Commission Implementing Decision (EU) 2019/995 of 17 June 2019 amending Implementing Decision (EU) 2016/2323 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council (Text with EEA relevance)
Grade B
mapped from publisher markup. A grade says how a document's structure was obtained, not how reliable the law is.
Address https://gelex.eu/eli/EU/decision/2019/995@2019-06-17/en
Contents
- Preamble
- ANNEX
- ANNEX
- PART A Ship recycling facilities located in a Member State
- NV Galloo Recycling Ghent
- FAYARD A/S
- Fornæs ApS
- Modern American Recycling Services Europe (M.A.R.S)
- Smedegaarden A/S
- Stena Recycling A/S
- BLRT Refonda Baltic OÜ
- DDR VESSELS XXI, S.L.
- Démonaval Recycling
- GARDET & DE BEZENAC Recycling/Groupe BAUDELET ENVIRONNEMENT – GIE MUG
- Grand Port Maritime de Bordeaux
- Les Recycleurs bretons
- San Giorgio del Porto S.p.A.
- A/S Tosmares kuģubūvētava
- UAB APK
- UAB Armar
- UAB Vakaru refonda
- Keppel-Verolme
- Scheepssloperij Nederland B.V.
- AF Offshore Decom
- Green Yard AS
- Kvaerner AS (Stord)
- Lutelandet Industrihamn
- Norscrap West AS
- Navalria — Docas, Construções e Reparações Navais
- Turun Korjaustelakka Oy (Turku Repair Yard Ltd)
- Able UK Limited
- Dales Marine Services Ltd
- Harland and Wolff Heavy Industries Limited
- Swansea Drydock Ltd
- PART B Ship recycling facilities located in a third country
- Isiksan Gemi Sokum Pazarlama Ve Tic. Ltd Sti.
- LEYAL GEMİ SÖKÜM SANAYİ ve TİCARET LTD.
- LEYAL-DEMTAŞ GEMİ SÖKÜM SANAYİ ve TİCARET A.Ş.
- International Shipbreaking Limited L.L.C
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 1257/2013 of the European Parliament and of the Council of 20 November 2013 on ship recycling and amending Regulation (EC) No 1013/2006 and Directive 2009/16/EC, and in particular Article 16 thereof,
Whereas:
(1) Article 6(2) of Regulation (EU) No 1257/2013 requires ship owners to ensure that ships destined to be recycled are only recycled at ship recycling facilities included in the European List of ship recycling facilities published pursuant to Article 16 of that Regulation.
(2) The European List is set out in Commission Implementing Decision (EU) 2016/2323.
(3) Denmark has informed the Commission that two ship recycling facilities located in its territory have been authorised by the competent authority in accordance with Article 14 of Regulation (EU) No 1257/2013. Denmark has provided the Commission with all information relevant for those facilities to be included in the European List. The European List should therefore be updated to include those facilities.
(4) Following incorporation of Regulation (EU) No 1257/2013 into the Agreement on the European Economic Area, Norway has informed the Commission that five ship recycling facilities located in its territory have been authorised by the competent authority in accordance with Article 14 of that Regulation. Norway has provided the Commission with all information relevant for those facilities to be included in the European List. The European List should therefore be updated to include those facilities.
(5) The Commission has received an application in accordance with Article 15(1) of Regulation (EU) No 1257/2013 for a ship recycling facility located in Turkey to be included in the European List. Having assessed the information and supporting evidence provided or gathered in accordance with Article 15 of that Regulation, the Commission considers that the facility complies with the requirements set out in Article 13 of that Regulation to conduct ship recycling and to be included in the European List. The European List should therefore be updated to include that facility.
(6) Moreover, it is necessary to correct an error in relation to the information with regard to Article 16(2)(d) of Regulation (EU) No 1257/2013 included in the European List for the ship recycling facility located in Finland.
(7) Implementing Decision (EU) 2016/2323 should therefore be amended accordingly.
