Commission Delegated Regulation (EU) 2017/2016 of 29 August 2017 amending Commission Delegated Regulation (EU) 2015/2195 on supplementing Regulation (EU) No 1304/2013 of the European Parliament and of the Council on the European Social Fund, regarding the definition of standard scales of unit costs and lump sums for reimbursement of expenditure by the Commission to Member States
Grade B
mapped from publisher markup. A grade says how a document's structure was obtained, not how reliable the law is.
Address https://gelex.eu/eli/EU/regulation/2017/2016@2017-08-29/en
Contents
- Preamble
- ANNEX
- ANNEX I
- ANNEX 1 Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Sweden
- ANNEX III Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to the Czech Republic
- 1.1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.19.20.21.22.23.24.25.26.27.
- 1.1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.
- ANNEX V Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Malta
- 1.1.
- ANNEX VI Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Italy
- 1.1.2.3.A.B.4.5.6.7.8.9.10.11.12.13.14.15.16.
- 1.1.2.3.A.B.4.5.6.7.8.9. A.
- 2.
- ANNEX VII Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Slovakia
- 1.1.2.3.4.5.6.7.
- ANNEX IX Conditions for reimbursement of expenditure on the basis of unit costs and lump sums to the Netherlands
- ANNEX II
- ANNEX X Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Austria
- ANNEX XI Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Lithuania
- ANNEX XII Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Poland
- ANNEX XIII Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Romania
- ANNEX XIV Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to all Member States specified.
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 1304/2013 of the European Parliament and of the Council on the European Social Fund and repealing Council Regulation (EC) No 1081/2006, and in particular Article 14(1) thereof,
Whereas:
(1) With a view to simplifying the use of the European Social Fund ESF and reducing the administrative burden for beneficiaries, it is appropriate to increase the scope of standard scales of unit costs and lump sums available for reimbursement to Member States. The standard scales of unit costs and lump sums for reimbursement to Member States should be established on the basis of data submitted by Member States or published by Eurostat and on the basis of methods commonly agreed, including the methods set out in Article 67(5) of Regulation (EU) No 1303/2013 of the European Parliament and of the Council and Articles 14(2) and 14(3) of Regulation (EU) No 1304/2013.
(2) Taking into account the significant disparities between Member States regarding the level of costs for a particular type of operation, the definition and amounts of standard scales of unit costs and lump sums may differ according to the type of operation and the Member State concerned in order to reflect their specificities.
(3) Austria, Lithuania, Poland, and Romania have submitted methods for defining standard scales of unit costs for reimbursement of expenditure by the Commission, while the Netherlands has submitted a method for defining a lump sum.
(4) Further to the submission by the Czech Republic, Malta, Italy, and Slovakia of methods concerning types of operation not yet covered by Delegated Regulation (EU) 2015/2195, additional standard scales of unit costs should be defined for reimbursement of expenditure to these Member States for these types of operation.
(5) The standard scales of unit costs for Sweden currently set out in Delegated Regulation (EU) 2015/2195, with the exception of those relating to participant's allowances, have been amended on the basis of a method submitted by Sweden.
(6) Taking into account the objective of expanding the possibilities for Member States to seek reimbursement from the Commission on the basis of standard scales of unit costs or lump sums, the Commission has defined unit costs and amounts for each Member State on the basis of data published by Eurostat for operations in the area of education.
(7) Regulation (EU) 2015/2195 should therefore be amended accordingly,
HAS ADOPTED THIS REGULATION:
Article 1
Annexes I, III, V, VI, VII and IX to Delegated Regulation (EU) 2015/2195 are replaced by the text in Annex I to this Regulation.
Article 2
The text in Annex II to this Regulation is added as Annexes X to XIV to Delegated Regulation (EU) 2015/2195.
Article 3
This Regulation shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
This Regulation shall be binding in its entirety and directly applicable in all Member States. Done at Brussels, 29 August 2017. For the Commission The President Jean-Claude Juncker
ANNEX
ANNEX I
ANNEX 1 Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Sweden
1.1.2.3.4. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicator Amounts Operations supported under priority axis 1 Supply of skills of the Operational Programme (Nationellt socialfondsprogram för investering för tillväxt och sysselsättning 2014-2020) (CCI- 2014SE05M9OP001) Hours worked All categories of costs except wages for participants. Number of hours worked Wage group (SSYK code) Region: Stockholm (SE 11) (unit cost per hour — amount in SEK) All regions except Stockholm (SE 12-33) (unit cost per hour — amount in SEK) 1 (912 – 913 -919 -921) 321 328 2 (414 – 415 – 421 – 422 -512 – 513 – 514 – 515 – 522 – 611 -612 -613 – 614 -826) 360 356 3 (331 – 348 – 411 – 412 – 413 – 419 – 711 – 712 – 713 – 714 – 721 – 722 – 723 – 724 – 731 – 732 – 734 – 741 – 742 – 743 – 811 – 812 – 813 – 814 – 815 – 816 – 817 – 821 – 822 – 823 -824 – 825 – 827 -828 -829 -831 – 832 – 833 – 834 – 914 – 915 – 931 – 932 – 933) 416 395 4 (223 – 232 – 233 – 234 – 235 – 243 – 249 – 313 – 322 – 323 – 324 – 332 – 342 – 343 – 344 – 345 – 346 – 347 – 511 – 011) 473 438 5 (213 – 221 – 231 – 241 – 244 – 245 – 246 – 247 – 248 – 311 – 312 – 315 – 321 – 341) 587 512 6 (211 – 212 – 214 – 222 – 242 – 314) 776 724 7 A (121) 1035 1035 7 B (111-123) 1121 875 7 C (131-122) 735 601 Operations supported under priority axis 1 Supply of skills of the Operational Programme (Nationellt socialfondsprogram för investering för tillväxt och sysselsättning 2014-2020) (CCI-2014SE05M9OP001) Hours participated in the operation Participant's wage Number of hours participated Region: Stockholm (SE 11) (unit cost per hour — amount in SEK) All regions except Stockholm (SE 12-33) (unit cost per hour — amount in SEK) 229 234 Operations supported under priority axis 2 Increased transition to work and priority axis 3 Youth Employment Initiative of Operational Programme (Nationellt socialfondsprogram för investering för tillväxt och sysselsättning 2014-2020) (CCI-2014SE05M9OP001) Hours worked All categories of costs except allowances for participants. Number of hours worked Occupational category Region: Stockholm (SE 11) (unit cost per hour — amount in SEK) All regions except Stockholm (SE 12-33) (unit cost per hour — amount in SEK) Project leader for operations where the total eligible expenditure as stated in the document setting out the conditions for support is above 20 million in SEK) 535 435 Project leader for operations where the total eligible expenditure as stated in the document setting out the conditions for support is below or equal to 20 million in SEK) / assistant project leader for operations where the total eligible expenditure as stated in the document setting out the conditions for support is above 20 million in SEK) 478 405 Project worker 331 300 Project economist 427 363 Administrator 297 270 Operations supported under priority axis 2 Increased transition to work and priority axis 3 Youth Employment Initiative of Operational Programme (Nationellt socialfondsprogram för investering för tillväxt och sysselsättning 2014-2020) (CCI- 2014SE05M9OP001) Hours participated in the operation Participant's allowance Number of hours participated Financial assistance (unit cost per hour) Age (SEK) 18-24 years 32 25-29 years 40 30-64 years 46 Activity grant and development allowance (unit cost per hour) Age (SEK) 15-19 years 17 20-24 years 33 25-29 years 51 30-44 years 55 45-69 years 68 Social security and sickness benefit (unit cost per hour) Age (SEK) 19-29 years (social security benefit) 51 30-64 years (sickness benefit) 58 Sickness benefit, rehabilitation benefit, and work and professional injury benefit (unit cost per hour) Age (SEK) – 19 years 48 20-64 years 68
2. Adjustment of amounts The unit costs in the table apply to the hours worked or participated in 2015. Except for the unit costs relating to participant's allowances, referred to in point 4 of the table, which will not be adjusted, these values will be increased automatically on the 1st of January each year as from 2016 until 2023 by 2 %.
ANNEX III Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to the Czech Republic
1.1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.19.20.21.22.23.24.25.26.27.
Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicator Amounts (in national currency CZK) Establishment of a new childcare facility under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) Newly created place in a new childcare facility Number of newly created places in a new childcare facility 20053 incl. VAT, or 16992 excl. VAT Transformation of an existing facility to a children's group under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) Transformed place in a children's group Number of transformed places in a children's group 9518 incl. VAT, or 8279 excl. VAT Operating a childcare facility under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) Occupancy per place in a childcare facility Occupancy rate 628 Upskilling of caregivers under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) Achievement of a qualification as caregiver in a childcare facility Number of persons who obtain a certification of professional qualification as caregiver in a childcare facility 14178 Lease of premises for childcare facilities under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) Occupancy per place in a childcare facility Occupancy rate. 56 Further external professional training of employees under Priority Axis 1 of Operational Programme Employment, (2014CZ05M9OP001) One hour (60 minutes) of participation of an employee in an external training course on general information technologies (IT) All eligible costs, including: Number of completed hours per employee. 324 Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) One hour (60 minutes) of participation of an employee in an external training course on soft and managerial skills All eligible costs, including: Number of completed hours per employee. 593 Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) A period (45 minutes) of participation of an employee in external language training courses All eligible costs, including: Number of completed periods per employee 173 Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) One hour (60 minutes) of participation of an employee in a training course in specialised IT All eligible costs, inlcuding: Number of completed hours per employee 609 Further external professional training of employees under Priority Axis 1 of the Operational Programme Employment (2014CZ05M9OP001) One hour (60 minutes) of participation of an employee in an external training course in accountancy, economy and law All eligible costs, including: Number of completed hours per employee 436 Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) One hour (60 minutes) of participation of an employee in external technical and other professional training All eligible costs, including: Number of completed hours per employee 252 Further internal professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) One hour (60 minutes) of participation of an employee in a training course provided by an internal trainer in any of the following areas: All eligible costs, including: Number of completed hours per employee 144 Support provided by non-permanent personnel to school/ educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) 0,1 full-time equivalent (FTE) worked as a school psychologist and/or a specialised school pedagogue per month All eligible costs, including, direct staff costs Number of 0,1 FTE worked per month 5607 Support provided by non-permanent personnel to school/ educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) 0,1 FTE worked by a school assistant and/or social pedagogue per month. All eligible costs, including direct staff costs Number of 0,1 FTE worked per month School assistant: 3502 Social pedagogue: 4695 Support provided by non-permanent personnel to school/ educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) 0,1 FTE worked by a nanny per month All eligible costs, including direct staff costs. Number of 0,1 FTE worked per month 3227 Provision of extracurricular activity for children/pupils at risk of school failure under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Provision of a block of 16 lessons of extracurricular activities with a duration of 90 minutes per lesson provided to a group of at least 6 children/pupils of which 2 are at risk of school failure. All eligible costs, including direct staff costs. Number of completed blocks of 16 lessons with a duration of 90 minutes per lesson provided to a group of at least 6 children/pupils of which 2 are at risk of school failure. 17277 Supporting pupils at the risk of school failure through tutoring under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Provision of a block of 16 hours of tutoring to a group of at least 3 registered pupils at risk of school failure. All eligible costs, including direct staff costs. Number of completed blocks of 16 hours provided to a goup of at least 3 registered pupils at risk of school failure. 8523 Professional development of pedagogues through structured training courses under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Hours of professional training provided to pedagogues. All eligible costs, including direct costs of providing training. Number of completed hours of training per pedagogue Provision of information to parents through meetings under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Thematic meeting with a minimum of eight parents for a minimum duration of two hours (120 minutes). All eligible costs, including direct staff costs. Number of thematic meetings with a minimum of eight parents for a minimum duration of two hours (120 minutes) 3676 Professional development of pedagogues in schools and educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Block of 30 hours of external mentoring/ coaching to a group of between 3 and 8 pedagogues. All eligible costs, including direct staff costs. Number of completed blocks of 30 hours mentoring/coaching to a group of between 3 and 8 pedagogues. 29698 Professional development of pedagogues in schools and educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Training cycle of 15 hours of structured job-shadowing by a pedagogue All eligible costs, including direct staff costs. Number of completed training cycles of 15 hours per pedagogue undertaking a structured visit to another pedagogue in another school. 4246 Professional development of pedagogues in schools and educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Cycle of 10 hours of training through mutual cooperation involving a group of at least 3 pedagogues. All eligible costs, including direct staff costs. Number of completed training cycles of 10 hours involving a group of at least 3 pedagogues. 8068 Professional development of teaching staff of school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Tandem lesson of 2,75 hours. All eligible costs, including direct staff costs.: Number of completed tandem lessons 778 Professional development of pedagogues of school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Cycle of 19 hours of mutual cooperation and learning involving an expert and 2 pedagogues. All eligible costs, including direct staff costs. Number of completed cycles of 19 hours involving an expert and 2 other pedagogues. 5377 Career advice services in schools and cooperation between schools and employers under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) 0,1 FTE worked per month by a career advisor and/or a coordinator of cooperation between a school and employers. All eligible costs, including direct staff costs Number of 0,1 FTE worked per month 4942 Professional development of pedagogues of school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Training cycle of 8,5 hours involving structured job-shadowing by a pedagogue and a mentor. All eligible costs, including direct staff costs Number of completed training cycles of 8,5 hours per structured visit to an institution/company/facility. 2395 Professional competence development of pedagogues under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Cycle of 3,75 hours of training involving a pedagogue and expert/ICT technician. All eligible costs, including direct staff costs Number of completed training cycles of 3,75 hours involving a pedagogue and expert/ICT technician. 1050
purchase of equipment for a childcare facility;
management of project phase focused on creating the facility.
