rolling stock STI)
3. Index letters with a national value t, u, v, w, x, y, z The value of these letters is defined by each Member State.
CATEGORY LETTER: F — OPEN HIGH-SIDED WAGON
The method of unloading these wagons is defined by a combination of the following characteristics: Reference wagon Articulated or multiple wagon with axles, with 2 units 22 m ≤ lu < 27 m Index letters a with bogies c with controlled gravity unloading, on both sides, alternately, at the top cc with controlled gravity unloading, on both sides, alternately, at the bottom E with 3 units ee with 4 units or more f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) l with bulk gravity unloading, on both sides, simultaneously, at the top ll with bulk gravity unloading, on both sides, simultaneously, at the bottom m with 2 units: lu ≥ 27 m mm with 2 units: lu < 22 m o with axial bulk gravity unloading, at the top oo with axial bulk gravity unloading, at the bottom p with axial controlled gravity unloading, at the top pp with axial controlled gravity unloading, at the bottom r articulated wagon rr multiple wagon
Arrangement of the unloading apertures: — axial Apertures situated above the centre of the track — bilateral Apertures on either side of the track, outside the rails (For these wagons, unloading is: — top The lower edge of the discharge through (without taking into account mobile devices which may extend this through) is situated at least 0,700 m above the rail, and allows for the use of a conveyor belt to take away the goods — bottom The position of the lower edge of the discharge through does not allow for the use of a conveyor belt to take away the goods
simultaneous, if complete emptying of the wagon requires the apertures to be open on both sides,
alternate, if complete emptying of the wagon can take place by opening the apertures on one side only)
Rate of unloading: — bulk Once the apertures are open for unloading, they cannot be closed again until the wagon is empty — controlled At any time during unloading, the flow of the goods can be regulated or even stopped
CATEGORY LETTER: H — COVERED WAGON
Reference wagon articulated or multiple wagon with axles, with 2 units 22 m ≤ lu < 27 m Index letters a with bogies c with end doors cc with end doors and fitted internally for the transport of motor cars d with floor traps e with 3 units ee with 4 units or more f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) g for grain h for fruits and vegetables i with opening or shunt walls ii with very robust opening or shunt walls l with movable partitions ll with lockable movable partitions m with 2 units: lu ≥ 27 m mm with 2 units: lu < 22 m r articulated wagon rr multiple wagon
CATEGORY LETTER: I — TEMPERATURE CONTROLLED WAGON
Reference wagon refrigerator wagon with class IN thermal insulation, with motor-driven ventilation, with gratings and ice bunker ≥ 3,5 m3 articulated or multiple wagon with axles, with 2 units 22 m ≤ lu < 27 m Index letters a with bogies c with meat hooks d for fish e with electric ventilation ee with 4 units or more f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) g with mechanical refrigeration gg refrigerator with liquefied gas h with class IR thermal insulation i mechanically refrigerated by the machinery of an accompanying technical wagon ii accompanying technical wagon l insulated without ice bunkers m with 2 units: lu ≥ 27 m mm with 2 units: lu < 22 m o with ice bunkers of capacity less than 3,5 m3 oo with 3 units p without gratings r articulated wagon rr multiple wagon
CATEGORY LETTER: L — FLAT WAGON WITH SEPARATE AXLES
Reference wagon articulated or multiple wagon with 2 units 22 m ≤ lu < 27 m Index letters a articulated wagon aa multiple wagon b with special fittings for securing purposes for medium-sized containers (pa) c with swivelling bolster d fitted out for the transport of motor cars, without deck e with decks for the transport of motor cars f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) g fitted for the transport of containers h fitted out for the transport of steel coils, eye to side hh fitted out for the transport of steel coils, eye to sky i with removable cover and non-removable ends ii with very robust removable metallic cover and non-removable ends j with shock-absorbing device l without stanchions m with 2 units: 18 m ≤ lu < 22 m mm with 2 units: lu < 18 m o with 3 units oo with 4 units or more p without sides r with 2 units: lu ≥ 27 m
CATEGORY LETTER: S — FLAT BOGIE WAGON
Reference wagon articulated or multiple wagon with 2 units 22 m ≤ lu < 27 m Index letters b with special fittings for securing purposes for medium-sized containers (pa) c with swivelling bolster d fitted out for the transport of motor cars, without deck e with decks for the transport of motor cars f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) g fitted for the transport of containers, total loading length ≤ 60’ (except pa) gg fitted for the transport of containers, total loading length > 60’ (except pa) h fitted out for the transport of steel coils, eye to side hh fitted out for the transport of steel coils, eye to sky i with removable cover and non-removable ends ii with very robust removable metallic cover and non-removable ends j with shock-absorbing device l without stanchions m with 2 units: lu ≥ 27 m mm with 2 units: lu < 22 m o with 3 units oo with 4 units or more p without sides r articulated wagon rr multiple wagon
CATEGORY LETTER: T — WAGON WITH OPENING ROOF