(8) The measures provided for in this Decision are in accordance with the opinion of the Committee established by Article 25 of Regulation (EU) No 1257/2013,
HAS ADOPTED THIS DECISION:
Article 1
The Annex to Implementing Decision (EU) 2016/2323 is replaced by the text in the Annex to this Decision.
Article 2
This Decision shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
Done at Brussels, 17 June 2019. For the Commission The President Jean-Claude Juncker
ANNEX
ANNEX
ANNEX THE EUROPEAN LIST OF SHIP RECYCLING FACILITIES REFERRED TO IN ARTICLE 16 OF REGULATION (EU) No 1257/2013
PART A Ship recycling facilities located in a Member State
Name of the facility Method of recycling Type and size of ships that can be recycled Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authority Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facility Date of expiry of inclusion in the European List BELGIUM Alongside (wet berth), slope Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Tacit approval, with a maximum review period of 30 days 34000 31 March 2020 DENMARK Drydock decommissioning and recycling Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: The ship recycling facility is regulated in accordance with applicable legislation and with the conditions set out in Environmental Permit of 7 November 2018 issued by the Municipality of Kerteminde. The Environmental Permit includes conditions for operating hours, special operating conditions, handling and storage of waste and also includes a condition that the activity must be carried out in a dry dock. Tacit approval, with a maximum review period of 14 days. 0 7 November 2023 Dismantling by quay and subsequent scrapping on impermeable floors with effective drainage systems Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: The municipality of Norddjurs has the right to allocate Hazardous waste for environmentally approved reception facilities. Tacit approval, with a maximum review period of 14 days. 30000 30 June 2021 Clipping and flame cutting after the item for dismantling has been placed in a slipway facility Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 9 March 2018 issued by the Municipality of Frederikshavn The Municipality of Frederikshavn has the right to allocate hazardous waste to environmentally approved reception facilities, as set out in the Environmental Permit for the ship recycling facility. The facility must not store hazardous waste for more than one year. Tacit approval, with a maximum review period of 14 days. 0 23 August 2023 Dismantling by quay and subsequent scrapping on impermeable floors with effective drainage systems Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Tacit approval, with a maximum review period of 14 days 20000 15 September 2021 Clipping and flame cutting after the item for dismantling has been placed within a confined flooding proof area with impermeable floors and effective drainage systems Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013. Maximum ship dimensions: The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 5 October 2017 issued by Esbjerg Municipality. Esbjerg Municipality has the right to allocate hazardous waste to environmentally approved reception facilities, as set out in the Environmental Permit for the ship recycling facility Tacit approval, with a maximum review period of 14 days 0 7 February 2024 ESTONIA Afloat at the quayside and in the floating dock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Waste permit No. L.JÄ/327249. Hazardous waste management licence No 0222. Rules of the Vene-Balti Port, Manual on Ships Recycling MSR-Refonda. Environmental Management System, Waste management EP 4.4.6-1-13 The facility can recycle only the hazardous materials for which it has been licensed. Tacit approval, with a maximum review period of 30 days. 21852 15 February 2021 SPAIN Dismantling ramp Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013, except nuclear ships. Maximum ship dimensions: The limitations are included in the integrated environmental authorisation. Explicit approval by the Harbour Masters Office of the port where the facility is located 0 28 July 2020 FRANCE Alongside, drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions (drydock): Environmental limitations are defined in the prefectural authorisation. Explicit approval – The competent authority for the approval decision is the minister of environment 0 11 December 2022 Floating and slipway Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Environmental limitations are defined in the prefectural authorisation. Explicit approval – The competent authority for the approval decision is the minister of environment. 