Commission Implementing Decision (EU) 2019/785 of 14 May 2019 on the harmonisation of radio spectrum for equipment using ultra-wideband technology in the Union and repealing Decision 2007/131/EC (notified under document C(2019) 3461) (Text with EEA relevance)
Grade B
mapped from publisher markup. A grade says how a document's structure was obtained, not how reliable the law is.
Address https://gelex.eu/eli/EU/decision/2019/785@2019-05-14/en
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Decision No 676/2002/EC of the European Parliament and of the Council of 7 March 2002 on a regulatory framework for radio spectrum policy in the European Community (Radio Spectrum Decision), and in particular Article 4(3) thereof,
Whereas:
(1) Commission Decision 2007/131/EC harmonises the technical conditions for spectrum use by radio equipment based on ultra-wideband (UWB) technology in the Union. It ensures that radio spectrum is available across the Union under harmonised conditions, eliminates barriers to the take-up of UWB technology and aims at creating an effective single market for UWB systems with significant economies of scale and benefits to the consumer.
(2) Although ultra-wideband signals are typically of extremely low power, the possibility of harmful interference with existing radiocommunication services exists and needs to be managed. Therefore, this Decision on the harmonisation of radio spectrum for UWB equipment should avoid harmful interference (including where this might arise from access to the radio spectrum by radio astronomy, earth exploration satellite and space research systems) and balance the incumbent services' interests against the overall policy objective of providing favourable conditions for the introduction of innovative technologies for the benefit of society.
(3) On 16 March 2017, the Commission issued a permanent mandate, pursuant to Decision No 676/2002/EC, to the European Conference of Postal and Telecommunications Administrations (CEPT) to identify the technical conditions for the harmonised introduction of radio applications based on UWB technology in the Union in order to provide updated technical conditions for such applications.
(4) In response to that permanent mandate, CEPT adopted a report where it proposed four measures. Firstly, the technical conditions should describe material sensing devices in a more neutral way in order to allow for innovative solutions. Secondly, it should be possible to use the conditions for generic UWB usage also for material sensing applications. Thirdly, there should be a – 65 dBm/MHz limit for all material sensing devices including building material analysis (BMA) in the 8,5-10,6 GHz band. Fourthly, the possibility of a trigger-before-transmit mitigation for vehicular access control systems based on UWB technology should be introduced in the 3,8-4,2 GHz and 6-8,5 GHz frequency bands.
(5) This Decision should support the overall harmonisation of the UWB regulatory framework in order to improve consistency of limits and mitigation techniques between the different UWB regulations and allow for innovative solutions in the field of UWB technology.
(6) This Decision provides for regulatory limits and identifies mitigation techniques to ensure an efficient usage of spectrum while ensuring coexistence with other spectrum users. Technological evolution may provide other solutions that ensure at least an equivalent level of spectrum protection. For this reason, the use of alternative mitigation techniques, such as solutions found in future possible harmonised standards produced by the European Standardisation Organisations, should be allowed provided they ensure at least an equivalent level of performance and spectrum protection and verifiably respect the established technical requirements of this regulatory framework.
(7) Decision 2007/131/EC has been amended several times. In the interest of legal clarity Decision 2007/131/EC should be repealed.
(8) The measures provided for in this Decision are in accordance with the opinion of the Radio Spectrum Committee,
HAS ADOPTED THIS DECISION:
Article 1
The purpose of this Decision is to harmonise the technical conditions for the availability and efficient use of radio spectrum by equipment using ultra-wideband technology in the Union.