The method of unloading these wagons is defined by a combination of the following characteristics: Reference wagon articulated or multiple wagon with axles, with 2 units 22 m ≤ lu < 27 m Index letters a with bogies b with unobstructed height of doors > 1,90 m c with end doors d with controlled gravity unloading, on both sides, alternately, at the top dd with controlled gravity unloading, on both sides, alternately, at the bottom e with 3 units ee with 4 units or more f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) g for grain h fitted out for the transport of steel coils, eye to side hh fitted out for the transport of steel coils, eye to sky i with opening walls j with shock-absorbing device l with bulk gravity unloading, on both sides, simultaneously, at the top ll with bulk gravity unloading, on both sides, simultaneously, at the bottom m with 2 units: lu ≥ 27 m mm with 2 units: lu < 22 m o with axial bulk gravity unloading, at the top oo with axial bulk gravity unloading, at the bottom p with axial controlled gravity unloading, at the top pp with axial controlled gravity unloading, at the bottom r articulated wagon rr multiple wagon
Arrangement of the unloading apertures: — axial Apertures situated above the centre of the track — bilateral Apertures on either side of the track, outside the rails (For these wagons, unloading is: — top The lower edge of the discharge through (without taking into account mobile devices which may extend this through) is situated at least 0,700 m above the rail, and allows for the use of a conveyor belt to take away the goods — bottom The position of the lower edge of the discharge through does not allow for the use of a conveyor belt to take away the goods
simultaneous, if complete emptying of the wagon requires the apertures to be open on both sides,
alternate, if complete emptying of the wagon can take place by opening the apertures on one side only)
Rate of unloading: — bulk Once the apertures are open for unloading, they cannot be closed again until the wagon is empty — controlled At any time during unloading, the flow of the goods can be regulated or even stopped
CATEGORY LETTER: U — SPECIAL WAGONS
The method of unloading these wagons is defined by a combination of the following characteristics: Reference wagon articulated or multiple wagon, with axles, with 2 units 22 m ≤ lu < 27 m Index letters a with bogies e with 3 units ee with 4 units or more c with unloading under pressure d with controlled gravity unloading, on both sides, alternately, at the top dd with controlled gravity unloading, on both sides, alternately, at the bottom f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) g for grain i fitted out for the transport objects which should exceed the gauge if they were loaded on ordinary wagons l with bulk gravity unloading, on both sides, simultaneously, at the top ll with bulk gravity unloading, on both sides, simultaneously, at the bottom m with 2 units: lu ≥ 27 m mm with 2 units: lu < 22 m o with axial bulk gravity unloading, at the top oo with axial bulk gravity unloading, at the bottom p with axial controlled gravity unloading, at the top pp with axial controlled gravity unloading, at the bottom r articulated wagon rr multiple wagon
Arrangement of the unloading apertures: — axial Apertures situated above the centre of the track — bilateral Apertures on either side of the track, outside the rails. (For these wagons, unloading is: — top The lower edge of the discharge through (without taking into account mobile devices which may extend this through) is situated at least 0,700 m above the rail, and allows for the use of a conveyor belt to take away the goods — bottom The position of the lower edge of the discharge through does not allow for the use of a conveyor belt to take away the goods
simultaneous, if complete emptying of the wagon requires the apertures to be open on both sides,
alternate, if complete emptying of the wagon can take place by opening the apertures on one side only)
Rate of unloading: — bulk Once the apertures are open for unloading, they cannot be closed again until the wagon is empty — controlled At any time during unloading, the flow of the goods can be regulated or even stopped
CATEGORY LETTER: Z — TANK WAGON
Reference wagon with metal shell, for the transport of liquids or gases articulated or multiple wagon with axles, with 2 units 22 m ≤ lu < 27 m Index letters a with bogies c with unloading under pressure e fitted with heating devices f suitable for traffic with Great Britain ff suitable for traffic with Great Britain (by tunnel exclusively) fff suitable for traffic with Great Britain (by train-ferry exclusively) g for the transport of gases under pressure, liquefied or dissolved under pressure i tank of non-metallic material j with shock-absorbing device m with 2 units: lu ≥ 27 m mm with 2 units: lu < 22 m o with 3 units oo with 4 units or more r articulated wagon rr multiple wagon
PART 13
LETTER MARKING FOR HAULED PASSENGER STOCK
Serial letters with an international value:
A 1st class coach with seats B 2nd class coach with seats AB 1st/2nd class coach with seats WL Sleeping-car with serial letter A, B or AB depending on the type of accommodation offered. The serial letters for sleeping-car with special compartments are supplemented with index-letter S WR Dining-car R Coach with dining-car, buffet or bar compartment (serial-letter used in addition) D Van DD Open, 2-tier car-carrier van Post Mail van AS SR WG Bar coach with dancing facilities WSP Pullman coach Le Open 2-axle 2-tier car-carrier wagon Leq Open 2-axle 2-tier car-carrier wagon fitted with train supply cable Laeq Open 3-axle 2-tier car-carrier wagon fitted with train supply cable
Index letters with an international value:
b h Coach fitted out to carry disabled passengers c Compartments convertible into couchette accommodation d v Vehicle fitted to receive bicycles ee z Vehicle fitted with central power supply f Vehicle fitted with driver’s cab (driving trailer) p t Centre-aisle coach with seats m Vehicle over 24,5 m in length s Centre-aisle in vans and coaches with luggage compartment The number of compartments is shown in the form of an index (for example: Bc9)
Serial letters and index letters with a national value
The others serial letters and index letters have a national value, defined by each Member State.