16000 30 December 2021 Alongside, drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions (drydock): Environmental limitations are defined in the prefectural authorisation. Explicit approval – The competent authority for the approval decision is the minister of environment. 18000 21 October 2021 Alongside, drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions (drydock): Environmental limitations are defined in the prefectural authorisation. Explicit approval – The competent authority for the approval decision is the minister of environment. 5500 24 May 2021 ITALY Alongside, drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: The limitations and restrictions are included in the integrated environmental authorisation. The facility has a Ship Recycling Facility Plan that meets the requirements of Regulation (EU) No 1257/2013 Explicit approval 38564 6 June 2023 LATVIA Ship dismantling (wet berth and dry dock) Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: See national permit No. LI10IB0024. Explicit approval — written notification in 30 working days 0 11 June 2020 LITHUANIA Alongside (wet berth) Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: See national permit No. TL-KL.1-15/2015 Explicit approval — written notification in 30 working days 1500 17 March 2020 Alongside (wet berth) Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions (berth 127A): Maximum ship dimensions (berth 131A): See national permit No. TL-KL.1-16/2015 (berth 127A) See national permit No. TL-KL.1-51/2017 (berth 131A) Explicit approval — written notification in 30 working days 3910 17 March 2020 (berth 127A) 19 April 2022 (berth 131A) Alongside (wet berth) Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: See national permit No. (11.2)-30-161/2011/TL-KL.1-18/2015 Explicit approval — written notification in 30 working days 20140 21 May 2020 THE NETHERLANDS Shipbreaking Maximum ship dimensions: The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. Explicit approval 52000 21 July 2021 Shipbreaking Maximum ship dimensions: Recycling operations start on water to make the hull lighter; the winch to haul ships on the ramp can pull 2000 tonnes. The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. Explicit approval 9300 27 September 2021 NORWAY Dismantling at quay and subsequent skidding of hull to quay. Waste management and scrapping on impermeable surface with effective drainage systems. Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: AF can also receive semi-submersible rigs and platforms See national permit No 2005.0038.T Explicit approval 20000 28 January 2024 Indoor facility on a slipway. Major dismantling operations must be performed indoors. Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: See national permit No 2018.0833.T Permit sets limits on work that can be performed outside in order to fit ships inside indoor facility. Explicit approval 0 28 January 2024 Wet berth and slipway. Large vessels will be partly decommissioned on quay until the hull can be brought up the slipway. All further decommissioning work on concrete pads with drainage to a water treatment facility. Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: Kvaerner can also receive topsides and jacket structures and semi-submersible installations See national permit No 2013.0111.T Explicit approval 60000 28 January 2024 Dismantling along the quayside, lifted onshore for scrapping on impermeable surface with drainage and treatment systems. Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Any ship within the dimensions authorized within the permit. Lutelandet can also receive topsides and jacket structures and semi-submersible installations See national permit No 2014.0646.T Explicit approval 7000 28 January 2024 Floating slipway. Optional depending on complexity, in addition: Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: See national permit No 2017.0864.T Explicit approval 4500 1 March 2024 PORTUGAL Drydock dismantling, decontamination and dismantling on a horizontal plane and inclined plane, according to the ship's size Nominal capacity of the horizontal plane: 700 tonnes Conditions applied to the activity are defined in specifications annexed to Title AL n.o 5/2015/CCDRC, of 26 January 2016 Explicit