Article 2
For the purposes of this Decision, the following definitions shall apply:
(a) equipment using ultra-wideband technology means equipment incorporating, as an integral part or as an accessory, technology for short-range radiocommunication, involving the intentional generation and transmission of radio-frequency energy that spreads over a frequency range wider than 50 MHz, which may overlap several frequency bands allocated to radiocommunication services;
(b) non-interference and non-protected basis means that no harmful interference may be caused to any radiocommunication service and that no claim may be made for protection of these devices against interference originating from radiocommunication services;
(c) indoors means inside buildings or places in which the shielding will typically provide the necessary attenuation to protect radiocommunication services against harmful interference;
(d) motor vehicle has the same meaning as set out in Article 3(11) of Directive 2007/46/EC of the European Parliament and of the Council;
(e) railway vehicle has the same meaning as set out in Article 3(1)(4) of Regulation (EU) 2018/643 of the European Parliament and of the Council;
(f) e.i.r.p. means equivalent isotropically radiated power, which is the product of the power supplied to the antenna and the antenna gain in a given direction relative to an isotropic antenna (absolute or isotropic gain);
(g) maximum mean power spectral density means the average power per unit bandwidth (centred on that frequency) radiated in the direction of the maximum level under the specified conditions of measurement and which is specified as e.i.r.p. of the radio device under test at a particular frequency;
(h) peak power means the power contained within a 50 MHz bandwidth at the frequency at which the highest mean radiated power occurs, radiated in the direction of the maximum level under the specified conditions of measurement and which is specified as e.i.r.p.;
(i) total power spectral density means the average of the mean power spectral density values measured over a sphere around the measurement scenario with a resolution of at least 15 degrees;
(j) onboard aircraft means the use of radio links for communications purposes inside an aircraft;
(k) LT1 means systems intended for general location tracking of people and objects that can be put into service on an unlicensed basis.
Article 3
Within six months after this Decision takes effect, Member States shall designate and make available the radio spectrum, on a non-interference and non-protected basis, for equipment using ultra-wideband technology provided that such equipment meets the conditions set out in the Annex and it is used indoors or, if it is used outdoors, it is not attached to a fixed installation, a fixed infrastructure or a fixed outdoor antenna. Equipment using ultra-wideband technology which meets the conditions set out in the Annex shall also be allowed in motor and railway vehicles.
Article 4
Member States shall monitor the use of the bands identified in the Annex by equipment using ultra-wideband technology, in particular to ensure that all the conditions laid down in Article 3 of this Decision continue to be relevant, and report their findings to the Commission.
Article 5
Decision 2007/131/EC is repealed.
Article 6
This Decision is addressed to Member States.
Done at Brussels, 14 May 2019. For the Commission Mariya Gabriel Member of the Commission
ANNEX
ANNEX