PART 14
LETTER MARKING FOR SPECIAL VEHICLES This marking is indicated in document EN 14033-1 Railway applications — Track — Technical requirements for railbound construction and maintenance machines — Part 1: Running of railbound machines.
Appendix Pa
PART 0
VEHICLE IDENTIFICATION
General remarks
This appendix describes the European Vehicle Number and linked marking applied in a visible manner on the vehicle to identify it uniquely and in a permanent manner during operation. It does not describe other numbers or markings eventually engraved or fixed in a permanent manner on the chassis or the main components of the vehicle during its construction.
European Vehicle number and linked abbreviations
Each railway vehicle receives a number consisting of 12 figures (called European Vehicle Number (EVN)) with the following structure: Rolling stock group Interoperability capability and vehicle type [2 figures] Country in which the vehicle is registered [2 figures] Technical characteristics [4 figures] Serial number [3 figures] Check digit [1 figure] Wagons 00 to 09 10 to 19 20 to 29 30 to 39 40 to 49 80 to 89 [details in part 6] 01 to 99 [details in part 4] 0000 to 9999 [details in part 9] 000 to 999 0 to 9 [details in part 3] Hauled passenger vehicles 50 to 59 60 to 69 70 to 79 [details in part 7] 0000 to 9999 [details in part 10] 000 to 999 Tractive rolling stock and units in a trainset in fixed or pre-defined formation 90 to 99 [details in part 8] 0000000 to 8999999 [the meaning of these figures is defined by the Member States, eventually by bilateral or multilateral agreement] Special vehicles 9000 to 9999 [details in part 11] 000 to 999 In a given country, the 7 digits of technical characteristics and serial number are sufficient to identify uniquely a vehicle inside the groups of hauled passenger vehicles and special vehicles. Alphabetical markings complete the number:
(a) markings linked to the interoperability ability (details in part 5);
(b) abbreviation of the country in which the vehicle is registered (details in part 4);
(c) Vehicle Keeper Marking (details in part 1);
(d) abbreviations of the technical characteristics (details in part 12 for the wagons, part 13 for the hauled passenger vehicles).
Allocation of number
The European Vehicle Number has to be allocated according to the rules laid down in Commission Decision 2007/756/EC. The European Vehicle Number shall be changed when it does not reflect the interoperability capability or technical characteristics according to this Appendix due to technical modifications of the vehicle. Such technical modifications may require a new placing in service according to Articles 20 to 25 of Directive 2008/57/EC.
PART 1
VEHICLE KEEPER MARKING
1. DEFINITION OF THE VEHICLE KEEPER MARKING (VKM) A Vehicle Keeper Marking (VKM) is an alphabetic code, consisting of two to five letters. A VKM is inscribed on each rail vehicle, near the European Vehicle Number. The VKM identifies the Vehicle Keeper as registered in a National Vehicle Register. A VKM is unique and valid in all countries covered by this TSI and all countries that enter into an agreement that involves the application of the system of vehicle numbering and VKM as described in this TSI.
2. FORMAT OF THE VEHICLE KEEPER MARKING The VKM is representation of the full name or abbreviation of the vehicle keeper, if possible in a recognisable manner. All 26 letters of the Latina alphabet may be used. The letters in the VKM are written in capitals. Letters that do not stand for first letters of words in the keeper's name may be written in lower case. For checking uniqueness, the letters written in lower case will be taken as written in capitals. Letters may contain diacritical signs. Diacritical signs used by these letters are ignored for checking uniqueness. For vehicles of keepers that reside in a country that does not use the Latin alphabet, a translation of the VKM in its own alphabet may be applied behind the VKM separated from it by a slash-sign (/). This translated VKM is disregarded for data-processing purposes.