purchase of equipment for a transformed facility;
purchase of teaching aids;
management of project phase focused on transforming the facility
salaries of teaching and non-teaching staff,
operation of the childcare facility,
management of the operation
training and examination for professional qualification
Rent of the premises for a childcare facility
Direct costs of providing training;
Indirect costs;
Wages for participants.
Direct costs of providing training;
Indirect costs;
Wages for participants.
Direct costs of providing training;
Indirect costs;
Wages for participants.
Direct costs of providing training;
Indirect costs;
Wages for participants.
Direct costs of providing training;
Indirect costs;
Wages for participants.
Direct costs of providing training;
Indirect costs;
Wages for participants.
general information technologies (IT);
soft and managerial skills;
languages;
specialised IT;
accountancy, economy and law;
technical and other professional.
Direct staff costs;
Indirect costs;
Wages for participants.
1.1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.
(1) 422 for training inside regular class time
(2) 170 for training outside regular class time
2. Adjustments of amounts. The rate for unit costs 6-11 may be adjusted by replacing the initial minimum wage rate in the calculation method that consists of the minimum wage, the cost for provision of training and indirect costs. The rate for unit cost 12 may be adjusted by replacing the initial direct staff costs, including social security and health contributions, and/or the wages for participants, including social security and health contributions in the calculation method that consists of direct staff costs, including social security and health contributions and/or the wages for participants, including social security and health contributions. The rate for unit costs 13-17 and 19-27 may be adjusted by replacing the initial direct staff costs, including social security and health contributions, in the calculation method that consists of direct staff costs, including social security and health contributions, plus indirect costs. The rate for unit cost 18 may be adjusted by replacing the salaries for participants, including social security and health contributions in the calculation method that consists of the cost for provision of training plus salaries for participants, including social security and health contributions, plus indirect costs. Adjustments will be based on the updated data as follows: For average salaries to determine wages/staff costs, changes to the latest annual published data for relevant categories from the average earnings informational system (www.ISPV.cz).
for the minimum wage, amendments to the minimum wage as set by government decree no. 567/2006 Coll;
for social security contributions, amendments to employers' contributions to social security, defined in Act no. 589/1992 Coll. on social security; and
for health contributions, amendments to employers' contributions to health insurance, defined in Act no. 592/1992 Coll. on premiums for health insurance.
ANNEX V Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Malta
1.1.2.3.4. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Employment Aid (A2E Scheme) under Priority axis 1 of the ESF Operational Programme II Investing in human capital to create more opportunities and promote the wellbeing of society (2014MT05SFOP001) Employment aid paid per week to workers who are disadvantaged, severely disadvantaged or with disabilities. All costs related to the Employment Subsidy. Number of weeks in employment per employee. Training aid (Investing In Skills scheme) to enterprises in the private sector under Priority Axis 3 of the ESF Operational Programme II Investing in human capital to create more opportunities and promote the wellbeing of society (2014MT05SFOP001) Participation in one hour of accredited or non-accredited external training Direct costs of providing external training Number of completed hours per participant 25 Training aid (Investing In Skills scheme) to enterprises in the private sector under Priority Axis 3 of the ESF Operational Programme II Investing in human capital to create more opportunities and promote the wellbeing of society (2014MT05SFOP001) Provision of one hour of accredited or non-accredited internal training. Salary costs for internal trainer. Number of completed hours of training provided per trainer. 4,90 Training aid (Investing In Skills scheme) to enterprises in the private sector under Priority Axis 3 of the ESF Operational Programme II Investing in human capital to create more opportunities and promote the wellbeing of society (2014MT05SFOP001) Participation in one hour of accredited or non-accredited internal or external training. Salary costs for participant. Number of completed hours per participant. 4,90
1.1.
1. Disadvantaged worker – 85 per week for a maximum of 52 weeks.
2. Severely disadvantaged worker – 85 per week for a maximum of 104 weeks.
3. Worker with disabilities – 125 per week for a maximum of 156 weeks.
2. Adjustment of amounts Unit cost 1 may be adjusted by replacing the initial minimum wage and/or the statutory bonus and/or weekly allowances and/or social security contributions in the calculation method that consists of the lowest weekly rate of national minimum wage for a particular year, the statutory bonus, weekly allowances and social security contributions, and dividing this result by 2. Unit Cost 2 may be adjusted by applying the annual rate of inflation to the respective rates. From 2017, for a given year N, this can be be done by applying the inflation rate for year N-1 as published by the Maltese National Statistics Office at: https://nso.gov.mt/en/nso/Selected_Indicators/Retail_Price_Index/Pages/Index-of-Inflation.aspx Unit costs 3-4 may be adjusted by replacing the initial national minimum wage for persons 18 years or over and/or the statutory bonuses and/or weekly allowances and/or social security contributions in the calculation method that consists of the hourly rate of national minimum wage for persons 18 years or over for a particular year, the statutory bonuses, the weekly allowances and social security contributions. Adjustments will be based on updated data as follows:
The national minimum wage is specified in national Subsidiary Legislation 452.71 (National Minimum Wage Standing Order).
The statutory bonuses, weekly allowances and social security contributions provided for in Chapter 452 of the Maltese legislation on the Employment and Industrial relations Act.
ANNEX VI Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Italy
1.1.2.3.A.B.4.5.6.7.8.9.10.11.12.13.14.15.16.
Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Measure 1.B of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: Hourly rate for 1st guidance level support All eligible costs, including direct staff costs. Number of hours providing 1st guidance level support. 34,00 Measure 1.C of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: Hourly rate for specialist or 2nd guidance level support. All eligible costs, including direct staff costs. Number of hours providing specialist or 2nd guidance level support. 35,50 Measures 2.A, 2.B, 4.A, 4.C and 7.1 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: Hourly rate for the following tranings: This hourly rate depends on the type of class (A, B or C) Hourly rate per student participating in the training All eligible costs, including direct staff costs and excluding any allowance paid to participants. Number of hours per training course differentiated by type of class, and the number of hours per student. TYPE OF CLASS HOURLY RATE PER COURSE HOURLY RATE PER STUDENT C 73,13 0,80 B 117,00 A 146,25 Measure 3 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: New employment contracts as a result of job coaching All eligible costs, including direct staff costs Number of new employment contracts, differentiated by type of contract and profile classification (from low to very high) Profile Classification LOW MEDIUM HIGH VERY HIGH Open-ended contract and 1st and 3rd level apprenticeship contract 1500 2000 2500 3000 2nd level apprenticeship, fixed-term and temporary contract ≥ 12 months 1000 1300 1600 2000 fixed-term and temporary contract 6-12 months 600 800 1000 1200 Measure 5 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: New regional/interregional/transnational traineeships All eligible costs including direct staff costs for providing a traineeship. Number of traineeships, differentiated by profile classification. LOW MEDIUM HIGH VERY HIGH REGIONAL / INTERREGIONAL/TRANSNATIONAL 200 300 400 500 Measure 5 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: Traineeships under interregional mobility For interregional mobility: all eligible costs, including travel, accommodation and meals, but excluding participant allowances Number of traineeships, differentiated by location and, for interregional mobility, the length of traineeship. Interregional mobility as per the rates set out in point 3.4 Traineeships under transnational mobility For transnational mobility: all eligible costs. Transnational mobility as per the rates set in point 3.5 Measure 6 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: 30 hour block of general preparatory training for access to the civil service All eligible costs, including direct staff costs, excluding allowances and insurance. Number of participants completing the 30 hour block of training. 90 Measure 7.1 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: Hourly rate of support for self-employment and self-entrepreneurship All eligible costs, including direct staff costs, but excluding any allowance. Number of hours of support provided to participants. 40 Measure 8 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: All eligible costs (one off subsidy for travel, accommodation and meals, and an interview allowance), not including any additional allowances for disadvantaged people and any allowances for travel, accommodation or meals under interregional mobility provided by employer. Number of employment contracts or job interviews, differentiated by location Operations increasing the number of Industrial PhD positions under the following Operational Programmes: Months spent working on PhD. All eligible costs for the participant (salary and associated social security contributions) and the institution providing the PhD (direct and indirect costs). Number of months spent working on PhD, according to location in Italy or abroad. Without a period spent abroad: 1927,63 per month With a period spent abroad: 2891,45 per month Adult training under OP Education 2014IT05M20P001 Participants gaining a certificate in adult training All categories of costs Number of participants gaining a certificate in adult training, differentiated by length of module and additional specific support Activities related to Citizenship and the Rule of Law under OP Education 2014IT05M20P001 Participants gaining a certificate in initiatives related to Citizenship and Rule of Law. All categories of costs Number of participants gaining a certificate related to Citizenship and Rule of Law, differentiated by length of module, additional specific support, and meal allowance. Classroom training under OP Education 2014IT05M20P001 Participants gaining a certificate in classroom training All categories of costs Number of participants gaining a certificate in classroom training, differentiated by length of module, additional specific support and meal allowance. Language training in context of transnational mobility under OP Education 2014IT05M20P001 Participants gaining a certificate in language training following transnational mobility. All categories of costs, except travel and accommodation costs for persons accompanying participants. Number of participants gaining a certificate in language training following transnational mobility, differentiated by length of module, country and length of stay, and distance travelled To these amounts for each participant can be added a daily amount to cover accommodation costs, differentiated by country, as set out in point 3.8 below, and the following amount for travel costs: Km Amount 100-499 500-1999 2000-2999 3000-3999 4000-7999 8000-19999 · · · · · · 180 275 360 530 820 1100 Internships under OP Education 2014IT05M20P001 Participants gaining an internship certificate, with or without transnational mobility. All categories of costs, except travel and accommodation for persons accompanying participants. Number of participants gaining an internship certificate, with or without transnational mobility, differentiated by length of module and, where transnational mobility is included, country, length of stay, and distance travelled For internships with transnational mobility, these amounts for each participant can be supplemented by a daily amount to cover accommodation costs, differentiated by country, as set out in point 3.8 below, and the following amount for travel costs: Km Amount 100-499 500-1999 2000-2999 3000-3999 4000-7999 8000-19999 · · · · · · 180 275 360 530 820 1100 Language training and internships in the context of transnational mobility under OP Education 2014IT05M20P001 Persons accompanying participants. Accommodation and travel costs Number of persons accompanying participants. Accommodation Costs per participant, differentiated by country, as set out in point 3.8 below, and the following amount for travel costs: Km Amount 100-499 500-1999 2000-2999 3000-3999 4000-7999 8000-19999 · · · · · · 180 275 360 530 820 1100
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Lazio 2014IT05SFOP005
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Lazio 2014IT05SFOP005
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Lazio 2014IT05SFOP005
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
Training focused on integration in the labour market;
Reintegration in the schooling and training system for young people aged between 15 and 18;
Apprenticeship for qualification and professional diploma;
Apprenticeship for higher training and research;
Training for self-employment and self-entrepreneurship
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Lazio 2014IT05SFOP005
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Lazio 2014IT05SFOP005
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Umbria 2014IT05SFOP010
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Lazio 2014IT05SFOP005
POR Molise 2014IT16M2OP001
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
1.1.2.3.A.B.4.5.6.7.8.9. A.