1. GENERIC ULTRA-WIDEBAND (UWB) USAGE Technical requirements Frequency range Maximum mean power spectral density (e.i.r.p.) Maximum peak power (e.i.r.p.) (defined in 50 MHz) f ≤ 1,6 GHz – 90 dBm/MHz – 50 dBm 1,6 < f ≤ 2,7 GHz – 85 dBm/MHz – 45 dBm 2,7 < f ≤ 3,1 GHz – 70 dBm/MHz – 36 dBm 3,1 < f ≤ 3,4 GHz – 70 dBm/MHz or – 41,3 dBm/MHz using LDC or DAA – 36 dBm or 0 dBm 3,4 < f ≤ 3,8 GHz – 80 dBm/MHz or – 41,3 dBm/MHz using LDC or DAA – 40 dBm or 0 dBm 3,8 < f ≤ 4,8 GHz – 70 dBm/MHz or – 41,3 dBm/MHz using LDC or DAA – 30 dBm or 0 dBm 4,8 < f ≤ 6 GHz – 70 dBm/MHz – 30 dBm 6 < f ≤ 8,5 GHz – 41,3 dBm/MHz 0 dBm 8,5 < f ≤ 9 GHz – 65 dBm/MHz or – 41,3 dBm/MHz using DAA – 25 dBm or 0 dBm 9 < f ≤ 10,6 GHz – 65 dBm/MHz – 25 dBm f > 10,6 GHz – 85 dBm/MHz – 45 dBm
2. LOCATION TRACKING SYSTEMS Type 1 (LT1) Technical requirements Frequency range Maximum mean power spectral density (e.i.r.p.) Maximum peak power (e.i.r.p.) (defined in 50 MHz) f ≤ 1,6 GHz – 90 dBm/MHz – 50 dBm 1,6 < f ≤ 2,7 GHz – 85 dBm/MHz – 45 dBm 2,7 < f ≤ 3,4 GHz – 70 dBm/MHz – 36 dBm 3,4 < f ≤ 3,8 GHz – 80 dBm/MHz – 40 dBm 3,8 < f ≤ 6,0 GHz – 70 dBm/MHz – 30 dBm 6 < f ≤ 8,5 GHz – 41,3 dBm/MHz 0 dBm 8,5 < f ≤ 9 GHz – 65 dBm/MHz or – 41,3 dBm/MHz using DAA – 25 dBm or 0 dBm 9 < f ≤ 10,6 GHz – 65 dBm/MHz – 25 dBm f > 10,6 GHz – 85 dBm/MHz – 45 dBm
3. UWB DEVICES INSTALLED IN MOTOR AND RAILWAY VEHICLES Technical requirements Frequency range Maximum mean power spectral density (e.i.r.p.) Maximum peak power (e.i.r.p.) (defined in 50 MHz) f ≤ 1,6 GHz – 90 dBm/MHz – 50 dBm 1,6 < f ≤ 2,7 GHz – 85 dBm/MHz – 45 dBm 2,7 < f ≤ 3,1 GHz – 70 dBm/MHz – 36 dBm 3,1 < f ≤ 3,4 GHz – 70 dBm/MHz or – 41,3 dBm/MHz using LDC + e.l. or – 41,3 dBm/MHz using TPC+ DAA + e.l. – 36 dBm or ≤ 0 dBm or ≤ 0 dBm 3,4 < f ≤ 3,8 GHz – 80 dBm/MHz or – 41,3 dBm/MHz using LDC + e.l. or – 41,3 dBm/MHz using TPC+DAA + e.l. – 40 dBm or ≤ 0 dBm or ≤ 0 dBm 3,8 < f ≤ 4,8 GHz – 70 dBm/MHz or – 41,3 dBm/MHz using LDC + e.l. or – 41,3 dBm/MHz using TPC+DAA + e.l. – 30 dBm or ≤ 0 dBm or ≤ 0 dBm 4,8 < f ≤ 6 GHz – 70 dBm/MHz – 30 dBm 6 < f ≤ 8,5 GHz – 53,3 dBm/MHz or – 41,3 dBm/MHz using LDC + e.l. or – 41,3 dBm/MHz using TPC + e.l. – 13.3 dBm or ≤ 0 dBm or ≤ 0 dBm 8,5 < f ≤ 9 GHz – 65 dBm/MHz or – 41,3 dBm/MHz using TPC+DAA + e.l. – 25 dBm or ≤ 0 dBm 9 < f ≤ 10,6 GHz – 65 dBm/MHz – 25 dBm f > 10,6 GHz – 85 dBm/MHz – 45 dBm Technical requirements to be used within the bands 3,8-4,2 GHz and 6-8,5 GHz for vehicular access systems using trigger-before-transmit are defined in the following table. Technical requirements Frequency range Maximum mean power spectral density (e.i.r.p.) Maximum peak power (e.i.r.p.) (defined in 50 MHz) 3.8 < f ≤ 4,2 GHz – 41,3 dBm/MHz with trigger-before-transmit operation and LDC ≤ 0,5 % (in 1h) 0 dBm 6 < f ≤ 8,5 GHz – 41,3 dBm/MHz with trigger-before-transmit operation and LDC ≤ 0,5 % (in 1h) or TPC 0 dBm Trigger-before-transmit mitigation is defined as a UWB transmission that is only initiated when necessary, specifically where the system indicates that UWB devices are nearby. The communication is either triggered by a user or by the vehicle. The subsequent communication can be considered as triggered communication. The existing LDC mitigation applies (or alternatively TPC in the 6 GHz to 8,5 GHz range). An exterior limit requirement must not be applied when using the trigger-before-transmit mitigation technique for vehicular access systems. Trigger-before-transmit mitigation techniques that provide an appropriate level of performance in order to comply with the essential requirements of Directive 2014/53/EU shall be used for vehicular access systems. If relevant techniques are described in harmonised standards or parts thereof the references of which have been published in the Official Journal of the European Union under Directive 2014/53/EU, performance at least equivalent to these techniques shall be ensured. These techniques shall respect the technical requirements of this Decision.
