Gelex

Commission Regulation (EU, Euratom) No 833/2010 of 21 September 2010 implementing Council Regulation (EU, Euratom) No 617/2010 concerning the notification to the Commission of investment projects in energy infrastructure within the European Union

In forceVersion 2010-09-21from 2010-10-12
Grade B

mapped from publisher markup. A grade says how a document's structure was obtained, not how reliable the law is.

Ask Gelex about this law

Address https://gelex.eu/eli/EU/regulation/2010/833@2010-09-21/en

Contents
  1. Preamble
    1. Article 1
    2. Article 2
    3. Article 3
  2. ANNEX
  3. ANNEX

THE EUROPEAN COMMISSION,

Having regard to the Treaty on the Functioning of the European Union,

Having regard to the Treaty establishing the European Atomic Energy Community,

Having regard to the Council Regulation (EU, Euratom) No 617/2010 of 24 June 2010 concerning the notification to the Commission of investment projects in energy infrastructure within the European Union and repealing Regulation (EC) No 736/96, and in particular Article 7 thereof,

Whereas:

(1) The Commission is required to adopt the provisions concerning the form and other technical details of the notification of data and information referred to in Articles 3 and 5 of Regulation (EU, Euratom) No 617/2010.

(2) In order to gather comparable data and to simplify the reporting by Member States or their delegated entities or bodies referred to in Article 3 of Regulation (EU, Euratom) No 617/2010, notifications to be made should be standardized by the use of reporting tables.

(3) Following the repeal of Council Regulation (EC) No 736/96, Commission Regulation (EC) No 2386/96 should also be repealed,

HAS ADOPTED THIS REGULATION:

Article 1

The form and technical details of the notification to the Commission of data and information on investment projects in energy infrastructure referred to in Articles 3 and 5 of Regulation (EU, Euratom) No 617/2010 shall be as set out in the Annex to this Regulation.

Article 2

Regulation (EC) No 2386/96 is repealed.

Article 3

This Regulation shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.

This Regulation shall be binding in its entirety and directly applicable in all Member States. Done at Brussels, 21 September 2010. For the Commission The President José Manuel Barroso