Employment contracts following professional interregional mobility or professional transnational mobility;
B.
Job interview under professional transnational mobility
Professional interregional mobility as per the amounts for more than 600 hours set out in point 3.4.
Professional transnational mobility for interview purposes as per the amounts set out in point 3.6.
Professional transnational mobility as per the amounts set out in point 3.7.
PON Ricerca 2014 IT16M20P005
POR Basilicata FSE 2014IT05SFOP016
POR Campania FSE 2014IT05SFOP020
POR Puglia FESR FSE 2014IT16M2OP002
POR Calabria FESR FSE 2014IT16M2OP006
POR Abruzzo FSE 2014IT05SFOP009
POR Sardegna FSE 2014IT05SFOP021
POR Molise FESR FSE 2014IT16M2OP001
POR Friuli Venezia Giulia FSE 2014IT05SFOP004
POR Liguria FSE 2014IT05SFOP006
POR Lombardia FSE 2014IT05SFOP007
POR Valle d'Aosta FSE 2014IT05SFOP011
POR Toscana FSE 2014IT05SFOP015
PA Bolzano FSE 2014IT05SFOP017
POR Sicilia FSE 2014IT05SFOP014
POR Umbria FSE 2014IT05SFOP010
POR Emilia Romagna FSE 2014IT05SFOP003
PA Trento 2014IT05SFOP018
327 (30 hour module)
357 (30 hour module with additional specific support)
654 (60 hour module)
684 (60 hour module with additional specific support)
1090 (100 hour module)
1120 (100 hour module with additional specific support)
191,10 (30 hour module)
221,10 (30 hours with additional specific support)
261,10 (30 hours with meal allowance)
291,10 (30 hours with additional specific support and meal allowance)
382,20 (60 hour module)
412,20 (60 hours with additional specific support)
522,20 (60 hours with meal allowance)
552,20 (60 hours with additional specific support and meal allowance)
637,00 (100 hour module)
667,00 (100 hours with additional specific support)
871,00 (100 hours with meal allowance)
901,00 (100 hours with additional specific support and meal allowance)
360,60 (30 hour module)
390,60 (30 hours with additional specific support)
430,60 (30 hours with meal allowance)
460,60 (30 hours with additional specific support and meal allowance)
721,20 (60 hour module)
751,20 (60 hours with additional specific support)
861,20 (60 hours with meal allowance)
891,20 (60 hours with additional specific support and meal allowance)
1202,00 (100 hour module)
1232,00 (100 hours with additional specific support)
1436,00 (100 hours with meal allowance)
1466,00 (100 hours with additional specific support and meal allowance )
774,00 (40 hour module)
1161,00 (60 hour module)
1548,00 (80 hour module)
786,60 (60 hour module)
1179,90 (90 hour module)
1573,20 (120 hour module)
3146,40 (240 hour module)
2. Adjustment of amounts
2.
(a) For standard scales of unit costs 1-9, the amounts may be adjusted where the FOI index (consumer price index for blue and white collar worker households, excluding tobacco products) shows a monetary revaluation equal to or exceeding 5 %. In particular, in a given year y, the adjustment is made if in a period y + t the difference between the benchmarking coefficients shown by the FOI index for such years is equal to or higher than 5 %. The base year applied — and on the basis of which the amounts were adjusted — is 2014. Where this rate is equal to or higher than 5 %, each unit cost may be adjusted accordingly.
(b) For standard scale of unit costs 10, the rate may be adjusted by replacing the montly scholarship and/or social security contributions in the calculation method that consists of monthly scholarship plus social security contributions plus an amount for all other costs. Updated data can be found in amendments to the Ministerial Decree of 18.6.2008 (which defines the total gross annual amount of PhD scholarships) and biannual adjustment of the rate of social security contributions (Circular letter No. 13 of 29.1.2016 of the Director General of INPS, the National Institute for Social Security).
(c) For standard scales of unit costs 11-15, which are based on the historical average number of certificates (output) awarded per module, the rate may be adjusted at the end of each financial year (31/12) following an assessment by the Managing Authority of the implementation of the operations related to each of the unit costs. Where such an assessment shows a divergence in the average number of certificates awarded per module for each type of training as compared to the average number used as the basis for calculating the existing unit cost, then a new unit cost will be calculated according to the following formula: UCnew = UCold + Variation where Variation = UCold – (UCold * Outputnew / Outputold)
3.1 Interregional travel costs (in EUR) Region of origin Travel costs Destination region Valle d'Aosta PA Bolzano PA Trento Liguria Piemonte Lombardia Veneto Friuli Venezia Giulia Emilia-Romagna Toscana Marche Abruzzo Umbria Lazio Campania Molise Basilicata Puglia Calabria Sicilia Sardegna Abruzzo 269,30 211,17 198,50 148,63 231,83 232,74 201,95 226,34 167,99 68,60 58,98 0,00 23,32 25,81 125,43 45,79 83,99 93,05 164,82 165,16 182,46 Basilicata 271,11 236,02 227,31 236,81 294,55 239,98 259,23 264,89 201,50 176,59 97,35 83,99 142,75 67,92 33,96 31,24 0,00 55,47 71,43 114,33 224,18 Calabria 369,32 285,04 273,72 242,02 351,32 340,51 304,28 304,39 270,32 238,63 243,15 164,82 178,18 139,01 90,33 85,58 71,43 69,05 0,00 75,62 280,55 Campania 253,00 271,68 259,06 113,20 246,78 221,87 165,84 302,24 178,86 160,74 169,86 125,43 151,01 99,62 0,00 21,28 33,96 89,20 90,33 113,20 190,22 Emilia-Romagna 146,48 81,50 74,71 38,26 129,05 92,82 63,39 55,47 0,00 54,34 62,26 167,99 52,07 131,31 178,86 160,52 201,50 140,37 270,32 292,06 188,94 Friuli Venezia Giulia 129,05 103,24 82,30 120,22 175,52 99,62 37,36 0,00 55,47 70,18 163,01 226,34 162,50 113,20 302,24 218,87 264,89 241,12 304,39 325,00 279,13 Lazio 230,31 172,06 160,74 129,05 210,55 201,50 165,27 113,20 131,31 99,62 70,18 25,81 54,34 0,00 99,62 29,21 67,92 113,20 139,01 138,10 156,65 Liguria 53,66 113,94 105,11 0,00 36,22 49,81 106,41 120,22 38,26 67,47 118,07 148,63 75,50 129,05 113,20 152,03 236,81 250,17 242,02 231,61 224,15 Lombardia 59,37 97,35 76,47 49,81 67,92 0,00 69,05 99,62 92,82 113,20 108,67 232,74 84,90 201,50 221,87 223,91 239,98 179,99 340,51 335,07 179,51 Marche 200,25 84,90 76,98 118,07 119,99 108,67 70,18 163,01 62,26 108,11 0,00 58,98 43,92 70,18 169,86 75,96 97,35 107,54 243,15 216,21 251,20 Molise 259,51 196,06 194,31 152,03 232,97 223,91 194,48 218,87 160,52 126,56 75,96 45,79 106,75 29,21 21,28 0,00 31,24 70,30 85,58 140,48 185,85 PA Bolzano 118,58 0,00 36,22 113,94 151,35 97,35 96,22 103,24 81,50 110,94 84,90 67,92 127,01 172,06 271,68 196,06 236,02 138,10 285,04 310,17 273,47 PA Trento 112,24 36,22 0,00 105,11 147,22 76,47 19,02 82,30 74,71 99,62 76,98 198,50 120,44 160,74 259,06 194,31 227,31 132,44 273,72 308,24 247,26 Piemonte 17,43 151,35 147,22 36,22 0,00 67,92 103,01 175,52 129,05 147,16 119,99 231,83 181,74 210,55 246,78 232,97 294,55 191,31 351,32 273,60 187,92 Puglia 275,59 138,10 132,44 250,17 191,31 179,99 164,71 241,12 140,37 212,82 107,54 93,05 156,78 113,20 89,20 70,30 55,47 0,00 69,05 147,61 279,42 Sardegna 205,36 273,47 247,26 224,15 187,92 179,51 248,56 279,13 188,94 189,41 251,20 182,46 210,98 156,65 190,22 185,85 224,18 279,42 280,55 185,82 0,00 Sicilia 350,35 310,17 308,24 231,61 273,60 335,07 303,38 325,00 292,06 273,94 216,21 165,16 189,50 138,10 113,20 140,48 114,33 147,61 75,62 0,00 185,82 Toscana 169,12 110,94 99,62 67,47 147,16 113,20 95,09 70,18 54,34 0,00 108,11 68,60 36,22 99,62 160,74 126,56 176,59 212,82 238,63 273,94 189,41 Umbria 199,18 127,01 120,44 75,50 181,74 84,90 125,14 162,50 52,07 36,22 43,92 23,32 0,00 54,34 151,01 106,75 142,75 156,78 178,18 189,50 210,98 Valle d'Aosta 0,00 118,58 112,24 53,66 17,43 59,37 155,03 129,05 146,48 169,12 200,25 269,30 199,18 230,31 253,00 259,51 271,11 275,59 369,32 350,35 205,36 Veneto 155,03 96,22 19,02 106,41 103,01 69,05 0,00 37,36 63,39 95,09 70,18 201,95 125,14 165,27 165,84 194,48 259,23 164,71 304,28 303,38 248,56
3.2 Interregional accommodation costs (for more than 600 hours) (in EUR) Region of origin Accommodation costs Destination region Valle d'Aosta PA Bolzano PA Trento Liguria Piemonte Lombardia Veneto Friuli Venezia Giulia Emilia- Romagna Toscana Marche Abruzzo Umbria Lazio Campania Molise Basilicata Puglia Calabria Sicilia Sardegna Abruzzo 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Basilicata 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Calabria 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Campania 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Emilia-Romagna 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Friuli Venezia Giulia 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Lazio 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Liguria 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Lombardia 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Marche 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Molise 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 PA Bolzano 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 PA Trento 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Piemonte 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Puglia 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Sardegna 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Sicilia 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Toscana 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Umbria 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Valle d'Aosta 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Veneto 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62