4. UWB ONBOARD AIRCRAFT The values for maximum mean power spectral density (e.i.r.p.) and maximum peak power (e.i.r.p.) for short-range devices using UWB technology, with or without use of mitigation techniques are listed in the table below. Technical requirements Frequency range Maximum mean power spectral density (e.i.r.p.) Maximum peak power (e.i.r.p.) (defined in 50 MHz) Requirements for mitigation techniques f ≤ 1,6 GHz – 90 dBm/MHz – 50 dBm 1,6 < f ≤ 2,7 GHz – 85 dBm/MHz – 45 dBm 2,7 < f ≤ 3,4 GHz – 70 dBm/MHz – 36 dBm 3,4 < f ≤ 3,8 GHz – 80 dBm/MHz – 40 dBm 3,8 < f ≤ 6,0 GHz – 70 dBm/MHz – 30 dBm 6,0 < f ≤ 6,650 GHz – 41,3 dBm/MHz 0 dBm 6,650 < f ≤ 6,6752 GHz – 62,3 dBm/MHz – 21 dBm notch of 21 dB should be implemented to meet the – 62,3 dBm/MHz level 6,6752 < f ≤ 8,5 GHz – 41,3 dBm/MHz 0 dBm 7,25 to7,75 GHz (FSS and MetSat (7,45 to 7,55 GHz) protection) 7,75 to 7,9 GHz (MetSat protection) 8,5 < f ≤ 10,6 GHz – 65 dBm/MHz – 25 dBm f > 10,6 GHz – 85 dBm/MHz – 45 dBm
5. MATERIAL SENSING DEVICES USING UWB TECHNOLOGY
5.
5.1. Introduction UWB material sensing devices are split into two classes: Material sensing devices based on UWB technology shall comply either with the generic UWB regulation based on technical conditions specified in section 1 of this Annex or with the specific limits for material sensing devices as defined in sections 5.2 and 5.3. The generic UWB regulation excludes fixed outdoor installations. Emissions radiated by a material sensing device must not exceed the limits of the regulation for generic UWB usage specified in section 1. Material sensing devices must fulfil the requirements of mitigation techniques specified for the generic use of UWB in section 1. The specific limits for material sensing devices including the mitigation techniques are listed in the following tables. Emissions radiating from material sensing devices permitted under this Decision must be kept to a minimum and in any case not exceed the emission limits within the following tables. Compliance with the specific limits must be ensured by the device placed on a representative structure of the investigated material. The specific limits listed in the following tables are applicable in all environments for material sensing devices, except those to which note 5 of these tables, which excludes fixed outdoor installation in certain applicable frequency ranges, applies.
Contact based UWB material sensing devices, for which the UWB transmitter is only switched on when in direct contact with the material under investigation;
Non-contact based UWB material sensing devices, for which the UWB transmitter is only switched on when it is near the investigated material and the UWB transmitter is directed towards the material under investigation (for example manually by using a proximity sensor or by mechanical design).
5.2. Contact based material sensing devices The specific limits for maximum mean power spectral density (e.i.r.p.) and maximum peak power (e.i.r.p.) for contact based material sensing devices using UWB technology are defined in the table below. Technical requirements for contact based UWB material sensing devices Frequency range Maximum mean power spectral density (e.i.r.p.) Maximum peak power (e.i.r.p.) (defined in 50 MHz) f ≤ 1,73 GHz – 85 dBm/MHz – 45 dBm 1,73 < f ≤ 2,2 GHz – 65 dBm/MHz – 25 dBm 2,2 < f ≤ 2,5 GHz – 50 dBm/MHz – 10 dBm 2,5 < f ≤ 2,69 GHz – 65 dBm/MHz – 25 dBm 2,69 < f ≤ 2,7 GHz – 55 dBm/MHz – 15 dBm 2,7 < f ≤ 2,9 GHz – 70 dBm/MHz – 30 dBm 2,9 < f ≤ 3,4 GHz – 70 dBm/MHz – 30 dBm 3,4 < f ≤ 3,8 GHz – 50 dBm/MHz – 10 dBm 3,8 < f ≤ 4,8 GHz – 50 dBm/MHz – 10 dBm 4,8 < f ≤ 5,0 GHz – 55 dBm/MHz – 15 dBm 5,0 < f ≤ 5,25 GHz – 50 dBm/MHz – 10 dBm 5,25 < f ≤ 5,35 GHz – 50 dBm/MHz – 10 dBm 5,35 < f ≤ 5,6 GHz – 50 dBm/MHz – 10 dBm 5,6 < f ≤ 5,65 GHz – 50 dBm/MHz – 10 dBm 5,65 < f ≤ 5,725 GHz – 50 dBm/MHz – 10 dBm 5,725 < f ≤ 6,0 GHz – 50 dBm/MHz – 10 dBm 6,0 < f ≤ 8,5 GHz – 41,3 dBm/MHz 0 dBm 8,5 < f ≤ 9,0 GHz – 65 dBm/MHz – 25 dBm 9,0 < f ≤ 10,6 GHz – 65 dBm/MHz – 25 dBm f > 10,6 GHz – 85 dBm/MHz – 45 dBm