ANNEX

ANNEX

O1 - OIL REFINING Reporting year 20XX in thousand tonnes per year Member State Type of infrastructure Annex point 1.1 Existing infrastructure Art. 5 (3) Infrastructure under construction Art. 1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) Art. 1(2) + 2(3)+ 4 + 5 (1) a) Additions to be commissioned (under construction + FID) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Non-operational [> 3 Y] Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Capacity Capacity Number Capacity Number Capacity Number Capacity Capacity Number Capacity Capacity Distillation (1) Astmospheric distillation with CCS/CCS ready Vacuum distillation with CCS/CCS ready Cracking (2) Craking (Thermal) Visbreaking and/or thermal Coking Other with CCS or capture ready Cracking (catalytic) Fluid catalytic cracking Hydrocracking Other with CCS or capture ready Reforming (2) (Naphta and isomerisation) in thousand tonnes per year Member State Type of infrastructure Annex point 1.1 Existing infrastructure Art. 5 (3) Infrastructure under construction Art. 1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (under construction + FID) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Non-operational [> 3 Y] Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Capacity Capacity Number Capacity Number Capacity Number Capacity Capacity Number Capacity Capacity with CCS or capture ready Desulphurisation (gasoil, HFO, other) with CCS or capture ready Alkylation Polymerisation Isomerisation (C4) with CCS or capture ready Etherification (MTBE, TAME, ETBE) Other with CCS or capture ready Supplementary Info Art. 5 (3) Indication of e.g. reasons for investment, delays, problems for new infrastructure NB: under construction and FID (Final Investment Decision) include renovation. (1) Installations of a capacity ≥ 1 Mio tonnes/y. (2) Installations with a minimum capacity of 500 t/day. O2 - OIL TRANSPORT Reporting year 20XX Member State Type of infrastructure Annex point 1.2 Existing infrastructure Art. 5 (3) Infrastructure under construction Art. 1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (under construction + FID) Art. 1(2) + 5 (1) c) Installations to be decommissioned Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Length (km) Number Length (km) Number Length (km) Number Length (km) Length (km) Number Length (km) Length (km) Crude oil transport pipelines (1) Petroleum product pipelines (2) Supplementary Info Art. 5 (3) Indication of e.g. reasons for investment, delays, problems for new infrastructure NB: under construction and FID (Final Investment Decision) include renovation. (1) With a capacity ≥ 3 Mio Metric tonnes/year for New pipelines + extension/lengthening ≥ 30 km. (2) With a capacity ≥ 1,5 Mio Metric tonnes/year for New pipelines + extension/lengthening ≥ 30 km. O3 - OIL CROSS-BORDER TRANSPORT Reporting year 20XX Member State Transport capacity (Metric Tonnes per day) Cross-border transmission projects and essential links in interconnecting national or international newtorks Annex point 1.2 Existing infrastructure Art. 5 (3) Infrastructure under construction Art. 1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (under construction + FID) Art. 2(3) + 5 (1) c) Infrastructure to be decommissioned (FID) Art. 1(2) + 2(5) + 5 (2) TEN-E projects Supplementary info Art. 5(3) Position at 1/1/Y Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Ref. TO (1) FROM (2) TO (1) FROM (2) TO (1) FROM (2) TO (1) FROM (2) TO (1) FROM (2) TO (1) FROM (2) TO (1) FROM (2) Crude oil pipelines Annex point 1.2 Cross - border/interconnecting point no 1 (location - indicate MS/Third countries) Petroleum products pipelines Annex point 1.2 Cross - border/interconnecting point no 1 (location - indicate MS/Third countries) NB: under construction and FID (Final Investment Decision) include renovation. (1) To the reporting MS. (2) From the reporting MS. O4 - OIL STORAGE Reporting year 20XX Member State Type of infrastrucutre Annex point 1.3 Existing infrastructure Art. 5 (3) Infrastructure under construction Art. 1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) (1) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (Under construction + FID) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned (1) Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Non-operational [> 3 Y] Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Storage capacity (m3) Storage capacity (m3) Number Storage capacity (m3) Number Storage capacity (m3) Number Storage capacity (m3) Storage capacity (m3) Number Storage capacity (m3) Storage capacity (m3) Crude oil Annex 1.3 Storage installations Tanks Petroleum products Annex 1.3 Storage installations Tanks Supplementary info Article 5(3) Indication of e.g. reasons for the investment, problemns, delays for new infrastructure NB: under construction and FID (Final Investment Decision) include renovation. (1) Installations of a capacity ≥ 150 000 m3 and tanks with a capacity ≥ 100 000 m. G1 - GAS TRANSMISSION Reporting year 20XX Member State Type of infrastructure (1) Annex point 2.1 Existing infrastructure Art. 5(3) Infrastructure under construction Art. 