3.3 Interregional subsistence costs (for more than 600 hours) (in EUR) Region of origin Meal costs Destination region Valle d'Aosta PA Bolzano PA Trento Liguria Piemonte Lombardia Veneto Friuli Venezia Giulia Emilia-Romagna Toscana Marche Abruzzo Umbria Lazio Campania Molise Basilicata Puglia Calabria Sicilia Sardegna Abruzzo 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Basilicata 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Calabria 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Campania 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Emilia-Romagna 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Friuli Venezia Giulia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Lazio 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Liguria 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Lombardia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Marche 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Molise 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 PA Bolzano 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 PA Trento 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Piemonte 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Puglia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Sardegna 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Sicilia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Toscana 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Umbria 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Valle d'Aosta 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Veneto 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27
3.4 Interregional allowances for traineeships (in EUR) No. of training hours Abruzzo Basilicata Calabria Campania Emilia Romagna Friuli Venezia Giulia Lazio Liguria Lombardia Marche Molise PA Bolzano PA Trento Piemonte Puglia Sardegna Sicilia Toscana Umbria Valle d'Aosta Veneto Region where the training is taking place Valle d'Aosta 160 611,70 613,51 711,72 595,40 488,88 471,45 572,71 396,06 401,77 542,65 601,91 460,98 454,64 359,83 617,99 547,76 692,75 511,52 541,58 — 497,43 161-200 613,84 615,65 713,86 597,54 491,02 473,59 574,85 398,20 403,91 544,79 604,05 463,12 456,78 361,97 620,13 549,90 694,89 513,66 543,72 — 499,57 201-249 699,44 701,25 799,46 683,14 576,62 559,19 660,45 483,80 489,51 630,39 689,65 548,72 542,38 447,57 705,73 635,50 780,49 599,26 629,32 — 585,17 250-300 804,30 806,11 904,32 788,00 681,48 664,05 765,31 588,66 594,37 735,25 794,51 653,58 647,24 552,43 810,59 740,36 885,35 704,12 734,18 — 690,03 301-600 913,44 915,25 1013,46 897,14 790,62 773,19 874,45 697,80 703,51 844,39 903,65 762,72 756,38 661,57 919,73 849,50 994,49 813,26 843,32 — 799,17 > 600 1555,44 1557,25 1655,46 1539,14 1432,62 1415,19 1516,45 1339,80 1345,51 1486,39 1545,65 1404,72 1398,38 1303,57 1561,73 1491,50 1636,49 1455,26 1485,32 — 1441,17 Bolzano 160 585,59 610,44 659,45 646,09 455,92 477,65 546,48 488,35 471,77 459,31 570,48 — 410,64 525,76 512,52 647,88 684,58 485,35 501,42 492,99 470,63 161-200 587,93 612,78 661,79 648,43 458,26 479,99 548,82 490,69 474,11 461,65 572,82 — 412,98 528,10 514,86 650,22 686,92 487,69 503,76 495,33 472,97 201-249 681,53 706,38 755,39 742,04 551,86 573,60 642,42 584,29 567,71 555,26 666,42 — 506,58 621,71 608,46 743,83 780,53 581,29 597,37 588,93 566,58 250-300 796,20 821,04 870,06 856,70 666,53 688,26 757,09 698,96 682,37 669,92 781,08 — 621,25 736,37 723,13 858,49 895,19 695,96 712,03 703,60 681,24 301-600 915,54 940,39 989,40 976,05 785,87 807,60 876,43 818,30 801,72 789,27 900,43 — 740,59 855,71 842,47 977,83 1014,53 815,30 831,38 822,94 800,59 > 600 1617,57 1642,41 1691,43 1678,07 1487,90 1509,63 1578,46 1520,33 1503,74 1491,29 1602,45 — 1442,62 1557,74 1544,50 1679,86 1716,56 1517,33 1533,40 1524,97 1502,61 Trento 160 493,91 522,71 569,13 554,47 370,12 377,71 456,15 400,52 371,88 372,38 489,72 331,63 — 442,63 427,85 542,67 603,65 395,02 415,85 407,65 314,43 161-200 495,75 524,56 570,97 556,31 371,97 379,55 458,00 402,36 373,72 374,23 491,56 333,48 — 444,47 429,70 544,52 605,50 396,87 417,70 409,49 316,27 201-249 569,60 598,41 644,82 630,17 445,82 453,40 531,85 476,21 447,57 448,08 565,42 407,33 — 518,32 503,55 618,37 679,35 470,72 491,55 483,35 390,12 250-300 660,07 688,88 735,29 720,63 536,29 543,87 622,32 566,68 538,04 538,55 655,88 497,80 — 608,79 594,02 708,84 769,82 561,19 582,02 573,81 480,59 301-600 754,23 783,04 829,46 814,80 630,45 638,03 716,48 660,84 632,20 632,71 750,05 591,96 — 702,95 688,18 803,00 863,98 655,35 676,18 667,98 574,76 > 600 1308,13 1336,93 1383,35 1368,69 1184,34 1191,93 1270,37 1214,74 1186,10 1186,61 1303,94 1145,85 — 1256,85 1242,07 1356,89 1417,87 1209,25 1230,07 1221,87 1128,65 Liguria 160 454,43 542,61 547,82 419,00 344,06 426,02 434,85 — 355,61 423,87 457,83 419,74 410,91 342,02 555,97 529,95 537,41 373,27 381,30 359,46 412,21 161-200 456,34 544,52 549,73 420,91 345,97 427,93 436,76 — 357,52 425,78 459,74 421,65 412,82 343,93 557,88 531,86 539,32 375,18 383,21 361,37 414,12 201-249 532,79 620,97 626,18 497,36 422,42 504,38 513,21 — 433,97 502,23 536,19 498,10 489,27 420,38 634,33 608,31 615,77 451,63 459,66 437,82 490,57 250-300 626,44 714,63 719,83 591,01 516,07 598,03 606,86 — 527,62 595,88 629,84 591,75 582,92 514,04 727,98 701,96 709,42 545,28 553,32 531,47 584,22 301-600 723,92 812,10 817,31 688,48 613,55 695,50 704,33 — 625,09 693,35 727,31 689,22 680,39 611,51 825,46 799,43 806,89 642,75 650,79 628,94 681,69 > 600 1297,29 1385,47 1390,68 1261,86 1186,92 1268,88 1277,71 — 1198,47 1266,73 1300,69 1262,59 1253,76 1184,88 1398,83 1372,81 1380,27 1216,13 1224,16 1202,32 1255,07 Piemonte 160 555,86 618,58 675,35 570,81 453,08 499,55 534,58 360,26 391,95 444,02 557,00 475,38 471,25 — 515,34 511,95 597,64 471,19 505,77 341,46 427,04 161-200 557,89 620,60 677,37 572,83 455,10 501,57 536,61 362,28 393,98 446,05 559,02 477,40 473,27 — 517,36 513,98 599,66 473,22 507,80 343,49 429,07 201-249 638,90 701,61 758,38 653,84 536,11 582,58 617,62 443,29 474,98 527,06 640,03 558,41 554,28 — 598,37 594,99 680,67 554,22 588,81 424,50 510,08 250-300 738,13 800,85 857,61 753,07 635,35 681,82 716,85 542,52 574,22 626,29 739,26 657,65 653,52 — 697,61 694,22 779,90 653,46 688,04 523,73 609,31 301-600 841,42 904,13 960,90 856,36 738,63 785,10 820,14 645,81 677,50 729,58 842,55 760,93 756,80 — 800,89 797,51 883,19 756,74 791,33 627,02 712,60 > 600 1448,98 1511,69 1568,46 1463,92 1346,19 1392,66 1427,69 1253,37 1285,06 1337,13 1450,11 1368,49 1364,36 — 1408,45 1405,07 1490,75 1364,30 1398,88 1234,57 1320,15 Lombardia 160 693,90 701,15 801,67 683,03 553,99 560,78 662,66 510,97 — 569,83 685,07 558,51 537,63 529,08 641,15 640,67 796,23 574,36 546,06 520,54 530,21 161-200 696,78 704,03 804,55 685,92 556,87 563,66 665,54 513,85 — 572,72 687,95 561,40 540,51 531,96 644,03 643,56 799,12 577,24 548,94 523,42 533,10 201-249 812,07 819,32 919,84 801,21 672,16 678,95 780,83 629,14 — 688,01 803,24 676,69 655,80 647,26 759,32 758,85 914,41 692,54 664,24 638,71 648,39 250-300 953,31 960,55 1061,07 942,44 813,39 820,18 922,06 770,37 — 829,24 944,48 817,92 797,03 788,49 900,55 900,08 1055,64 833,77 805,47 779,94 789,62 301-600 1100,30 1107,55 1208,07 1089,43 960,39 967,18 1069,06 917,37 — 976,23 1091,47 964,91 944,03 935,48 1047,55 1047,07 1202,63 980,76 952,46 926,94 936,61 > 600 1964,98 1972,23 2072,75 1954,11 1825,07 1831,86 1933,74 1782,05 — 1840,91 1956,15 1829,59 1808,71 1800,16 1912,23 1911,75 2067,31 1845,44 1817,14 1791,61 1801,29 Veneto 160 499,08 556,36 601,42 462,97 360,53 334,49 462,41 403,54 366,19 367,32 491,61 393,36 316,15 400,15 461,84 545,70 600,51 392,22 422,28 452,16 — 161-200 500,94 558,22 603,27 464,83 362,38 336,35 464,26 405,40 368,04 369,18 493,47 395,21 318,01 402,00 463,70 547,56 602,37 394,08 424,13 454,02 — 201-249 575,22 632,50 677,56 539,11 436,67 410,63 538,55 479,68 442,33 443,46 567,75 469,50 392,29 476,29 537,98 621,84 676,65 468,36 498,42 528,30 — 250-300 666,22 723,50 768,56 630,11 527,67 501,63 