3. PROVISIONS ABOUT ALLOCATION OF VEHICLE KEEPER MARKINGS A vehicle keeper can be issued more than one VKM, in case: A single VKM can be issued for a group of companies:
the vehicle keeper has a formal name in more than one language,
a vehicle keeper has good cause to distinguish between separate vehicle fleets within his organisation.
that belong to single corporate structure (e.g. holding structure),
that belong to a single corporate structure that has appointed and mandated one organisation within this structure to handle all issues on behalf of all others,
that has mandated a separate, single legal entity for handling all issues on their behalf, in which event the legal entity is the keeper.
4. REGISTER OF VEHICLE KEEPER MARKINGS AND PROCEDURE FOR ALLOCATION The register of VKM is public and updated on a real time basis. An application for a VKM is filed with the applicant's competent national authority and forwarded to the ERA. A VKM can be used only after publication by the ERA. The holder of a VKM must inform the competent national authority when he ends the use of a VKM, and the competent national authority will forward the information to the ERA. A VKM will then be revoked once the keeper has proved that the marking has been changed on all vehicles concerned. It will not be reissued for 10 years, unless it is reissued to the original holder or at his request to another holder. A VKM can be transferred to another holder, which is the legal successor to the original holder. A VKM stays valid when the VKM’s holder changes his name to a name that does not bear resemblance to the VKM. In case of a change of keeper which entails a change of VKM, the wagons concerned must be marked with the new VKM within three months from the date of registration of the change of keeper in the National Vehicle Register. In case of inconsistency between the VKM marked on the vehicle and the data registered in the NVR, the NVR registration supersedes.
PART 2
INSCRIPTION OF THE NUMBER AND LINKED ALPHABETICAL MARKING ON THE BODYWORK
1. GENERAL ARRANGEMENTS FOR EXTERNAL MARKINGS The capital letters and figures making up the marking inscriptions shall be at least 80 mm in height, in a sans serif font type of correspondence quality. A smaller height may only be used where there is no option but to place the marking on the sole bars. The marking is put not higher than 2 metres above rail level.
2. WAGONS The marking shall be inscribed on the wagon bodywork in the following manner: 23 TEN 80 D-RFC 7369 553-4 Zcs 31 TEN 80 D-DB 0691 235-2 Tanoos 33 TEN 84 NL-ACTS 4796 100-8 Slpss For wagons whose bodywork does not offer a large enough area for this type of arrangement, particularly in the case of flat wagons, the marking shall be arranged as follows: 01 87 3320 644-7 TEN F-SNCF Ks When one or more index letters with a national definition are inscribed on a wagon, this national marking must be shown after the international letter marking and separated from it by a hyphen as follows: 01 87 3320 644-7 TEN F-SNCF Ks-xy
3. COACHES AND HAULED PASSENGER STOCK The number shall be applied to each sidewall of the vehicle in the following manner: F-SNCF 61 87 20 – 72 021 – 7 B10 tu The marking of the country in which the vehicle is registered and of the technical characteristics are printed directly in front of, behind or under the European Vehicle number. In case of coaches with driver’s cabin, the European Vehicle number is also written inside the cabin.
4. LOCOMOTIVES, POWER CARS AND SPECIAL VEHICLES The European Vehicle Number must be marked on each sidewall of the tractive stock in the following manner: 92 10 1108 062-6 The European Vehicle Number is also written inside each cabin of the tractive rolling stock. The keeper can add, in letters of larger size than the European Vehicle Number, an own number marking (consisting generally of digits of the serial number supplemented by alphabetical coding) useful in operations. The place where the own number is marked is left to the choice of the keeper; however it must always be possible to identify easily the EVN from the keeper’s own number marking.
PART 3
RULES FOR THE DETERMINATION OF THE CHECK-DIGIT (DIGIT 12) The check-digit is determined in the following manner:
the digits in the even positions of the basic number (counting from the right) are taken at their own decimal value,
the digits in the odd positions of the basic number (counting from the right) are multiplied by two,
the sum formed by the digits in even position and by all the digits which constitute the partial products obtained from the odd positions is then established,
the units digit of this sum is retained,
the complement required to bring the units digit to 10 forms the check-digit; should this units digit be nought, then the check-digit will also be nought.
Examples 1 2 —
Let the basic number be 3 3 8 4 4 7 9 6 1 0 0 Multiplication factor 2 1 2 1 2 1 2 1 2 1 2 6 3 16 4 8 7 18 6 2 0 0 Sum: 6 + 3 + 1 + 6 + 4 + 8 + 7 + 1 + 8 + 6 + 2 + 0 + 0 = 52 The units digit of this sum is 2. The check-digit number will therefore be 8 and the basic number thus becomes the registration number 33 84 4796 100-8. Let the basic number be 3 1 5 1 3 3 2 0 1 9 8 Multiplication factor 2 1 2 1 2 1 2 1 2 1 2 6 1 10 1 6 3 4 0 2 9 16 Sum: 6 + 1 + 1 + 0 + 1 + 6 + 3 + 4 + 0 + 2 + 9 + 1 + 6 = 40 The units digit of this sum is 0. The check-digit number will therefore be 0 and the basic number thus becomes the registration number 31 51 3320 198-0.