approval 1900 26 January 2020 FINLAND Alongside, drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: The limitations are included in the national environmental permit. Explicit approval 20000 1 October 2023 UNITED KINGDOM Ship dismantling and associated treatment authorised with dry dock and wet berth Any ship within the dimensions authorised within the permit. Maximum ship dimensions: The facility has a Ship Recycling Facility Plan that meets the requirements of Regulation (EU) No 1257/2013. The site is authorised by way of a permit (Reference EPR/VP3296ZM) that limits the operations and places conditions on the operator of the facility. Explicit approval 66340 6 October 2020 Ship dismantling and associated treatment authorised within a drydock, and wet berth Any ship up to a maximum of 7000 tonnes Maximum ship dimensions: The facility has a Ship Recycling Facility Plan that meets the requirements of Regulation (EU) No 1257/2013. The site is authorised by way of a licence (Ref: WML L 1157331) that limits the operations and places conditions on the operator of the facility. Explicit approval 7275 2 November 2022 Ship dismantling and associated treatment authorised with dry dock, and wet berth Any ship with the dimensions detailed in the agreed Working Plan. Maximum ship dimensions: The facility has a Ship Recycling Facility Plan that meets the requirements of Regulation (EU) No 1257/2013. The site is authorised by way of a waste management licence, authorisation number LN/07/21/V2 that limits the operations and places conditions on the operator of the facility. Explicit approval 13200 3 August 2020 Ship dismantling and associated treatment authorised with dry dock, and wet berth Any ship within the dimensions authorised within the permit. Maximum ship dimensions: Site has a Ship Recycling Facility Plan that meets with the requirements of Regulation (EU) No 1257/2013. The site is authorised by way of a permit (Reference EPR/UP3298VL) that limits the operations and places conditions on the operator of the facility. Explicit approval 7275 2 July 2020
NV Galloo Recycling Ghent
Scheepszatestraat 9 9000 Gent Belgium Phone: +32(0)9/251 25 21 Email: peter.wyntin@galloo.com
Length: 265 meters
Width: 37 meters
Draught: 12,5 meters
FAYARD A/S
Kystvejen 100 DK-5330 Munkebo Denmark www.fayard.dk Phone: +45 7592 0000 Email: fayard@fayard.dk
Length: 415 meters
Width: 90 meters
Draught: 7,8 meters
Fornæs ApS
Rolshøjvej 12-16 8500 Grenaa Denmark www.fornaes.dk Phone: +45 86326393 Email: recycling@fornaes.dk
Length: 150 meters
Width: 25 meters
Draught: 6 meters
GT: 10000
Modern American Recycling Services Europe (M.A.R.S)
Sandholm 60 9900 Frederikshavn Denmark Website: http://www.modernamericanrecyclingservices.com/ Email: kim@mars-eu.dk
Length: 290 meters
Width: 90 meters
Draught: 14 meters
Smedegaarden A/S
Vikingkaj 5 6700 Esbjerg Denmark www.smedegaarden.net
Length: 170 meters
Width: 40 meters
Draught: 7,5 meters
Stena Recycling A/S
Grusvej 6 6700 Esbjerg DENMARK Phone: +45 20699190 Website: https://www.stenarecycling.dk/ Email: jakob.kristensen@stenarecycling.com
Length: 40 meters Width: 40 meters Draught: 10 meters
BLRT Refonda Baltic OÜ
Kopli 103, 11712 Tallinn, Estonia Phone: +372 610 2933 Fax +372 610 2444 Email: refonda@blrt.ee www.refonda.ee
Length: 197 meters
Width: 32 meters
Draught: 9,6 meters
GT: 28000
DDR VESSELS XXI, S.L.
Port of El Musel Gijon Spain Phone: +34 630 14 44 16 Email: abarredo@ddr-vessels.com
Length: 169,9 meters (Ships above that size which can operate a zero rollover or negative ramp movement may be accepted depending on the outcome of a detailed feasibility study)
Démonaval Recycling
ZI du Malaquis Rue François Arago 76580 LE TRAIT Phone: (+ 33) (0)7 69 79 12 80 Email: patrick@demonaval-recycling.fr
Length: 140 meters
Width: 25 meters
Depth: 5 meters
GARDET & DE BEZENAC Recycling/Groupe BAUDELET ENVIRONNEMENT – GIE MUG
616, Boulevard Jules Durand 76600 Le Havre France Phone: +33(0)2 35 95 16 34 Email: infos@gardet-bezenac.com
Length: 150 meters
Width: 18 meters
LDT: 7000
Grand Port Maritime de Bordeaux
152, Quai de Bacalan — CS 41320 - 33082 Bordeaux Cedex France Phone: +33(0)5 56 90 58 00 Email: maintenance@bordeaux-port.fr
Length: 240 meters
Width: 37 meters
Depth: 17 meters
Les Recycleurs bretons
Zone Industrielle de Kerbriant - 29 610 Plouigneau France Phone: +33(0)2 98 01 11 06 Email: navaleo@navaleo.fr
Length: 225 meters
Width: 34 meters
Depth: 27 meters
San Giorgio del Porto S.p.A.