629,55 570,68 533,33 534,46 658,75 560,49 483,29 567,29 628,98 712,84 767,65 559,36 589,42 619,30 — 301-600 760,93 818,21 863,27 724,82 622,38 596,34 724,26 665,39 628,04 629,17 753,46 655,21 578,00 662,00 723,69 807,55 862,36 654,07 684,13 714,01 — > 600 1318,06 1375,34 1420,39 1281,95 1179,51 1153,47 1281,39 1222,52 1185,17 1186,30 1310,59 1212,33 1135,13 1219,13 1280,82 1364,68 1419,49 1211,20 1241,26 1271,14 — Friuli Venezia Giulia 160 577,72 616,26 655,77 653,62 406,84 — 464,57 471,59 450,99 514,38 570,24 454,61 433,67 526,89 592,49 630,50 676,37 421,56 513,87 480,42 388,73 161-200 579,91 618,46 657,96 655,81 409,04 — 466,77 473,79 453,18 516,58 572,44 456,81 435,86 529,08 594,68 632,70 678,57 423,75 516,07 482,62 390,92 201-249 667,75 706,30 745,81 743,66 496,88 — 554,61 561,63 541,03 604,42 660,28 544,65 523,71 616,93 682,53 720,54 766,41 511,60 603,91 570,46 478,77 250-300 775,36 813,91 853,41 851,26 604,49 — 662,22 669,24 648,63 712,03 767,89 652,26 631,32 724,54 790,13 828,15 874,02 619,20 711,52 678,07 586,37 301-600 887,36 925,91 965,41 963,26 716,49 — 774,22 781,24 760,63 824,03 879,89 764,26 743,31 836,54 902,13 940,15 986,02 731,20 823,52 790,07 698,37 > 600 1546,18 1584,73 1624,24 1622,09 1375,31 — 1433,04 1440,06 1419,46 1482,85 1538,71 1423,08 1402,14 1495,36 1560,96 1598,97 1644,84 1390,03 1482,34 1448,89 1357,20 No. of training hours Abruzzo Basilicata Calabria Campania Emilia Romagna Friuli Venezia Giulia Lazio Liguria Lombardia Marche Molise PA Bolzano PA Trento Piemonte Puglia Sardegna Sicilia Toscana Umbria Valle d'Aosta Veneto Region where the training is taking place Emilia Romagna 160 562,62 596,13 664,95 573,49 — 450,10 525,95 432,89 487,46 456,89 555,15 476,14 469,35 523,68 535,00 583,58 686,69 448,97 446,71 541,11 458,03 161-200 565,09 598,60 667,42 575,96 — 452,57 528,41 435,36 489,92 459,36 557,62 478,60 471,81 526,15 537,47 586,04 689,16 451,44 449,17 543,58 460,49 201-249 663,75 697,25 766,08 674,61 — 551,23 627,07 534,02 588,58 558,02 656,28 577,26 570,47 624,81 636,13 684,70 787,81 550,09 547,83 642,24 559,15 250-300 784,60 818,11 886,94 795,47 — 672,08 747,93 654,88 709,44 678,87 777,13 698,12 691,33 745,66 756,98 805,56 908,67 670,95 668,69 763,10 680,01 301-600 910,39 943,90 1012,73 921,26 — 797,87 873,72 780,67 835,23 804,66 902,92 823,91 817,12 871,45 882,77 931,35 1034,46 796,74 794,48 888,88 805,80 > 600 1650,33 1683,84 1752,66 1661,20 — 1537,81 1613,65 1520,60 1575,16 1544,60 1642,86 1563,84 1557,05 1611,39 1622,71 1671,28 1774,40 1536,68 1534,41 1628,82 1545,73 Toscana 160 448,73 556,73 618,76 540,88 434,47 450,32 479,75 447,60 493,34 488,24 506,69 491,07 479,75 527,30 592,95 569,54 654,08 — 416,36 549,26 475,22 161-200 451,11 559,10 621,14 543,26 436,85 452,70 482,13 449,98 495,71 490,62 509,07 493,45 482,13 529,67 595,33 571,92 656,46 — 418,74 551,63 477,60 201-249 546,14 654,14 716,17 638,29 531,88 547,73 577,16 545,01 590,75 585,65 604,10 588,48 577,16 624,71 690,36 666,95 751,49 — 513,77 646,67 572,63 250-300 662,56 770,55 832,59 754,71 648,30 664,15 693,58 661,43 707,16 702,07 720,52 704,90 693,58 741,12 806,78 783,37 867,91 — 630,19 763,08 689,05 301-600 783,73 891,72 953,76 875,87 769,47 785,31 814,75 782,60 828,33 823,24 841,69 826,07 814,75 862,29 927,95 904,54 989,07 — 751,35 884,25 810,22 > 600 1496,48 1604,48 1666,51 1588,63 1482,22 1498,07 1527,50 1495,35 1541,08 1535,99 1554,44 1538,82 1527,50 1575,04 1640,70 1617,29 1701,83 — 1464,11 1597,01 1522,97 Marche 160 347,07 385,44 531,24 457,95 350,35 451,10 358,27 406,16 396,76 — 364,05 372,99 365,07 408,08 395,63 539,29 504,30 396,20 332,01 488,34 358,27 161-200 348,87 387,24 533,04 459,75 352,15 452,90 360,07 407,96 398,56 — 365,85 374,79 366,87 409,88 397,43 541,09 506,10 398,00 333,81 490,14 360,07 201-249 420,89 459,27 605,07 531,77 424,17 524,92 432,10 479,98 470,59 — 437,87 446,81 438,89 481,91 469,45 613,12 578,13 470,02 405,83 562,16 432,10 250-300 509,12 547,49 693,29 620,00 512,40 613,15 520,32 568,21 558,81 — 526,10 535,04 527,12 570,13 557,68 701,34 666,35 558,25 494,06 650,39 520,32 301-600 600,95 639,32 785,12 711,83 604,23 704,98 612,15 660,04 650,64 — 617,93 626,87 618,95 661,96 649,51 793,17 758,18 650,08 585,89 742,22 612,15 >600 1141,12 1179,49 1325,29 1251,99 1144,40 1245,15 1152,32 1200,21 1190,81 — 1158,10 1167,04 1159,11 1202,13 1189,68 1333,34 1298,35 1190,24 1126,06 1282,39 1152,32 Abruzzo 160 — 353,35 434,18 394,78 437,35 495,70 295,17 417,99 502,10 328,34 315,15 337,28 467,86 501,19 362,41 451,81 434,52 337,96 292,68 538,66 471,31 161-200 — 355,04 435,86 396,47 439,03 497,39 296,85 419,67 503,78 330,02 316,83 338,96 469,54 502,88 364,09 453,50 436,20 339,64 294,36 540,35 472,99 201-249 — 422,38 503,20 463,81 506,37 564,73 364,19 487,01 571,12 397,36 384,17 406,30 536,88 570,22 431,43 520,84 503,54 406,98 361,70 607,69 540,33 250-300 — 504,87 585,69 546,30 588,86 647,22 446,68 569,51 653,61 479,85 466,66 488,79 619,37 652,71 513,92 603,33 586,03 489,47 444,19 690,18 622,82 301-600 — 590,73 671,55 632,16 674,72 733,08 532,54 655,36 739,47 565,71 552,52 574,65 705,23 738,57 599,78 689,19 671,89 575,33 530,05 776,03 708,68 > 600 — 1095,77 1176,60 1137,21 1179,77 1238,12 1037,59 1160,41 1244,52 1070,76 1057,57 1079,70 1210,28 1243,61 1104,83 1194,24 1176,94 1080,38 1035,10 1281,08 1213,73 Umbria 160 361,45 480,87 516,31 489,14 390,20 500,63 392,46 413,63 423,03 382,05 444,88 465,14 458,57 519,87 494,91 549,11 527,63 374,35 — 537,30 463,27 161-200 363,56 482,99 518,42 491,25 392,31 502,74 394,58 415,75 425,14 384,16 446,99 467,25 460,69 521,98 497,02 551,22 529,74 376,47 — 539,42 465,38 201-249 448,09 567,52 602,95 575,78 476,85 587,27 479,11 500,28 509,67 468,70 531,52 551,78 545,22 606,52 581,56 635,76 614,27 461,00 — 623,95 549,92 250-300 551,65 671,07 706,50 679,34 580,40 690,82 582,66 603,83 613,23 572,25 635,07 655,34 648,77 710,07 685,11 739,31 717,82 564,55 — 727,50 653,47 301-600 659,42 778,85 814,28 787,11 688,18 798,60 690,44 711,61 721,00 680,03 742,85 763,12 756,55 817,85 792,89 847,09 825,60 672,33 — 835,28 761,25 > 600 1293,42 1412,84 1448,27 1421,11 1322,17 1432,59 1324,43 1345,60 1355,00 1314,02 1376,84 1397,11 1390,54 1451,84 1426,88 1481,08 1459,59 1306,32 — 1469,27 1395,24 Lazio 160 512,01 554,12 625,21 585,81 617,51 599,40 — 615,25 687,69 556,38 515,40 658,26 646,94 696,75 599,40 642,84 624,30 585,81 540,53 716,50 651,47 161-200 515,05 557,16 628,25 588,85 620,55 602,44 — 618,28 690,73 559,42 518,44 661,30 649,98 699,79 602,44 645,88 627,34 588,85 543,57 719,54 654,51 201-249 636,60 678,71 749,80 710,40 742,10 723,99 — 739,83 812,28 680,97 639,99 782,85 771,53 821,34 723,99 767,43 748,89 710,40 665,12 841,09 776,06 250-300 785,49 827,60 898,69 859,30 891,00 872,88 — 888,73 961,18 829,87 788,89 931,75 920,43 970,24 872,88 916,33 897,79 859,30 814,02 989,99 924,96 301-600 940,47 982,58 1053,67 1014,27 1045,97 1027,86 — 1043,71 1116,15 984,84 943,86 1086,72 1075,40 1125,21 1027,86 1071,31 1052,76 1014,27 968,99 1144,96 1079,93 > 600 1852,09 1894,20 1965,29 1925,89 1957,59 1939,48 — 1955,33 2027,77 1896,46 1855,48 1998,34 1987,02 2036,83 1939,48 1982,93 1964,38 1925,89 1880,61 2056,58 1991,55 Campania 160 452,64 361,17 417,55 — 506,07 629,46 426,83 440,41 549,08 497,07 348,49 598,89 586,27 573,99 416,41 517,43 440,41 487,96 478,22 580,21 493,05 161-200 454,68 363,22 419,59 — 508,11 631,50 428,87 442,46 551,13 499,11 350,54 600,94 588,32 576,03 418,46 519,48 442,46 490,00 480,27 582,26 495,10 201-249 536,49 445,02 501,39 — 589,92 713,30 510,68 524,26 632,93 580,92 432,34 682,74 670,12 657,84 500,26 601,28 524,26 571,80 562,07 664,06 576,90 250-300 636,69 545,23 601,60 — 690,13 813,51 610,89 624,47 733,14 681,13 532,55 782,95 770,33 758,05 600,47 701,49 624,47 672,01 662,28 764,27 677,11 301-600 740,99 649,53 705,90 — 794,42 917,81 715,18 728,77 837,44 785,42 636,85 887,25 874,63 862,34 704,77 805,79 728,77 776,31 766,58 868,57 781,41 > 600 1354,52 1263,05 1319,43 — 1407,95 1531,34 1328,71 1342,29 1450,96 1398,95 1250,37 1500,77 1488,15 1475,87 1318,29 1419,31 1342,29 1389,84 1380,10 1482,09 1394,93 Molise 160 354,06 339,51 393,85 329,55 468,79 527,14 337,48 460,30 532,18 384,23 — 504,33 502,58 541,24 378,57 494,12 448,75 434,83 415,02 567,78 502,75 161-200 355,99 341,44 395,78 331,48 470,71 529,07 339,40 462,22 534,11 386,15 — 506,26 504,50 543,16 380,49 496,05 450,68 436,75 416,94 569,71 504,67 201-249 433,05 418,51 472,84 408,55 547,78 606,14 416,47 539,29 611,17 463,22 — 583,33 581,57 620,23 457,56 573,12 527,75 513,82 494,01 646,78 581,74 250-300 527,46 512,92 567,25 502,95 642,19 700,54 510,88 633,70 705,58 557,63 — 677,73 675,98 714,64 551,97 667,52 622,15 608,23 588,42 741,18 676,15 301-600 625,72 611,18 665,51 601,21 740,45 798,81 609,14 731,96 803,84 655,89 — 776,00 774,24 812,90 650,23 765,78 