PART 4
CODING OF THE COUNTRIES IN WHICH THE VEHICLES ARE REGISTERED (DIGITS 3-4 AND ABBREVIATION) The Information relating to third countries is given for information purposes only. Countries Alphabetical country code Numerical country code Albania AL 41 Algeria DZ 92 Armenia AM 58 Austria A 81 Azerbaijan AZ 57 Belarus BY 21 Belgium B 88 Bosnia-Herzegovina BIH 49 Bulgaria BG 52 China RC 33 Croatia HR 78 Cuba CU 40 Cyprus CY Czech Republic CZ 54 Denmark DK 86 Egypt ET 90 Estonia EST 26 Finland FIN 10 France F 87 Georgia GE 28 Germany D 80 Greece GR 73 Hungary H 55 Iran IR 96 Iraq IRQ 99 Ireland IRL 60 Israel IL 95 Italy I 83 Japan J 42 Kazakhstan KZ 27 Kyrgyzstan KS 59 Latvia LV 25 Lebanon RL 98 Liechtenstein FL Lithuania LT 24 Luxembourg L 82 Macedonia MK 65 Malta M Moldova MD 23 Monaco MC Mongolia MGL 31 Montenegro ME 62 Morocco MA 93 Netherlands NL 84 North Korea PRK 30 Norway N 76 Poland PL 51 Portugal P 94 Romania RO 53 Russia RUS 20 Serbia SRB 72 Slovakia SK 56 Slovenia SLO 79 South Korea ROK 61 Spain E 71 Sweden SE 74 Switzerland CH 85 Syria SYR 97 Tajikistan TJ 66 Tunisia TN 91 Turkey TR 75 Turkmenistan TM 67 Ukraine UA 22 United Kingdom GB 70 Uzbekistan UZ 29 Vietnam VN 32
PART 5 Notes: (a)(b)
ALPHABETICAL MARKING OF THE INTEROPERABILITY CAPABILITY TEN Vehicle which: PPV/PPW Vehicle which complies with PPV/PPW or PGW agreement (inside OSJD States) (original: PPV/PPW: ППВ (Правила пользования вагонами в международном сообщении); PGW: Правила Пользования Грузовики Вагонами) Vehicles marked TEN correspond to coding 0 to 3 of the first digit in the vehicle number specified in Appendix P, part 6; Vehicles which are not authorised for operation in all Member States need a marking indicating the Member States where they have been authorised. The list of authorising MS should be marked according to one of the following drawings, where D stands for the MS who has granted the first authorisation (in the given example, Germany) and F stands for the second authorising MS (in the given example, France). The MS are codified in accordance with part 4. This may cover vehicles which are TSI compliant or which are not. These vehicles correspond to coding 4 or 8 of the first digit in the vehicle number specified in part 6.
(a) complies with all relevant TSIs which are in force at the moment of placing in service and has been authorised to be placed in service according to Article 22(1) of Directive 2008/57/EC; and
(b) is provided with an authorisation valid in all Member States in accordance with Article 23(1) of Directive 2008/57/EC.