1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (under construction + FID) Art. 1(2) + 5 (1) c) Iinfrastructure to be decommissioned Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Length (km) Number Length (km) Number Length (km) Number Length (km) Length (km) Number Length (km) Length (km) Transmission pipelines Annex 2.1 Total power (MW) Number Total power (MW) Number Total power (MW) Number Total power (MW) Total power (MW) Number Total power (MW) Total power (MW) Compressor substations (2) Annex 2.1 Supplementary Info Art. 5 (3) Indication of general comments, including e.g. the case of existing installations non operational for a period of more than 3 years NB: under construction and FID (Final Investment Decision) include renovation. (1) See definition in Annex 2.1 of the Council regulation: Transport pipelines that form part of a network which mainly contains high-pressure pipelines excluding pipelines that form part of an upstream pipeline network and excluding the part of high pressure pipelines primarily used in the context of local distribution of natural gas. (2) Connected to transmission pipelines. G2 - GAS CROSS-BORDER TRANSMISSION Reporting year 20XX Member State Maximum Technical transmission capacity (Nm3/d) Cross-border transmission infrastructure Annex point 2.1 Existing infrastructure Art. 5 (3) Infrastructure Under Construction Art. 1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (under construction + FID) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned Art. 1(2) + 2(5) + 5 (2) TEN-E projects Annex 2.1 Supplementary info (1) Art. 5(3) Position at 1/1/Y Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Ref. TO (2) FROM (3) TO FROM TO FROM TO FROM TO FROM TO FROM TO FROM Cross - border point no 1 (location - indicate MS/Third countries) Cross - border point no 1 (location - indicate MS/Third countries) NB: under construction and FID (Final Investment Decision) include renovation. (1) Indication of e.g. of delays, problems for new infrastructure or of the reasons of the increase in technical transmission capacity at a cross-border point in the absence of investment projects in new pipelines. (2) To the reporting MS. (3) From the reporting MS. G3 - LNG TERMINALS Reporting year 20XX Member State Type of infrastructure Annex point 2.2 Existing infrastructure Art. 5 (3) Infrastructure under construction (1) Art. 1(2)+ 2(4) + 4+ 5 (1) a) Planned infrastructure (1) (FID) Art. 1(2)+ 2(3)+ 4+ 5 (1) a) Additions to be commissioned (1) (under construction + FID) Art. 1(2)+ 5 (1) c) Infrastructure to be decommissioned (1) Art. 1(2)+ 2(5) + 5 (2) TEN - E project Annex 2.1 Position at 1/1/Y Non-operational [>3 Y] Position at 31/3/Y Position at 31/3/Y Y+ [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Number Art. 5(1) b) Max. regasification capacity [bcm(N)/y] - Art. 5(1) b) Max storage capacity [cm] Art. 5(1) b) Supplementary Info Art. 5 (3) Indication of e.g. reasons for the investment, problems, delays for new infrastructure NB: under construction and FID (Final Investment Decision) include renovation (1) Terminals for the importation of liquefied natural gas, with a regasification capacity of 1 bcm per year or more (Annex 2.2) G4 - GAS STORAGE Reporting year 20XX Member State Type of infrastructure Annex point 2.3 Existing infrastructure Art. 5(3) Infrastructure under construction (1) Art. 1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (1) (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (1) (under construction + FID) Art. 1(2) + 5 (1) c) Iinfrastructure to be decommissioned Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Non-operational [> 3 Y] Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Aquifer storage Number Total storage capacity [bcm] Working gas Capacity [bcm] Deliverability - Max. withdrawal capacity [mcm/d] Injectability Max.injection capacity [mcm/d] Salt cavity Number Total storage capacity [bcm] Working gas Capacity [bcm] Deliverability - Max. withdrawal capacity [mcm/d] Injectability Max.injection capacity [mcm/d] Depleted field Number Member State Type of infrastructure Annex point 2.3 Existing infrastructure Art. 5 (3) Infrastructure under construction (1) Art. 1(2) + 2(4) + 4 + 5 (1) a) + Art. 4 Planned infrastructure (1) (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (1) (Under construction + FID) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Non-operational [> 3 Y] Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Total storage capacity [bcm] Working gas Capacity [bcm] Deliverability - Max. withdrawal capacity [mcm/d] Injectability Max.injection capacity [mcm/d] Aboveground storage (2) Number Total storage capacity [bcm] Working gas Capacity [bcm] Deliverability - Max. withdrawal capacity [mcm/d] Injectability Max.injection capacity [mcm/d] Supplementary Info Art. 5 (3) Indication of e.g. reasons for the investment, problems, delays for new infrastructure NB: under construction and FID (Final Investment Decision) include renovation. (1) Installations connected to the transport pipelines. (2) Does not include storage capacity of LNG terminals (see separate LNG tables). E1 - ELECTRICITY PRODUCTION