Calata Boccardo 8 16128 – Genova – Italy Phone:+39 (0)10 251561 Email: segreteria@sgdp.it; sangiorgiodelporto@legalmail.it www.sgdp.it
Length: 350 meters
Width: 75 meters
Immersion: 16 meters
GT: 130000
A/S Tosmares kuģubūvētava
Ģenerāļa Baloža street 42/44, Liepaja, LV-3402 Latvia Phone: +371 63401919 Email: shipyard@tosmare.lv
Length: 165 m
Width: 22 m
Depth: 7 m
DWT: 14000
GT: 200 - 12000
Weight: 100 – 5000 tonnes
LDT: 100 -5000
UAB APK
Minijos 180 (berth 133A), LT 93269, Klaipėda, Lithuania Phone: +370 (46) 365776 Fax +370 (46) 365776 Email: uab.apk@gmail.com
Length: 130 meters
Width: 35 meters
Depth: 10 meters
GT: 3500
UAB Armar
Minijos 180 (berths 127A, 131A), LT 93269, Klaipėda, Lithuania Phone: +370 685 32607 Email: armar.uab@gmail.com; albatrosas33@gmail.com
Length: 80 meters
Width: 16 meters
Depth: 6 meters
GT: 1500
Length: 80 meters
Width: 16 meters
Depth: 5 meters
GT: 1500
UAB Vakaru refonda
Minijos 180 (berths 129, 130, 131A, 131, 132, 133A), LT 93269, Klaipėda, Lithuania Phone: +370 (46) 483940/483891 Fax +370 (46) 483891 Email: refonda@wsy.lt
Length: 230 meters
Width: 55 meters
Depth: 14 meters
GT: 70000
Keppel-Verolme
Prof. Gerbrandyweg 25 3197 KK Rotterdam-Botlek The Netherlands Phone: +31 18 123 43 53 Email: mzoethout@keppelverolme.nl
Length: 405 meters
Width: 90 meters
Depth: 11,6 meters
Scheepssloperij Nederland B.V.
Havenweg 1; 3295 XZ s-Gravendeel Postbus 5234; 3295 ZJ s-Gravendeel The Netherlands Phone: +31 78 673 60 55 Email: info@sloperij-nederland.nl
Length: 200 meters
Width: 33 meters
Depth: 6 meters
Height: 45 meters (Botlekbridge)
AF Offshore Decom
Raunesvegen 597, 5578 Nedre Vats Norway https://afgruppen.no/selskaper/af-offshore-decom/
Length: 290 meters
Depth: 23 meters
Green Yard AS
Angholmen, 4485 Feda, Norway www.greenyard.no
Width: 25 m
Length: No limit
Kvaerner AS (Stord)
Eldøyane 59, 5411 Stord, Norway www.kvaerner.com
Length: 230 m
Width: No limit
Lutelandet Industrihamn
Lutelandet Offshore AS 6964 Korssund, Norway www.lutelandetoffshore.com
Norscrap West AS
Hanøytangen 122, 5310 Hauglandhella, Norway www.norscrap.no
1. Dismantling by quay and subsequent scrapping on impermeable floors with effective draining system
2. Drydock
Length: 150 m
Width: 34 m
LDT: 8000 tons floating slipway. Increasing based upon methods of recycling.