PART 6
INTEROPERABILITY CODES USED FOR WAGONS (DIGITS 1-2) 2nd digit 1st digit 0 1 2 3 4 5 6 7 8 9 2nd digit 1st digit Track Gauge fixed or variable fixed variable fixed variable fixed variable fixed variable fixed or variable Track Gauge TEN and/or COTIF and/or PPV/PPW 0 with axles Not to be used TEN and/or COTIF wagons not to be used PPV/PPW wagons (variable gauge) with axles 0 1 with bogies with bogies 1 TEN and/or COTIF and/or PPV/PPW 2 with axles TEN and/or COTIF wagons PPV/PPW wagons (fixed gauge) with axles 2 3 with bogies with bogies 3 Other wagons 4 with axles maintenance related wagons Other wagons Wagons with special numbering for technical characteristics not placed in service inside EU with axles 4 8 with bogies with bogies 8 Traffic Domestic traffic or international traffic by special agreement 1st digit 2nd digit 0 1 2 3 4 5 6 7 8 9 1st digit 2nd digit
PART 7
INTERNATIONAL TRAFFIC ABILITY CODES USED FOR HAULED PASSENGER VEHICLES (DIGITS 1-2) Domestic traffic TEN and/or COTIF and/or PPV/PPW Domestic traffic or international traffic by special agreement TEN and/or COTIF PPV/PPW 2nd digit 1st digit 0 1 2 3 4 5 6 7 8 9 5 Vehicles for domestic traffic Fixed-gauge non air-conditioned vehicles (including car-carrying wagons) Gauge-adjustable (1435/1520) non air-conditioned vehicles Not to be used Gauge-adjustable (1435/1668) non air-conditioned vehicles Historical vehicles Not to be used Fixed-gauge vehicles Gauge-adjustable (1435/1520) vehicles with change of bogies Gauge-adjustable (1435/1520) vehicles with gauge-adjustable axles 6 Service vehicles Fixed-gauge air-conditioned vehicles Gauge-adjustable (1435/1520) air-conditioned vehicles Service vehicles Gauge-adjustable (1435/1668) air-conditioned vehicles Car-carrying wagons Not to be used 7 Air-conditioned and pressure-tight vehicles Not to be used Not to be used Pressure-tight fixed-gauge air-conditioned vehicles Not to be used Other vehicles Not to be used Not to be used Not to be used Not to be used
PART 8
TYPES OF TRACTIVE ROLLING STOCK AND UNITS IN A TRAINSET IN FIXED OR PRE-DEFINED FORMATION (DIGITS 1-2) The first digit is 9. If the second digit describes the type of tractive stock, following coding is mandatory: Code General vehicle type 0 Miscellaneous 1 Electric locomotive 2 Diesel locomotive 3 Electric multiple-unit set (high speed) [power car or trailer] 4 Electric multiple-unit set except high speed [power car or trailer] 5 Diesel multiple-unit set [power car or trailer] 6 Specialised trailer 7 Electric shunting engine 8 Diesel shunting engine 9 Special vehicle
PART 9
STANDARD NUMERICAL MARKING OF WAGONS (DIGITS 5 TO 8) This appendix indicates the numerical marking associated to the main technical characteristics of the wagon and it is published on the ERA website (http://www.era.europa.eu). An application for a new code is filed with the registering entity (as referred to in Decision 2007/756/EC) and sent to the ERA. A new code can be used only after publication by the ERA.
PART 10
CODES FOR THE TECHNICAL CHARACTERISTICS OF THE HAULED PASSENGER STOCK (DIGITS 5-6) Part 10 is published on the ERA website (http://www.era.europa.eu). An application for a new code is filed with the registering entity (as referred to in Decision 2007/756/EC) and sent to the ERA. A new code can be used only after publication by the ERA.
PART 11
CODES FOR THE TECHNICAL CHARACTERISTICS OF THE SPECIAL VEHICLES (DIGIT 6 TO 8) Part 11 is published on the ERA website (http://www.era.europa.eu). An application for a new code is filed with the registering entity (as referred to in Decision 2007/756/EC) and sent to the ERA. A new code can be used only after publication by the ERA.
PART 12
LETTER MARKING FOR WAGONS EXCLUDING ARTICULATED AND MULTIPLE WAGONS Part 12 is published on the ERA website (http://www.era.europa.eu). An application for a new code is filed with the registering entity (as referred to in Decision 2007/756/EC) and sent to the ERA. A new code can be used only after publication by the ERA.
PART 13
LETTER MARKING FOR HAULED PASSENGER STOCK Part 13 is published on the ERA website (http://www.era.europa.eu). An application for a new code is filed with the registering entity (as referred to in Decision 2007/756/EC) and sent to the ERA. A new code can be used only after publication by the ERA.
PART 14
LETTER MARKING FOR SPECIAL VEHICLES Deleted
Appendix Q
Not used
Appendix R
Not used
Appendix S
Not used
Appendix T BRAKING PERFORMANCE
A.
ROLE OF THE INFRASTRUCTURE MANAGER The IM shall inform the RU about the braking performance required for each route and has to provide information about the route characteristics. The IM has to ensure that the impact of the route characteristics and trackside-related margins are included in the required braking performance. The required braking performance shall in principle be expressed in brake weight percentage unless the IM and RU have agreed on another unit to express the braking performance (e.g. braked tonnes, brake forces, deceleration values, deceleration profiles). For train sets and fixed train compositions the IM shall deliver the braking performance requirements in deceleration values if so requested by the RU.
B.
ROLE OF THE RAILWAY UNDERTAKING The RU shall ensure that each train satisfies or exceeds the braking performance required by the IM. Therefore the RU shall calculate the braking performance of a train taking into account the train composition. The RU must take into account the vehicle or train set braking performance determined when placed in service. Rolling stock-related margins like reliability and availability of the brakes have to be considered. The RU must also take into account the information about route characteristics which affect the train behaviour when tuning the braking performance for stopping and securing a train. The braking performance resulting from the checking of the actual train (like train composition, brake availability, brake settings) will be used as an input value for any operational rule to be subsequently applied to the train.