720,41 706,49 686,68 839,44 774,41 > 600 1203,73 1189,18 1243,52 1179,22 1318,46 1376,81 1187,14 1309,97 1381,85 1233,90 — 1354,00 1352,25 1390,90 1228,24 1343,79 1298,42 1284,50 1264,69 1417,45 1352,42 No. of training hours Abruzzo Basilicata Calabria Campania Emilia Romagna Friuli Venezia Giulia Lazio Liguria Lombardia Marche Molise PA Bolzano PA Trento Piemonte Puglia Sardegna Sicilia Toscana Umbria Valle d'Aosta Veneto Region where the training is taking place Basilicata 160 320,95 — 308,39 270,92 438,46 501,85 304,88 473,77 476,94 334,31 268,20 472,98 464,27 531,51 292,43 461,14 351,29 413,55 379,71 508,07 496,19 161-200 322,44 — 309,87 272,40 439,94 503,33 306,36 475,26 478,43 335,79 269,68 474,46 465,75 532,99 293,91 462,62 352,77 415,03 381,19 509,56 497,67 201-249 381,68 — 369,11 331,64 499,18 562,57 365,60 534,50 537,67 395,03 328,92 533,70 524,99 592,23 353,15 521,86 412,01 474,27 440,43 568,80 556,91 250-300 454,25 — 441,68 404,21 571,75 635,14 438,17 607,07 610,23 467,60 401,49 606,27 597,56 664,80 425,72 594,43 484,58 546,84 513,00 641,36 629,48 301-600 529,78 — 517,21 479,74 647,28 710,67 513,70 682,60 685,77 543,13 477,02 681,80 673,09 740,33 501,25 669,96 560,11 622,37 588,53 716,90 705,01 > 600 974,08 — 961,51 924,04 1091,58 1154,97 958,00 1126,90 1130,07 987,43 921,33 1126,10 1117,39 1184,63 945,55 1114,26 1004,41 1066,67 1032,83 1161,20 1149,31 Puglia 160 372,30 334,71 348,30 368,45 419,61 520,36 392,45 529,42 459,23 386,79 349,54 417,35 411,69 470,55 — 558,67 426,86 492,06 436,03 554,83 443,95 161-200 374,04 336,46 350,04 370,19 421,36 522,11 394,19 531,16 460,98 388,53 351,29 419,09 413,43 472,30 — 560,41 428,60 493,81 437,77 556,58 445,70 201-249 443,85 406,27 419,85 440,00 491,17 591,92 464,00 600,97 530,79 458,34 421,10 488,91 483,25 542,11 — 630,22 498,41 563,62 507,58 626,39 515,51 250-300 529,37 491,79 505,37 525,52 576,69 677,44 549,52 686,49 616,31 543,86 506,62 574,42 568,76 627,63 — 715,74 583,93 649,14 593,10 711,91 601,03 301-600 618,38 580,80 594,38 614,53 665,70 766,45 638,53 775,50 705,32 632,87 595,63 663,43 657,77 716,64 — 804,75 672,94 738,15 682,11 800,92 690,04 > 600 1141,97 1104,38 1117,97 1138,12 1189,28 1290,03 1162,11 1299,09 1228,90 1156,45 1119,21 1187,02 1181,36 1240,22 — 1328,34 1196,53 1261,73 1205,70 1324,50 1213,62 Calabria 160 447,87 354,48 — 373,38 553,37 587,45 422,06 525,07 623,56 526,20 368,63 568,09 556,77 634,37 352,10 563,61 358,67 521,68 461,23 652,37 587,33 161-200 449,64 356,25 — 375,15 555,14 589,22 423,83 526,84 625,33 527,97 370,40 569,86 558,54 636,14 353,87 565,38 360,44 523,45 463,00 654,14 589,10 201-249 520,40 427,01 — 445,92 625,90 659,98 494,59 597,60 696,09 598,74 441,16 640,62 629,30 706,90 424,64 636,14 431,20 594,21 533,76 724,90 659,86 250-300 607,09 513,70 — 532,60 712,59 746,66 581,28 684,29 782,77 685,42 527,85 727,31 715,99 793,58 511,32 722,82 517,89 680,89 620,44 811,58 746,55 301-600 697,31 603,92 — 622,82 802,81 836,88 671,50 774,51 873,00 775,64 618,07 817,53 806,21 883,81 601,54 813,04 608,11 771,12 710,67 901,81 836,77 > 600 1228,03 1134,64 — 1153,54 1333,53 1367,61 1202,22 1305,23 1403,72 1306,36 1148,79 1348,25 1336,93 1414,53 1132,26 1343,77 1138,83 1301,84 1241,39 1432,53 1367,49 Sicilia 160 523,88 473,06 434,34 471,93 650,78 683,72 496,83 590,33 693,80 574,94 499,21 668,89 666,97 632,33 506,34 544,54 — 632,67 548,22 709,08 662,10 161-200 526,13 475,30 436,59 474,17 653,02 685,96 499,07 592,57 696,04 577,18 501,45 671,14 669,21 634,57 508,58 546,79 — 634,91 550,46 711,32 664,34 201-249 615,81 564,98 526,27 563,85 742,70 775,65 588,75 682,26 785,72 666,86 591,13 760,82 758,89 724,25 598,26 636,47 — 724,59 640,15 801,00 754,02 250-300 725,67 674,84 636,13 673,71 852,56 885,51 698,61 792,12 895,58 776,72 700,99 870,68 868,75 834,11 708,12 746,33 — 834,45 750,01 910,86 863,88 301-600 840,01 789,18 750,47 788,05 966,91 999,85 812,96 906,46 1009,92 891,06 815,33 985,02 983,10 948,46 822,46 860,67 — 948,80 864,35 1025,21 978,23 > 600 1512,62 1461,79 1423,08 1460,66 1639,52 1672,46 1485,57 1579,07 1682,53 1563,67 1487,94 1657,63 1655,71 1621,07 1495,08 1533,28 — 1621,41 1536,96 1697,82 1650,84 Sardegna 160 410,58 452,31 508,68 418,35 417,07 507,25 384,77 452,27 407,64 479,33 413,98 501,59 475,39 416,05 507,55 — 413,94 417,53 439,11 433,48 476,69 161-200 412,01 453,73 510,10 419,77 418,49 508,68 386,20 453,70 409,06 480,75 415,40 503,02 476,81 417,47 508,97 — 415,37 418,96 440,53 434,91 478,11 201-249 469,04 510,76 567,14 476,80 475,52 565,71 443,23 510,73 466,09 537,78 472,43 560,05 533,84 474,50 566,00 — 472,40 475,99 497,56 491,94 535,15 250-300 538,90 580,63 637,00 546,67 545,39 635,57 513,09 580,59 535,96 607,65 542,30 629,91 603,71 544,37 635,87 — 542,26 545,85 567,43 561,80 605,01 301-600 611,61 653,34 709,71 619,38 618,10 708,29 585,80 653,31 608,67 680,36 615,01 702,63 676,42 617,08 708,58 — 614,98 618,56 640,14 634,51 677,72 > 600 1039,35 1081,07 1137,45 1047,11 1045,83 1136,02 1013,54 1081,04 1036,40 1108,09 1042,74 1130,36 1104,15 1044,81 1136,31 — 1042,71 1046,30 1067,87 1062,25 1105,46
3.5 Allowances for traineeships under transnational mobility (in EUR) Country Months SA MA GA 1 2 3 4 5 6 Austria 1617 2312 3094 4082 4732 5382 162,5 650,2 22,733 Belgium 1501 2183 2841 3719 4305 4890 151,0 585,3 21,575 Bulgaria 990 1413 1831 2583 2980 3377 99,2 396,7 13,97 Cyprus 1342 1854 2499 3316 3957 4495 134,5 538,2 18,94 Czech Republic 1365 1876 2522 3369 4018 4564 136,5 546,17 19,51 Germany 1477 2114 2751 3749 4344 4939 148,7 594,67 21,24 Denmark 1973 2840 3707 5080,5 5889 6698 202,1 808,5 28,88 Estonia 1504 2226 2949 3765 4366 4968 150,3 601,33 21,48 Spain 1552 2199 2860 3894 4514 5133 154,8 619,17 22,11 Finland 1806 2587 3351 4537 5260 5982 180,6 722,5 25,80 France 1771 2533 3295 4451 5162 5873 177,8 711 25,39 United Kingdom 1972 2820 3668 4950 5737 6525 196,9 787,67 28,13 Hungary 1255 1790 2324 3223 3727 4231 126,1 504,33 18,01 Greece 1402 2000 2598 3674 4251 4828 144,2 576,83 20,60 Ireland 1788 2559 3330 4493 5210 5927 179,3 717,3 25,62 Iceland 1614 2312 3011 4062 4710 5358 162 648 23,14 Liechenstein 1978 2817 3656 4968 5758 6547 197,4 789,5 28,20 Lithuania 1145 1639 2133 2912 3420 3882 115,6 462,3 16,51 Luxembourg 1501 2148 2794 3802 4406 5010 151 604 21,57 Latvia 1204 1721 2238 3104 3589 4074 121,2 484,8 17,32 Malta 1315 1883 2452 3362 3891 4420 132,3 529 18,89 Netherlands 1597 2350 3058 4144 4805 5466 165,3 661,2 23,61 Norway 2129 3035 3942 5341 6189 7036 211,9 847,7 30,27 Poland 1232 1758 2284 3174 3669 4165 123,9 495,5 17,70 Portugal 1371 1959 2548 3492 4041 4591 137,4 549,5 19,63 Romania 1056 1507 1958 2745 3170 3596 106,3 425,3 15,19 Sweden 1771 2533 3288 4452 5161 5871 177,3 709,3 25,33 Slovenia 1363 1945 2526 3465 4011 4556 136,3 545,3 19,48 Slovakia 1293 1850 2408 3308 3827 4346 129,8 519,2 18,54 Turkey 1194 1706 2218 3071 3552 4033 120,3 481 17,18 Switzerland 1879 2579 3279 4670 5370 6070 175,0 700,0 25,00 Croatia 1157 1589 2021 2953 3385 3817 108 432 15,43
3.6 Allowances for interview(s) Place or country of destination Distance (KM) Amount (EUR) Travel and accommodation Daily subsistence allowance (DSA) Any EU-28 or Iceland and Norway 0 - 50 0 50 / day (> 12 hours) 25/12 day (> 6 - 12 hours) Max 3 days > 50 - 250 100 > 250 - 500 250 > 500 350
3.7 Allowance to move to another Member State (work placement) Country of Destination Amount (EUR) Austria 1025 Belgium 970 Bulgaria 635 Croatia 675 Cyprus 835 Czech Republic 750 Denmark 1270 Estonia 750 Finland 1090 France 1045 Germany 940 Greece 910 Hungary 655 Iceland 945 Ireland 1015 Italy 995 Latvia 675 Lithuania 675 Luxembourg 970 Malta 825 Netherlands 950 Norway 1270 Poland 655 Portugal 825 Romania 635 Slovakia 740 Slovenia 825 Spain 890 Sweden 1090 United Kingdom 1060
3.8 Daily accommodation costs (in EUR) Student daily allowances Staff daily allowances Country Group Country (Day 1-day 14) (Day 15-Day 60) (Day 1-day 14) (Day 15-Day 60) Group A United Kingdom 90 63 128 90 Group B Denmark 86 60 128 90 Group C Netherlands 83 58 128 90 Sweden 83 58 128 90 Group D Cyprus 77 54 112 78 Finland 77 54 112 78 Luxembourg 77 54 112 78 Group E Austria 74 52 112 78 Belgium 74 52 112 78 Bulgaria 74 52 112 78 Czech Republic 74 52 112 78 Group F Greece 70 49 112 78 Hungary 70 49 112 78 Switzerland 70 49 112 78 Liechtenstein 70 49 112 78 Norway 70 49 112 78 Poland 70 49 112 78 Romania 70 49 112 78 Turkey 70 49 112 78 Group G Germany 67 47 96 67 Spain 67 47 96 67 Latvia 67 47 96 67 FYROM 67 47 96 67 Malta 67 47 96 67 Slovakia 67 47 96 67 Group H Croatia 58 41 80 56 Estonia 58 41 80 56 Lithuania 58 41 80 56 Slovenia 58 41 80 56 Group I France 80 56 112 78 Ireland 80 56 128 90 Iceland 80 56 112 78 Group L Portugal 64 45 96 67
ANNEX VII Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Slovakia
1.1.2.3.4.5.6.7.
Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Professional development of employees in foreign language skills under Priority Axes 2, 3 and 4 of the Operational Programme Human Resources (2014SK05M0OP001) 45-minute period of foreign language training per employee All eligible costs of the operation, including direct costs of providing training. Number of completed 45-minute periods of foreign language training per employee. 8,53 European Computer Driving Licence (ECDL certification under Priority Axes 1, 2 and 3 of Operational Programme Human Resources (2014SK05M0OP001) ECDL certification All eligible costs of the operation, including direct cost of sitting examination and issuing certificate Number of ECDL certificates awarded, differentiated by profile and module Certificate Name Price ECDL Profile — 1 Base/Standard exam 31,50 ECDL Profile — 2 Base/Standard exams 59,00 ECDL Profile — 3 Base/Standard exams 76,50 ECDL Profile — 4 Base/Standard exams 92,00 ECDL Profile — 5 Base/Standard exams 111,50 ECDL Profile — 6 Base/Standard exams 127,00 ECDL Profile — 7 Base/Standard exams 142,50 ECDL Profile — 8 Base/Standard exams 163,00 ECDL Profile — 1 Advanced exam 39,10 ECDL Profile — 2 Advanced exams 74,30 ECDL Profile — 3 Advanced exams 99,40 ECDL Profile — 4 Advanced exams 122,50 Inclusion in elementary schools under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001) Occupation of newly created posts in inclusive teams Direct wage costs Indirect costs Number of months during which a newly created post in an inclusive team is occupied. School psychologist — 1235 per month Special pedagogue / social pedagogue — 1440 per month Inclusion in kindergartens and elementary schools under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001) Occupation of newly created posts for pedagogical assistants Direct wage costs Indirect costs Number of months during which a newly created post for a pedagogical assistant is occupied 1005 per month Integration of pupils in kindergartens and schools under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001) Occupation of a newly created teacher's assistant post Direct wage costs Indirect costs Number of months during which a newly created post of teachers assistant is occupied 865 per month Training of prospective teachers of higher eduaction facilities under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001) One hour of analysis by a training teacher of a student's direct teaching activity unit (school class) or direct education activity (school facility) Direct wage costs Indirect costs Number of hours of direct analysis by a training teacher of students' direct teaching activity unit (school class) or direct education activity (school facility) 9,66 per hour Training of teaching and specialised staff under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001) One hour of participation in training for teaching and specialised staff Direct wage costs of the trainer and wages of the participant. Number of completed hours per participant in training for teaching and specialised staff Group of 20 participants: 10,10 per completed hour per participant Group of 12 participants: 10,65 per completed hour per participant.
2. Adjustment of amounts Not Applicable.
ANNEX IX Conditions for reimbursement of expenditure on the basis of unit costs and lump sums to the Netherlands
1.1.2.3. Definition of standard scales of unit costs Type of operations Indicators name Category of costs Measurement unit for the indicators Amounts (in EUR) Reintegration activities for detainees in the sector Prison Services Priority Axis 1 OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion Calendar days of participation of a detainee during the period of intervention, in the sector Prison Services (GW). All eligible costs (personnel costs, other direct and indirect costs). Number of calendar days of participation of a detainee in the period of intervention 14,50 Reintegration activities for detainees in forensic care (Forzo) Priority Axis 1 OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion Calendar days of participation of a detainee during the period of intervention in the sector forensic care (Forzo) All eligible costs (personnel costs, other direct and indirect costs). Number of calendar days of participation of a detainee in the period of intervention. 21,00 Reintegration activities for juvenile offenders and youth in institutions placed under supervision based on a court judgment under civil law Priority Axis 1 OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion Calendar days of participation of a juvenile offender and a young person during the period of intervention in the sector Juvenile offenders and youth in custodial institutions under civil law (JI) All eligible costs (personnel costs, other direct and indirect costs). Number of calendar days of participation of a juvenile offender and a young person in the period of intervention. 26,50
2. Adjustment of amounts The amounts of unit costs set out for types of operation 1-3 will be adjusted yearly in line with the Dutch consumer price index (CPI): https://www.cbs.nl/nl-nl/conversie/uitgelicht/de-consumentenprijsindex. Index figures can be found on CBS Statline. The first indexation will be calculated in 2017. The baseline year for the amounts of unit costs set out in this annex is 2015. (CPI 2015 = 100). Every year (N), as from 2017, the amounts will be indexed by applying the CPI of the year N-1 with the year 2015 as baseline. The following formula will be used for calculating the amounts of unit costs to be applied in a given year: Unit cost amounts in year N = Unit cost amounts included in this annex * CPI in year N-1 (with baseline 2015 = 100) / 100
3. Definition of lump sum Type of operations Indicator name Category of costs Measurement unit for the indicator Amounts (in EUR) Technical Assistance Priority axis 4 2014NL05SFOP001 New total expenditure included in a payment application (i.e. total eligible expenditure included in a payment application which has not yet been taken into account for calculating an installment of EUR 100000). All elgible costs. Installments of EUR 100000 of new total expenditure included in a payment application submitted to the European Commission until the maximum amount budgeted under the technical assistance priority axis is reached. 5690
4. Adjustments of amounts Not applicable.
ANNEX II
ANNEX X Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Austria
1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Measures to reduce the number of early school leavers. Priority axis 3 2014AT05SFOP001 Provision of teaching hour. Staff costs for teachers. Number of teaching hours per type of school. Type of school Amount 3070 95,91 3080 89,98 3081 96,28 3082 107,09 3091 78,87
2. Adjustment of amounts The rates are adjusted annually in line with the WFA Financial Effects Regulation. This regulation is published annually and contains specifications regarding the valorisation of personnel costs for the purpose of budget planning for the coming years. The rates will be adjusted for the first time on 1 September 2017 on the basis of the valorisation for 2017 laid down in that regulation.
ANNEX XI Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Lithuania
1.1.2.3.4. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Vocational training of unemployed people under Priority Axis 7 Promoting quality employment and participation in the labour market of OP 2014LT16MAOP001 Unemployed people who successfully complete long-term formal training All eligible costs Number of participants who have received a certificate verifying successful completion of long-term formal training of 184 days or more. 3460,33 Vocational training of unemployed people under Priority Axis 7 Promoting quality employment and participation in the labour market of OP 2014LT16MAOP001 Unemployed people who successfully complete medium-term formal training All eligible costs Number of participants who have received a certificate verifying successful completion of medium-term formal training of between 97 and 183 days. 2508,12 Vocational training of unemployed people under Priority Axis 7 Promoting quality employment and participation in the labour market of OP 2014LT16MAOP001 Unemployed people who successfully complete short-term formal training All eligible costs Number of participants who have received a certificate verifying successful completion of short-term formal training of 96 days or less 872,66 Vocational training of unemployed people under Priority Axis 7 Promoting quality employment and participation in the labour market of OP 2014LT16MAOP001 Unemployed people who successfully complete non- formal training All eligible costs Number of participants who have received a certificate verifying successful completion of non- formal training 1136,97
2. Adjustment of amounts The amounts set out above may be adjusted by the second quarter of each year by taking into account, in year N, the published inflation rate for consumer prices (Harmonized Index of Consumer Prices (HICP) at https://osp.stat.gov.lt/en/statistiniu-rodikliu-analize#/ for year N-1. The amounts may also be adjusted by replacing:
the national minimum wage rate in Lithuania;
the maximum expenses that cover vocational training;
the training scholarship coefficient laid down in the Republic of Lithuanian Law of the Employment Support;
the 1 kilometre tariff fee approved by the Order of the Minister of Social Security and Labour (20 July, 2010, Order No A1-352 on 1 kilometre tariff approval) in the calculation method; and
the indirect costs flat rate stated in The Application of Flat rate to Indirect Project Costs Scheme approved by the Order of the Minister of Finance (8 October, 2014, Order No 1K-316 on the projects administration and financing regulation approval);
in the calcualtion method whereby the total cost of vocational training consists of the total of: vocational training services costs, vocational training scholarships costs, travel expenses to the place of vocational training and back, accommodation costs, costs of compulsory health screening and vaccination against infectious diseases and indirect costs.