Reporting year 20XX Member State Type of infrastructure Annex point 3.1 Existing infrastructure Art. 5 (3) Infrastructure under construction Art. 1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (under construction + FID) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Non-operational [> 3 Y] Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Capacity (1) (MW) Capacity (1) (MW) Number Capacity (1) (MW) Number Capacity (1) (MW) Number Capacity (1) (MW) Capacity (1) (MW) Number Capacity (1) (MW) Capacity (1) (MW) Conventional thermal power stations (≥ 100 MW) capable of burning Annex point 3.1 + Art. 5(1) d) Coal and lignite with CCS/CCS ready Oil with CCS/CCS ready Gas with CCS/CCS ready Two or more energy sources (2) …/… (1) with CCS or capture ready Others Nuclear Power Stations (≥ 100 MW) of type Annex point 3.1 + Art. 5(1) b) Pressurized Water Reactor Boiling Water Reactor Graphit Gas Reactor Fast Breeder Reactor Others Member State Type of infrastructure Annex point 3.1 Existing infrastructure Art. 5 (3) Infrastructure under construction Art. 1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (under construction + FID) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Non-operational [> 3 Y] Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Capacity (1) (MW) Capacity (1) (MW) Number Capacity (1) (MW) Number Capacity (1) (MW) Number Capacity (1) (MW) Capacity (1) (MW) Number Capacity (1) (MW) Capacity (1) (MW) Biomass/bioliquids/waste power generation installations (≥ 20 MW) capable of burning Annex point 3.1 + Art. 5(1) d) Biomass Waste Bioliquids Power stations with cogeneration of electricity and useful heat (electrical capacity ≥ 20 MW) capable of burning Coal and lignite with CCS/CCS ready Oil with CCS/CCS ready Gas with CCS/CCS ready Biomass Waste Two or more energy sources (2) …/… with CCS/CCS ready Hydro-electric power stations (≥ 30 MW) of the type Annex point 3.1 + Art. 5(1) b) Seasonal stockage (S) Short-term stockage (ST) Member State Type of infrastructure Annex point 3.1 Existing infrastructure Art. 5 (3) Infrastructure under construction Art. 1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (under construction + FID) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Non-operational [> 3 Y] Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Capacity (1) (MW) Capacity (1) (MW) Number Capacity (1) (MW) Number Capacity (1) (MW) Number Capacity (1) (MW) Capacity (1) (MW) Number Capacity (1) (MW) Capacity (1) (MW) Run-of River (R) Pumped storage only (P) Mixed pumped and others Wind power farms (≥ 20 MW) of the type Annex point 3.1 + Art. 5(1) b) On-shore Off-shore Concentrated solar thermal and geothermal installations (≥ 20 MW) Annex point 3.1 Concentrated solar thermal Geothermal Photovoltaic installations (≥ 10 MW) Annex point 3.1 Supplementary Info Art. 5 (3) Indication of e.g. reasons for the investment, problems, delays for new infrastructure NB: under construction and FID (Final Investment Decision) include renovation. (1) Nominal capacity. (2) For installations capable of burning more than one fuel, please indicate the power at total level and for each fuel separately. E2 - ELECTRICITY TRANSMISSION Reporting year 20XX Member State Type of infrastructure Annex point 3.2 Existing infrastructure Art. 5 (3) Infrastructure under Construction Art. 1(2)+ 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (Under construction + FID) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Position at 31/3/Y Position at 31/3/Y Y+ [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Length (km) Number Length (km) Number Length (km) Number Length (km) Length (km) Number Length (km) Length (km) Overhead lines (≥220 kv minimum) designed for the voltage commonly used at national level for interconnections lines (select the range) Annex 3.2 AC [220-299 kV] [300-359 kV] [360-499 kV] [x]* DC 300-499 MW 500-699 MW 700-999 MW 1 000-1 199 MW other Underground lines (≥ 150 kV) AC [150-199 kV] [220-299 kV] [300-359 kV] [360-499 kV] other Member State Type of infrastructure Annex point 3.2 Existing infrastructure Art. 5(3) Infrastructure under Construction Art. 1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (Under construction + FID) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Length (km) Number Length (km) Number Length (km) Number Length (km) Length (km) Number Length (km) Length (km) DC 300-499 MW 500-699 MW 700-999 MW 1 000-1 199 MW other Submarine lines (≥ 150 kV) AC [150-199 kV] [220-299 kV] [300-359 kV] [380-499 kV] other DC 300-499 MW 500-699 MW 700-999 MW 1 000-1 199 MW 1 200-1 599 MW other Supplementary Info Art. 5 (3) Indication of e.g. the case of existing infrastructure non operational for a period of time exceeding 3 years NB: under construction and FID ((Final Investment Decision) include renovation. (1) Fill in in cases two voltage systems coexist within a single Member States. E3 - ELECTRICITY CROSS-BORDER TRANSMISSION Reporting year 20XX Member State Type of infrastructure Annex point 3.2 Existing infrastructure Art. 5 (3) Infrastructure under construction Art. 1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (under construction + FID) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned Art. 1(2) + 2(5) + 5 (2) TEN-E project Annex 3. Supplementary info Art. 5(3) Position at 1/1/Y Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Characteristics of section in the reporting Member State (MS) Voltage (kV) Transmission capacities (MVA - AC MW - DC) Length (km) Voltage (kV) Transmission capacities (MVA - AC MW - DC) Length (km) Voltage (kV) Transmission capacities (MVA - AC MW - DC) [Yes/No] [Yes/No] [Yes/No] [Yes/No] Ref. Overhead lines AC Border (MS A - MS/Country B) Substation 1 (A)-Substation 1 (B) no 1 DC Border (MS A - MS/Country B) Substation 1 (A)-Substation 1 (B) no 1 Underground lines AC Border (MS A - MS/Country B) Substation 1 (A)-Substation 1 (B) no 1 DC Member State Type of infrastructure Annex point 3.2 Existing infrastructure Art. 5 (3) Infrastructure under construction Art. 1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (under construction + FID) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned Art. 1(2) + 2(5) + 5 (2) TEN-E project Annex 3. Supplementary info Art. 5 (3) Position at 1/1/Y Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Characteristics of section in the reporting Member State (MS) Voltage (kV) Transmission capacities (MVA - AC MW - DC) Length (km) Voltage (kV) Transmission capacities (MVA - AC MW - DC) Length (km) Voltage (kV) Transmission capacities (MVA - AC MW - DC) [Yes/No] [Yes/No] [Yes/No] [Yes/No] Ref. Border (MS A - MS/Country B) Substation 1 (A)-Substation 1 (B) no 1 Submarine lines AC Border (MS A - MS/Country B) Substation 1 (A)-Substation 1 (B) no 1 DC Border (MS A - MS/Country B) Substation 1 (A)-Substation 1 (B) no 1 NB: Under construction and FID (Final Investment Decision) include renovation. B1 - BIOFUEL PRODUCTION Reporting year 20XX Member State Type of infrastructure Annex point 4 Existing infrastructure Art. 5 (3) Infrastructure under construction (1) Art. 1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (1) (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (1) (under construction + FID) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned (1) Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Non-operational [> 3 Y] Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Annual capacity (kt) Annual capacity (kt) Number Annual capacity (kt) Number Annual capacity (kt) Number Annual capacity (kt) Annual capacity (kt) Number Annual capacity (kt) Annual capacity (kt) Installations - Unprocessed refined oil (Pure Plant Oil) Installations - Biofuel from oil crops FAME (Fatty Acid Methyl Ester) and FAEE (Fatty Acid Ethyl Ester) Oils (Hydrotreated and Refinery Co-Processed Oils) Other Installations - Biofuel from sugar and starch crops Ethanol ETBE Other Installations - Biofuel from lignocellulosics Ethanol Synthetic Biofuel (2) Others Methane installations from biogas Supplementary Info Art. 5 (3) Indication of e.g. reasons for the investment, problems, delays for new infrastructure NB: under construction and FID (Final Investment Decision) include renovation. (1) Installations of a capacity ≥ 50 kt/year. (2) Fischer-Tropsh, DME, ethanol, methanol, methane, pyrolysis oil etc. C1 - CO2 TRANSPORT Reporting year 20XX Member State Type of infrastructure Annex point 5.1 Existing infrastructure Art. 5 (3) Infrastructure under construction (1) Art.1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) (1) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (under construction + FID) (1) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned (1) Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Length (km) Number Length (km) Number Length (km) Number Length (km) Length (km) Number Length (km) Length (km) Dry CO2 transport pipeline Liquid CO2 transport pipeline Total power (MW) Number Total power (MW) Number Total power (MW) Number Total power (MW) Total power (MW) Number Total power (MW) Total power (MW) Compressor stations Supplementary Info Art. 5 (3) Indication of e.g. reasons for the investment, problems, delays for new infrastructure NB: under construction and FID (Final Investment Decision) include renovation. (1) Pipelines related to power generation plants and refining installations. C2 - CO2 STORAGE Reporting year 20XX Member State Type of infrastructure Annex point 5.2 Existing infrastructure Art. 5(3) Infrastructure under construction (1) Art. 1(2) + 2(4) + 4 + 5 (1) a) Planned infrastructure (1) (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (Under construction + FID) (1) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned (1) Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Non-operational [> 3 Y] Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Aquifer storage Number Total storage capacity [kt] Injectability Max.injection capacity [t/d] Depleted field Number Total storage capacity [kt] Injectability Max.injection capacity [t/d] Other Supplementary Info Art. 5 (3) Indication of e.g. reasons for the investment, problems, delays for new infrastructure NB: under construction and FID (Final Investment Decision) include renovation. (1) Installations with a capacity ≥ 100 kt.

Versions

  1. 2010-09-21