5.3 Non-contact based material sensing devices The specific limits for maximum mean power spectral density (e.i.r.p.) and maximum peak power (e.i.r.p.) for non-contact based material sensing devices using UWB technology are defined in the table below. Technical requirements for non-contact based UWB material sensing devices Frequency range Maximum mean power spectral density (e.i.r.p.) Maximum peak power (e.i.r.p.) (defined in 50 MHz) f ≤ 1,73 GHz – 85 dBm/MHz – 60 dBm 1,73 < f ≤ 2,2 GHz – 70 dBm/MHz – 45 dBm 2,2 < f ≤ 2,5 GHz – 50 dBm/MHz – 25 dBm 2,5 < f ≤ 2,69 GHz – 65 dBm/MHz – 40 dBm 2,69< f ≤ 2,7 GHz – 70 dBm/MHz – 45 dBm 2,7 < f ≤ 2,9 GHz – 70 dBm/MHz – 45 dBm 2,9 < f ≤ 3,4 GHz – 70 dBm/MHz – 45 dBm 3,4 < f ≤ 3,8 GHz – 70 dBm/MHz – 45 dBm 3,8 < f ≤ 4,8 GHz – 50 dBm/MHz – 25 dBm 4,8 < f ≤ 5,0 GHz – 55 dBm/MHz – 30 dBm 5,0 < f ≤ 5,25 GHz – 55 dBm/MHz – 30 dBm 5,25 < f ≤ 5,35 GHz – 50 dBm/MHz – 25 dBm 5,35 < f ≤ 5,6 GHz – 50 dBm/MHz – 25 dBm 5,6 < f ≤ 5,65 GHz – 50 dBm/MHz – 25 dBm 5,65 < f ≤ 5,725 GHz – 65 dBm/MHz – 40 dBm 5,725 < f ≤ 6,0 GHz – 60 dBm/MHz – 35 dBm 6,0 < f ≤ 8,5 GHz – 41.3 dBm/MHz 0 dBm 8,5 < f ≤ 9,0 GHz – 65 dBm/MHz – 25 dBm 9,0 < f ≤ 10,6 GHz – 65 dBm/MHz – 25 dBm f > 10,6 GHz – 85 dBm/MHz – 45 dBm Peak power threshold values for the LBT mechanism to ensure the protection of radio services listed below are defined in the following table. Technical requirements of the LBT mechanism for material sensing devices Frequency range Radio service to be detected Peak power threshold value 1,215 <f ≤ 1,4 GHz Radiodetermination service + 8 dBm/MHz 1,61<f ≤ 1,66 GHz Mobile satellite service – 43 dBm/MHz 2,5 < f ≤ 2,69 GHz Land mobile service – 50 dBm/MHz 2,9 < f ≤ 3,4 GHz Radiodetermination service – 7dBm/MHz Additional requirements for radar detection: continuously listening and automatic switch-off within 10 ms for the related frequency range if the threshold value is exceeded (table with LBT mechanism). A silent time of at least 12 s while listening continuously is necessary before the transmitter can be switched on again. This silent time during which only the LBT receiver is active must be ensured even after the device is switched off.
Versions
Cited by
- Commission Implementing Decision (EU) 2024/1467 of 27 May 2024 amending Implementing Decision (EU) 2019/785 on the harmonisation of radio spectrum for equipment using ultra-wideband technology in the Union (notified under document C(2024) 3377) (Text with EEA relevance) Decision · Grade B
Commission Implementing Decision (EU) 2019/785 harmonises the technical conditions for spectrum use by radio equipment based on ultra-wideband (UWB) technology in the Union. That Decision ensures that radio spectrum is available across the Union under harmonised conditions, eliminates barriers to the take-up of UWB technology and aims at creating an effective single market for UWB systems with significant economies of scale and benefits to the consumer.
- Commission Implementing Decision (EU) 2024/1467 of 27 May 2024 amending Implementing Decision (EU) 2019/785 on the harmonisation of radio spectrum for equipment using ultra-wideband technology in the Union (notified under document C(2024) 3377) (Text with EEA relevance) Decision · Grade B
On 16 March 2017, the Commission issued a permanent mandate, pursuant to Decision 676/2002/EC, to the European Conference of Postal and Telecommunications Administrations (CEPT) to identify the technical conditions for the harmonised introduction of radio applications based on UWB technology in the Union in order to provide updated technical conditions for such applications. That permanent mandate was amended in 2019 following the adoption of Implementing Decision (EU) 2019/785 and repeal of Commission Decision 2007/131/EC.