Navalria — Docas, Construções e Reparações Navais
Porto Comercial, Terminal Sul, Apartado 39, 3811-901 Aveiro Portugal Phone: +351 234 378 970, +351 232 767 700 Email: info@navalria.pt
Nominal capacity of the inclined plane: 900 tonnes
Turun Korjaustelakka Oy (Turku Repair Yard Ltd)
Navirentie, 21110 Naantali Finland Phone: +358 2 44 511 Email try@turkurepairyard.com
Length: 250 meters
Width: 40 meters
Draught: 7,9 meters
Able UK Limited
Teesside Environmental Reclamation and Recycling Centre Graythorp Dock Tees Road Hartlepool Cleveland TS25 2DB United Kingdom Phone: +44(0)1642 806080 Email: info@ableuk.com
Length: 337.5 meters
Beam: 120 meters
Draft: 6,65 meters
Dales Marine Services Ltd
Imperial Dry Dock Leith Edinburgh EH6 7DR Contact: Phone: +44(0)131 454 3380 Email: leithadmin@dalesmarine.co.uk; b.robertson@dalesmarine.co.uk
Length: 165 meters
Beam: 21 meters
Draft: 7,7 meters
Harland and Wolff Heavy Industries Limited
Queen's Island Belfast BT3 9DU United Kingdom Phone: +44(0)2890 458456 Email: trevor.hutchinson@harland-wolff.com
The main dock (the largest) is 556 m × 93 m × 1,2 m DWT, and can take vessels up to this size. This largest dry dock is 1,2 million DWT.
Swansea Drydock Ltd
Prince of Wales Dry Dock Swansea Wales SA1 1LY United Kingdom Phone: +44(0)1792 654592 Email: info@swanseadrydocks.com
Length: 200 meters
Beam: 27 meters
Draft: 7 meters
PART B Ship recycling facilities located in a third country
Name of the facility Method of recycling Type and size of ships that can be recycled Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authority Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facility Date of expiry of inclusion in the European List TURKEY Landing method Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates. Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. Tacit approval The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. 91851 7 July 2024 Landing method Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates. Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. Tacit approval The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. 55495 9 December 2023 Landing method Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates. Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. Tacit approval The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. 50350 9 December 2023 UNITED STATES OF AMERICA Alongside (wet berth), slope Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions: The conditions under which the facility is authorised to operate are defined in permits, certificates and authorisations issued to the facility by the Environmental Protection Agency, the Texas Commission of Environmental Quality, the Texas General Land Office and the U.S Coast Guard. The U.S. Toxic Substances Control Act prohibits the import into the US of foreign flagged vessels that contain PCB concentrations greater than 50 parts per million. The facility has two slips with ramps for final vessel recycling (East Slip and West Slip). Ships flying a flag of EU Member States shall be recycled exclusively on the East Slip ramp. There is currently no procedure in US law related to the approval of ship recycling plans 120000 9 December 2023
Isiksan Gemi Sokum Pazarlama Ve Tic. Ltd Sti.
Gemi Söküm Tesisleri Parcel 22 Aliağa İzmir 35800 Turkey Phone: +90 232 618 21 65 Email: info@isiksangemi.com
Length: no limit
Width: 75 meters
Draught: 17 meters
LEYAL GEMİ SÖKÜM SANAYİ ve TİCARET LTD.
Gemi Söküm Tesisleri, Parcel 3-4 Aliaga, Izmir 35800, Turkey Phone: +90 232 618 2030 Email: info@leyal.com.tr
Length: no limit
Width: 100 meters
Draught: 15 meters
LEYAL-DEMTAŞ GEMİ SÖKÜM SANAYİ ve TİCARET A.Ş.
Gemi Söküm Tesisleri, Parcel 25 Aliaga, Izmir 35800, Turkey Phone: +90 232 618 2065 Email: demtas@leyal.com.tr
Length: no limit
Width: 63 meters
Draught: 15 meters
International Shipbreaking Limited L.L.C
18601 R.L Ostos Road Brownsville TX, 78521 United States Phone: 956-831-2299 Email: chris.green@internationalshipbreaking.com robert.berry@internationalshipbreaking.com
Length: 335 meters
Width: 48 meters
Draught: 9 meters