C.
BRAKING PERFORMANCE NOT ACHIEVED The IM has to set up rules to be used if a train does not reach the required braking performance and has to make these rules available to the RUs. If a train does not reach the braking performance required for the routes the train shall run, the RU has to respect the resulting constraints like speed restriction.
Appendix U LIST OF OPEN POINTS
APPENDIX B (SEE POINT 4.4 OF THIS TSI)
Other rules enabling a coherent operation
POINT 4.2.2.1.3.3
Freight trains not crossing a border between Member States
Appendix V
Not used
Appendix W GLOSSARY
The definitions in this glossary refer to the use of terms in this TSI OPE CR. Term Definition Accident As defined in Article 3 of Directive 2004/49/EC. Authorising the movement of trains The operation of equipment in signalling centres, electric traction current supply control rooms and traffic control centres that permits train movement. This does not include those staff employed by a Railway Undertaking who are responsible for management of resources such as train crew or rolling stock. Competence The qualification and experience necessary to safely and reliably undertake the task being performed. Experience can be gained as part of the training process. Dangerous goods As covered by Directive 2008/68/EC of 24 September 2008 on the inland transport of dangerous goods. Degraded operation Operation resulting from an unplanned event that prevents the normal delivery of train services. Despatch (= dispatch) See Train despatch. Driver As defined in Article 3 of Directive 2007/59/EC. Exceptional loads A load carried on a rail vehicle, for example a container, swap body or other traffic where the rail vehicle size and/or axle loading requires special authority for the movement and/or the application of special conditions of travel for all or part of the journey. Health and safety conditions In the context of this TSI, this refers only to the medical and psychological qualifications required to operate the relevant elements of the subsystem. Hot axle box An axle box and bearing that has exceeded its maximum designed operating temperature. Incident As defined in Article 3 of Directive 2004/49/EC. Length of train Total length of all vehicles over buffers including locomotive(s). Operating language The language or languages used in daily operation by an Infrastructure Manager and published in his Network Statement, for the communication of operational or safety related messages between the staff of the Infrastructure Manager and the Railway Undertaking. Passenger Person (other than an employee with specific duties on the train) travelling by train or on railway property before or after a train journey. Performance monitoring The systematic observation and recording of the performance of the train service and the infrastructure for the purpose of bringing about improvements in the performance of both. Qualification The physical and psychological suitability for the task together with the required knowledge. Real time The ability to exchange or process information on specified events (such as arrival at a station, passing a station or departure from a station) on the trains journey as they occur. Reporting point A point on the trains schedule where reporting of the arrival, departure or passing time is required. Route The particular section or sections of line. Safety-critical work Work performed by staff when they control or affect the movement of a vehicle, which could affect the health and safety of persons. Staff Employees working for a Railway Undertaking or an Infrastructure Manager, or their contractors, undertaking tasks as specified in this TSI. Stopping point A location identified in the schedule of a train where the train is planned to stop, usually to carry out a specific activity such as allowing passengers to join and leave the train. Timetable Document or system that gives details of a train(s) schedule over a particular route. Timing point A location identified in the schedule of a train where a specific time is identified. This time may be an arrival time, departure time or in the case of a train not scheduled to stop at that location the passing time. Traction unit A powered vehicle able to move itself and other vehicles to which it may be coupled. Train A train is defined as (a) traction unit(s) with or without coupled railway vehicles with train data available operating between two or more defined points. Train despatch The indication to the person driving the train that all station or depot activities are completed and that, as far as the staff responsible are concerned, movement authority has been granted for the train. Train crew Members of the on-board staff of a train, who are certified as competent and appointed by a Railway Undertaking to carry out specific, designated safety related tasks on the train, for example the driver or the guard. Train preparation Ensuring that a train is in a fit condition to enter service, that the train equipment is correctly deployed and the formation of the train matches the train’s designated pathway. Train preparation also includes technical inspections carried out prior to the train entering service. Abbreviation Explanation AC Alternating Current CCS Command Control Signalling CEN European Committee for Standardisation (Comité Européen de Normalisation) COTIF Convention Concerning International Carriage by Rail (Convention relative aux Transports Internationaux Ferroviaires) CR Conventional Rail dB Decibels DC Direct Current DMI Driver Machine Interface EC European Community ECG Electro Cardiogram EIRENE European Integrated Railway Radio Enhanced Network EN Euro-norm ENE Energy ERA European Railway Agency ERTMS European Rail Traffic Management System ETCS European Train Control System EU European Union FRS Functional Requirement Specification GSM-R Global System for Mobile Communications — Rail HABD Hot Axle Box Detector Hz Hertz IM Infrastructure Manager INF Infrastructure OPE Operation and Traffic Management OSJD Organisation for Cooperation of Railways PPV/PPW Russian abbreviation for Prawila Polzowaniia Wagonami w mejdunarodnom soobqenii = Rules for use of railway vehicles in international traffic RST Rolling Stock RU Railway Undertaking SMS Safety Management System SPAD Signal Passed at Danger SRS System Requirement Specification TAF Telematic Applications for Freight TEN Trans-European Network TSI Technical Specification for Interoperability UIC International Union of Railways (Union Internationale des Chemins de fer) VKM Vehicle Keeper Marking
Versions
Cited by
- Commission Decision of 23 July 2012 amending Decisions 2006/861/EC, 2008/163/EC, 2008/164/EC, 2008/217/EC, 2008/231/EC, 2008/232/EC, 2008/284/EC, 2011/229/EU, 2011/274/EU, 2011/275/EU, 2011/291/EU and 2011/314/EU concerning technical specifications for interoperability (notified under document C(2012) 4985) (Text with EEA relevance) (2012/464/EU) Decision · Grade B
Commission Decision 2011/314/EU of 12 May 2011 concerning the technical specification for interoperability relating to the operation and traffic management subsystem of the trans-European conventional rail system.