- Commission Implementing Decision (EU) 2024/1467 of 27 May 2024 amending Implementing Decision (EU) 2019/785 on the harmonisation of radio spectrum for equipment using ultra-wideband technology in the Union (notified under document C(2024) 3377) (Text with EEA relevance) Decision · Grade B
Implementing Decision (EU) 2019/785 is amended as follows:
- Commission Implementing Decision (EU) 2022/2191 of 8 November 2022 on the harmonised standards for radio equipment drafted in support of Directive 2014/53/EU of the European Parliament and of the Council (Text with EEA relevance) Decision · Grade B
No Reference of the standard 1. EN 50360:2017 Product standard to demonstrate the compliance of wireless communication devices, with the basic restrictions and exposure limit values related to human exposure to electromagnetic fields in the frequency range from 300 MHz to 6 GHz: devices used next to the ear 2. EN 50385:2017 Product standard to demonstrate the compliance of base station equipment with radiofrequency electromagnetic field exposure limits (110 MHz – 100 GHz), when placed on the market 3. EN 50401:2017 Product standard to demonstrate the compliance of base station equipment with r
- Commission Implementing Decision (EU) 2020/167 of 5 February 2020 on the harmonised standards for radio equipment drafted in support of Directive 2014/53/EU of the European Parliament and of the Council Decision · Grade B
Harmonised standard EN 302 065-3 V2.1.1 the reference to which is published in the Official Journal of the European Union does not describe trigger-before-transmit mitigation techniques. Commission Implementing Decision (EU) 2019/785, however, imposes, as of 16 November 2019, technical requirements to be used within the bands 3,8-4,2 GHz and 6-8,5 GHz for vehicular access systems using trigger-before-transmit. Implementing Decision (EU) 2019/785 provides that trigger-before-transmit mitigation techniques that provide an appropriate level of performance in order to comply with the essential req
- Commission Implementing Decision (EU) 2020/167 of 5 February 2020 on the harmonised standards for radio equipment drafted in support of Directive 2014/53/EU of the European Parliament and of the Council Decision · Grade B
No Reference of the standard 1. EN 300 698 V2.3.1 Radio telephone transmitters and receivers for the maritime mobile service operating in the VHF bands used on inland waterways; Harmonised Standard for access to radio spectrum and for features for emergency services Notice: Compliance with this harmonised standard does not confer a presumption of conformity to the essential requirement set out in Article 3(2) of Directive 2014/53/EU if, in clause 8.2.3 of this harmonised standard, the sentence With the output power switch set at maximum, the carrier power shall be within ±1,5 dB of the rated o
- Council Decision (EU) 2023/2096 of 28 September 2023 on the position to be taken on behalf of the European Union within the Association Committee in Trade configuration established by the Association Agreement between the European Union and the European Atomic Energy Community and their Member States, of the one part, and the Republic of Moldova, of the other part as regards the modification of Annex XXVIII-B (Rules applicable to telecommunication services) and Annex XXVIII-C (Rules applicable to postal and courier services) to that Agreement Decision · Grade B
Timetable: the provisions of Commission Implementing Decision (EU) 2019/785 shall be implemented within 1 year after the date of entry into force of this Decision.
- Council Decision (EU) 2023/2096 of 28 September 2023 on the position to be taken on behalf of the European Union within the Association Committee in Trade configuration established by the Association Agreement between the European Union and the European Atomic Energy Community and their Member States, of the one part, and the Republic of Moldova, of the other part as regards the modification of Annex XXVIII-B (Rules applicable to telecommunication services) and Annex XXVIII-C (Rules applicable to postal and courier services) to that Agreement Decision · Grade B
Annex XXVIII-B (Rules applicable to telecommunication services) shall be amended by adding the following EU acts: Directive (EU) 2018/1972 of the European Parliament and of the Council of 11 December 2018 establishing the European Electronic Communications Code (recast) (EECC). Regulation (EU) 2022/612 of the European Parliament and of the Council of 6 April 2022 on roaming on public mobile communications networks within the Union (recast). The provisions of Regulation (EU) 2022/612 shall, for the purposes of this Agreement, be read with the following adaptation: Article 1(4) refers to referen