ANNEX XII Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Poland
1.1.2.3.4.5. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Transnational mobility projects for young persons aged 18-35 at risk of social exclusion; provision of internships, apprenticeships and other work-related activities abroad. Priority axis IV of the ESF Knowledge Education Development programme 2014PL05M9OP001 Daily rate for participants' stay abroad during a transnational mobility project. Daily allowance related to the participants' stay abroad. Number of calendar days spent abroad by a participant. Destination country Amount Austria 57,13 Belgium 57,13 Bulgaria 57,13 Croatia 44,97 Cyprus 59,37 Czech Republic 57,13 Denmark 66,07 Estonia 44,97 Finland 59,37 France 61,60 Germany 51,67 Greece 53,90 Hungary 53,90 Ireland 61,60 Italy 57,13 Latvia 51,67 Lithuania 44,97 Luxemburg 59,37 Malta 51,67 Netherlands 63,83 Portugal 49,43 Romania 53,90 Slovakia 51,67 Slovenia 44,97 Spain 51,67 Sweden 63,83 United Kingdom 69,30 Transnational mobility projects for young persons aged 18-35 at risk of social exclusion; provision of internships. apprenticeships and other work-related activities abroad. Priority axis IV of the ESF Knowledge Education Development programme 2014PL05M9OP001 Daily rate for stay abroad during a transnational mobility project for participants with severe diabilities. Daily allowance related to the participants' stay abroad. Number of calendar days spent abroad by a participant with a severe disability. Destination country Amount Austria 74 Belgium 74 Bulgaria 74 Croatia 58 Cyprus 77 Czech Republic 74 Denmark 86 Estonia 58 Finland 77 France 80 Germany 67 Greece 70 Hungary 70 Ireland 80 Italy 74 Latvia 67 Lithuania 58 Luxemburg 77 Malta 67 Netherlands 83 Portugal 64 Romania 70 Slovakia 67 Slovenia 58 Spain 67 Sweden 83 United Kingdom 90 Transnational mobility projects for young persons aged 18-35 at risk of social exclusion; provision of internships. apprenticeships and other work-related activities abroad. Priority axis IV of the ESF Knowledge Education Development programme 2014PL05M9OP001 Daily rate for a mentor accompanying a group of participants during their stay abroad within a transnational mobility project. Daily allowance related to the mentors' stay abroad. Number of calendar days spent abroad by a mentor; the group needs to consist of at least 4 participants on the day of the mentor going abroad. Destination country Amount Austria 75,77 Belgium 75,77 Bulgaria 75,77 Croatia 53,90 Cyprus 75,77 Czech Republic 75,77 Denmark 85,93 Estonia 53,90 Finland 75,77 France 75,77 Germany 64,83 Greece 75,77 Hungary 75,77 Ireland 85,93 Italy 75,77 Latvia 64,83 Lithuania 53,90 Luxemburg 75,77 Malta 64,83 Netherlands 85,93 Portugal 64,83 Romania 75,77 Slovakia 64,83 Slovenia 53,90 Spain 64,83 Sweden 85,93 United Kingdom 85,93 Transnational mobility projects for young persons aged 18-35 at risk of social exclusion; provision of internships. apprenticeships and other work-related activities abroad. Priority axis IV of the ESF Knowledge Education Development programme 2014PL05M9OP001 Daily rate for an accompanying person for a participant with a severe disability during his/her stay abroad within a transnational mobility project. Daily allowance related to the accompanying persons' stay abroad. Number of calendar days of the accompanying persons' stay abroad. Destination country Amount Austria 75,77 Belgium 75,77 Bulgaria 75,77 Croatia 53,90 Cyprus 75,77 Czech Republic 75,77 Denmark 85,93 Estonia 53,90 Finland 75,77 France 75,77 Germany 64,83 Greece 75,77 Hungary 75,77 Ireland 85,93 Italy 75,77 Latvia 64,83 Lithuania 53,90 Luxemburg 75,77 Malta 64,83 Netherlands 85,93 Portugal 64,83 Romania 75,77 Slovakia 64,83 Slovenia 53,90 Spain 64,83 Sweden 85,93 United Kingdom 85,93 Transnational mobility projects for young persons aged 18-35 at risk of social exclusion; provision of internships. apprenticeships and other work-related activities abroad. Priority axis IV of the ESF Knowledge Education Development programme 2014PL05M9OP001 Daily rate for hosting a group of partcipants in transnational mobility projects. All costs of the hosting organistion related to providing assistance and support within the transnational mobility project are covered by the daily rate. Number of calendar days of hosting a group of participants. If the group size is lower than 8 particpants on the day of the group going abroad, the hosting organisation's rate is reduced proportionally. A minimum group size of 4 is required (the rate would be reduced by 50 % in that case). Destination country Amount Denmark. Ireland. Luxembourg. Netherlands. Austria. Sweden 241 Belgium. France. Italy. Finland. Germany. United Kingdom. 214 Czech Republic. Greece. Spain. Cyprus. Malta. Portugal. Slovenia 137 Bulgaria. Estonia. Croatia. Latvia. Lithuania. Hungary. Romania. Slovakia 74
2. Adjustments of amounts. In the event of changes in the Erasmus+ national rates, which form the basis for the unit costs set in this regulation, the managing authority may adjust the rates accordingly. If the Erasmus+ rates change, the same change may be reflected in the respective standard scale of unit costs for new calls (i.e. calls launched after the new Erasmus+ rates come into force). For operations 1-4, the formula used to update the respective daily rates is (14 × A + 46 × B ) / 60, where A represents the daily rate from the Polish ERASMUS+ programme for the first 14 days of the stay abroad and B the remaining 46 days.
ANNEX XIII Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Romania
1.1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in LEI) Subsidies paid to employers for hiring specified categories of workers under Priority Axes 1. 2. 3. 4 and 5 of the Human Capital Operational Programme (2014RO05M9OP001) Monthly subsidy paid to an employer for each person employed on an open-ended contract. All costs related to the employment subsidy Number of months in employment
900 per month for up to 12 months for every employer who hires on an open ended contract for a minimum period of 18 months
a graduate of an education institution.
an unemployed over 45 years old.
a long term unemployed.
a young NEET.
unemployed who are single parents of mono-parental families
900 lei/month for up to 18 months paid for every employer who hires a person with disabilities (except those hired under legal obligation) on an open ended contract for a minimum period of 18 months.
900 lei/month for up to 5 years for employers who hire with full-time contracts unemployed persons who within 5 years from the date of employment fulfil the conditions for requiring partial early retirement pension or old age pension
2. Adjustment of amounts The rates set out here may be adjusted by any amendment of the rates set out by law no. 76/2002 on the unemployment insurance system and employment stimulation. Such changes will take effect on the same date as the revisions to the above-mentioned law come into force.
ANNEX XIV Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to all Member States specified.
1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Operations supporting participation in Education activities (from early childhood education to tertiary level. including formal vocational education and training) in all ESF operational programmes Participants in an academic year of education All eligible costs of the operation. Number of participants with verified attendance in an academic year of education. differentiated by ISCED classification. See point 3
2. Adjustment of Amounts. N/A
3. Amounts per particiaption in formal education (in EUR) Education level AT BE BG CY CZ DE EE FI HU IE IT ES HR Early childhood education ED0 6252 n/a 1415 2700 2040 6662 2941 9897 2439 n/a 3676 3261 2198 Early childhood educational development ED01 6937 n/a n/a n/a n/a 9214 n/a 15714 n/a n/a n/a 3039 n/a Pre-primary education ED02 6127 5893 1415 2700 2040 5793 n/a 8493 n/a 4986 3676 3330 2716 Primary education ED1 8113 7744 898 6594 2079 6201 3426 7952 1287 6471 5176 3816 4592 Primary and lower secondary education (levels 1 and 2) ED1_2 9669 8327 986 6990 2650 7060 3517 9485 1318 6925 5396 4181 2181 Lower secondary education ED2 11233 9563 1089 7756 3456 7607 3711 12511 1351 8200 5747 4881 n/a Lower secondary education — general ED24 11233 n/a 1130 7756 3463 7607 3691 12511 1329 8200 5748 4881 n/a Lower secondary education — vocational ED25 n/a n/a n/a n/a 2089 n/a 5930 n/a 4421 n/a 5566 n/a n/a Upper secondary education ED3 10785 n/a 1036 7980 3134 7708 3488 7838 3172 8496 5650 5071 1995 Upper secondary and post-secondary non-tertiary education (levels 3 and 4) ED3_4 10127 10109 1039 7886 3061 6846 3603 7838 3271 9252 5995 5071 1995 Upper secondary education — general ED34 9395 n/a 921 7281 2629 8045 3194 7199 3288 n/a n/a 4495 n/a Upper secondary and post-secondary non-tertiary education — general (levels 34 and 44) 9395 10271 921 7281 2450 7988 3194 7199 3288 n/a n/a 4495 n/a Upper secondary education — vocational ED35 11690 n/a 1145 11881 3311 7368 4017 8081 2820 n/a n/a 6188 2826 Upper secondary and post-secondary non-tertiary education — vocational (levels 35 and 45) 10552 10000 1151 11020 3296 6051 4023 8081 3237 n/a n/a 6188 2826 Post-secondary non-tertiary education ED4 1341 n/a 2135 n/a 710 3854 4022 n/a 3952 10628 n/a n/a n/a Post-secondary non-tertiary education — general ED44 n/a n/a n/a n/a 660 6918 n/a n/a n/a n/a n/a n/a n/a Post-secondary non-tertiary education — vocational ED45 1341 n/a 2135 n/a 931 3539 4022 n/a 3952 10628 n/a n/a n/a Short cycle tertiary education ED5 12098 9089 n/a 1241 6928 5963 n/a n/a 1994 n/a 4000 4883 n/a Tertiary education (levels 5-8) ED5-8 9105 7592 885 3637 1849 6450 2712 10199 1837 6562 2197 3637 3258 Tertiary education excluding short-cycle tertiary education (levels 6-8) ED6-8 8525 7534 885 3884 1836 6450 2712 10199 1829 6562 2191 3309 n/a Education level FR LT LU LV MT NL PL PT RO SE SI SK UK Early childhood education ED0 5259 1853 15898 2534 4731 6065 1759 2367 916 13267 4433 2037 3978 Early childhood educational development ED01 n/a 2178 n/a n/a n/a n/a n/a n/a 1606 14879 5344 n/a 4008 Pre-primary education ED02 5259 1789 15898 2534 4731 6065 1759 2367 893 12692 4067 2037 3973 Primary education ED1 4950 2197 16253 3147 5173 6681 2627 3718 674 10390 4985 2348 8777 Primary and lower secondary education (levels 1 and 2) ED1_2 5828 2141 16575 3143 6048 7757 2638 4227 919 10568 4794 2410 8898 Lower secondary education ED2 6931 2108 17103 3136 7720 9352 2663 5116 1217 10974 4393 2467 9142 Lower secondary education — general ED24 6931 2083 17103 3138 7738 8228 2663 n/a 1217 n/a 4393 2449 9464 Lower secondary education — vocational ED25 n/a 3332 n/a 2944 5821 12367 n/a n/a n/a n/a n/a 3150 6370 Upper secondary education ED3 9225 2362 16722 3087 5162 6995 2336 4411 1236 10858 3482 2607 8701 Upper secondary and post-secondary non-tertiary education (levels 3 and 4) ED3_4 9145 2485 16199 3121 5065 6995 2230 4411 1137 10535 3482 2629 8701 Upper secondary education — general ED34 9106 2043 14368 3152 5230 7589 2101 n/a 2820 7908 4241 1932 8895 Upper secondary and post-secondary non-tertiary education — general (levels 34 and 44) 9087 2043 14368 3152 5238 7589 2101 n/a 2820 7856 4241 1932 8895 Upper secondary education — vocational ED35 9425 3224 18265 2995 4670 6710 2520 n/a 47 14773 3717 2978 8295 Upper secondary and post-secondary non-tertiary education — vocational (levels 35 and 45) 9238 3136 17333 3082 4518 6709 2317 n/a 120 13882 3717 2984 8295 Post-secondary non-tertiary education ED4 6088 3030 1189 3667 4463 5056 1057 n/a 423 4146 n/a 3052 n/a Post-secondary non-tertiary education — general ED44 6808 n/a n/a n/a 6598 n/a n/a n/a n/a 5639 n/a n/a n/a Post-secondary non-tertiary education — vocational ED45 5908 3030 1189 3667 4391 5056 1057 n/a 423 3613 n/a 3052 n/a Short cycle tertiary education ED5 8752 n/a 22145 3050 6322 6205 7791 n/a n/a 6339 1725 3352 1731 Tertiary education (levels 5-8) ED5-8 6289 2736 33659 2449 8819 6081 2384 1293 1772 10477 3869 1937 2257 Tertiary education excluding short-cycle tertiary education (levels 6-8) ED6-8 5479 2736 34862 2349 9307 6081 2374 1293 1772 10828 4200 1913 2304
Versions
Cited by
- Commission Delegated Regulation (EU) 2017/2416 of 20 October 2017 amending Delegated Regulation (EU) 2015/2195 on supplementing Regulation (EU) No 1304/2013 of the European Parliament and of the Council on the European Social Fund, regarding the definition of standard scales of unit costs and lump sums for reimbursement of expenditure by the Commission to Member States, and correcting that Delegated Regulation Regulation · Grade B
Sweden submitted data for amending the standard scales of unit costs currently set out in Delegated Regulation (EU) 2015/2195. The Commission accordingly amended the rates set out in Annex I to Delegated Regulation (EU) 2015/2195 for operations supported under priority axis 1 Supply of skills of the Operational Programme (Nationellt socialfondsprogram för investering för tillväxt och sysselsättning 2014-2020) (CCI- 2014SE05M9OP001) in Delegated Regulation (EU) 2017/2016. However, the Commission erred by not also amending the rates set out for priority axes 2 and 3 of the same operational progr