- Commission Decision of 23 July 2012 amending Decisions 2006/861/EC, 2008/163/EC, 2008/164/EC, 2008/217/EC, 2008/231/EC, 2008/232/EC, 2008/284/EC, 2011/229/EU, 2011/274/EU, 2011/275/EU, 2011/291/EU and 2011/314/EU concerning technical specifications for interoperability (notified under document C(2012) 4985) (Text with EEA relevance) (2012/464/EU) Decision · Grade B
The Annex to Decision 2011/314/EU is amended in accordance with Annex XII to this Decision.
- Commission Decision of 23 July 2012 amending Decisions 2006/861/EC, 2008/163/EC, 2008/164/EC, 2008/217/EC, 2008/231/EC, 2008/232/EC, 2008/284/EC, 2011/229/EU, 2011/274/EU, 2011/275/EU, 2011/291/EU and 2011/314/EU concerning technical specifications for interoperability (notified under document C(2012) 4985) (Text with EEA relevance) (2012/464/EU) Decision · Grade B
Appendix A to the Annex to Decision 2011/314/EU (CR OPE TSI) is replaced by the following:
- Commission Decision of 14 November 2012 concerning the technical specification for interoperability relating to the operation and traffic management subsystem of the rail system in the European Union and amending Decision 2007/756/EC (notified under document C(2012) 8075) (Text with EEA relevance) (2012/757/EU) Decision · Grade B
By Decision C(2010) 2576 of 29 April 2010, the Commission gave the Agency a mandate to develop and review the technical specifications for interoperability with a view to extending their scope to the whole rail system in the Union. Under the terms of that mandate, the Agency was asked to merge and extend the scope of the high-speed TSI and the conventional rail TSI relating to the Traffic Operation and Management subsystem. These TSIs were adopted respectively by Commission Decision 2008/231/EC, and Commission Decision 2011/314/EU.
- Commission Decision of 14 November 2012 concerning the technical specification for interoperability relating to the operation and traffic management subsystem of the rail system in the European Union and amending Decision 2007/756/EC (notified under document C(2012) 8075) (Text with EEA relevance) (2012/757/EU) Decision · Grade B
Member States shall notify the following types of agreement to the Commission by 30 June 2014 at the latest, provided they have not already been notified under Commission Decision 2006/920/EC, Decision 2008/231/EC or Decision 2011/314/EU:
- Commission Regulation (EU) No 321/2013 of 13 March 2013 concerning the technical specification for interoperability relating to the subsystem rolling stock — freight wagons of the rail system in the European Union and repealing Decision 2006/861/EC (Text with EEA relevance) Regulation · Grade B
Interface with the subsystem operation and traffic management Reference in this TSI Reference Commission Decision 2011/314/EU Strength of unit — Lifting and jacking Contingency arrangements Gauging Train composition Compatibility with load carrying capacity of lines Train composition Brake Train braking Attachment devices for rear-end signal. Appendix E Rear-end signal Rear-end
- Commission Regulation (EU) 2015/995 of 8 June 2015 amending Decision 2012/757/EU concerning the technical specification for interoperability relating to the operation and traffic management subsystem of the rail system in the European Union (Text with EEA relevance) Regulation · Grade B
Member States shall notify the Commission of the following types of agreement by 1 January 2016 at the latest, provided they have not already done so under Commission Decision 2006/920/EC, Decision 2008/231/EC, Decision 2011/314/EU or this Decision: