Commission Implementing Regulation (EU) 2017/6 of 5 January 2017 on the European Rail Traffic Management System European deployment plan
Grade B
mapped from publisher markup. A grade says how a document's structure was obtained, not how reliable the law is.
Address https://gelex.eu/eli/EU/regulation/2017/6@2017-01-05/en
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 1315/2013 of the European Parliament and of the Council of 11 December 2013 on Union guidelines for the development of the trans-European transport network and repealing Decision No 661/2010/EU, and in particular Article 47(2) thereof,
Whereas:
(1) The aim of the European Rail Traffic Management System (ERTMS) European deployment plan is to ensure that vehicles referred to in point 1.1 of the Annex to Commission Regulation (EU) 2016/919 equipped with ERTMS can gradually have access to an increasing number of lines, ports, terminals and marshalling yards without needing Class B systems in addition to ERTMS. The ERTMS European deployment plan established in the Commission Decision 2012/88/EU should be adapted in order to take into account the state of ERTMS deployment made by the Member States, and to align it with the requirements of Article 39(2) of Regulation (EU) No 1315/2013 and with the definition of core network corridors provided for in Article 2(14) of Regulation (EU) No 1316/2013 of the European Parliament and of the Council. This plan in combination with the National Implementation Plan as referred to in point 7.4.4 of the Annex to Regulation (EU) 2016/919 should give sufficient visibility to the vehicles owners to allow appropriate business planning.
(2) A deployment plan for the core network corridors should include stations, junctions, access to core maritime ports and inland ports, airports, rail/road terminals and infrastructure components as referred to in Article 11 of Regulation (EU) No 1315/2013 as they are essential to achieve interoperability in the European railway network.
(3) Full compliance with Regulation (EU) 2016/919 is a critical prerequisite for ERTMS deployment. Member States have not yet reached this objective, in particular because they introduced national or project specific solutions.
(4) For new ERTMS track-side deployment, Member States should use the most recent set of specifications, referred to in Annex A to Regulation (EU) 2016/919, which corrects errors and misinterpretations of the previous baseline, leads to simpler technical solutions and ensures compatibility with Baseline 3 on-board units.
(5) Trackside implementation rules are complementary to the on-board implementation rules laid down in the Regulation (EU) 2016/919; therefore it is necessary to align the ERTMS European Deployment Plan with the technical specifications for interoperability relating to the control command and signalling subsystems set out in that Regulation.
(6) ERTMS deployment at cross-border sections can be technically challenging and therefore should be the subject of priority intervention by the Union, the Member States and the infrastructure managers concerned. Rail freight corridors within the meaning in Regulation (EU) No 913/2010 of the European Parliament and of the Council could also play a crucial role in ERTMS deployment on cross-border sections, in particular by implementing coordinated solutions.
(7) As synchronisation of cross-border deployment is an important element for the railway undertakings' business cases, the infrastructure managers concerned should sign an agreement ensuring coordination of deployment dates and technical solutions. In case of a disagreement, the Commission can provide support in identifying solutions.
(8) In order to follow the progress of ERTMS deployment on the core network corridors, Member States should notify to the Commission the timely implementation of their sections by means of the TENtec system and the European Register of Infrastructure. Postponement of the relevant dates can be granted at the Member State's request and only in exceptional circumstances.
(9) The revision of Regulation (EU) No 1316/2013 could have consequences on the alignment of the core network corridors. This Regulation should be reviewed accordingly. This Regulation sets out implementation dates of those corridor sections where ERTMS can be put into operation by 2023 at the latest. All dates beyond 2023 will be subject to review by 31 December 2023 in relation to the time horizon defined in Regulation (EU) No 1315/2013 with the objective of a realistic implementation timeline and to identify possibilities for earlier implementation dates.
(10) As of the date of application of this Regulation, which is an implementing act within the meaning of Article 13 of Regulation (EU) 2016/919, points 7.3.1, 7.3.2, 7.3.2.1, 7.3.2.2, 7.3.2.4, 7.3.2.5, 7.3.2.6, 7.3.4 and 7.3.5 of Annex III to Decision 2012/88/EU will cease to apply. However, point 7.3.2.3 should not be covered by this Regulation, because it is beyond the scope of its legal basis. Therefore point 7.3.2.3 of Annex III to Decision 2012/88/EU should continue to apply until the adoption of another implementing act.
(11) Regarding high-speed lines located on the core network corridors covered by this Regulation, if one of the conditions laid down in point 7.3.2.3 in Annex III to Decision 2012/88/EU is fulfilled before the date specified for the same section in Annex I, the railway infrastructure managers should fit ERTMS trackside on that section in accordance with that provision.
(12) The measures provided for in this Regulation are in accordance with the opinion of the Committee referred to in Article 52 of Regulation (EU) No 1315/2013,
HAS ADOPTED THIS REGULATION:
Article 1 Subject matter and scope
1. This Regulation lays down the timetable for the deployment of the European Rail Traffic Management System ('ERTMS') on core network corridors as set out in Annex I.
2. This Regulation does not apply to ERTMS on-board implementation laid down in point 7.3.3 of Annex III to Decision 2012/88/EU.
Article 2 ETCS specific implementation rules regarding trackside installations
1. Railway infrastructure managers shall equip the core network corridors with ERTMS and put ERTMS into operation in those corridors at the latest by the dates specified in Annex I to this Regulation, including in railway stations and junctions. The railway link to the elements listed in Annex II of Regulation (EU) No 1315/2013 and to the infrastructure components as referred to in Article 11 of Regulation (EU) No 1315/2013 that are located on the core network corridor shall be equipped and put into operation at the date specified for the respective core network corridor section. Deployment shall be in compliance with Articles 1(4), 7(2c) and 39(3) of Regulation (EU) No 1315/2013.
2. A core network corridor shall be considered equipped with ERTMS when ERTMS is authorised for the placing in service in accordance with Article 15 of Directive 2008/57/EC of the European Parliament and of the Council or Article 18 of Directive (EU) 2016/797 of the European Parliament and of the Council, allowing passenger and freight traffic in both directions in particular in case of works or disturbances, and, to the extent necessary for operations of ERTMS-only equipped vehicles, sidings.
3. Railway infrastructure managers, acting in cooperation, shall make an effort to equip and put into operation ERTMS on cross-border sections simultaneously, in a technically consistent manner. The railway infrastructure managers shall, after having consulted the railway undertakings affected, sign an agreement on technical and operational aspects of the deployment for each cross-border section. The railway infrastructure managers shall conclude such an agreement not later than one year before the earlier of the deployment dates for the given cross-border section. This agreement shall provide transitional provisions for taking into account the needs of the railway undertakings' cross-border operations. In case of a disagreement, the Member States concerned shall initiate an active dialogue in order to find common convergent solutions. They may request support from the Commission. The Member States shall notify such agreements to the Commission not later than one month after the conclusion.
4. The completion dates set out in agreements for projects co-funded by the Union which are earlier than the dates set out in Annex I shall prevail over those dates.
5. Member States may decide to keep the existing Class B systems, as defined in point 2.2 of the Annex to Regulation (EU) 2016/919. However, by the dates set out in Annex I, the vehicles referred to in point 1.1 of the Annex to Regulation (EU) 2016/919 which are equipped with ERTMS in a version compatible with the track-side equipment, shall be given access to those lines and to the infrastructure components as referred to in Article 11 of Regulation (EU) No 1315/2013 without requiring them to be equipped with a Class B system.
Article 3 Notifications
1. Once ERTMS is put into operation on a core network corridor section, the Member State concerned shall notify the Commission of that fact within one month, through the systems established under Article 49(1) of Regulation (EU) No 1315/2013 and Article 5(1) of Commission Implementing Decision 2014/880/EU.
2. Member States shall notify the Commission of any delays in putting ERTMS in operation on a given core network corridor section to be equipped. The railway infrastructure managers shall inform the Member States about those delays accordingly.
3. When notifying the delays referred in paragraph 2, the Member State concerned shall send to the Commission a file containing a technical description of the project and specifying a new date for putting ERTMS into operation. The file shall specify the causes for the delay and shall indicate the corrective measures taken by the railway infrastructure manager.
4. If the delay results from an exceptional circumstance, the Commission may accept to postpone the relevant date by a maximum of three years. If a postponement is granted, the Member State shall make the necessary amendments to its national implementation plan as referred to in point 7.4.4 of the Annex to Regulation (EU) 2016/919 within one month of granting that postponement. Exceptional circumstance referred to in the first subparagraph means a circumstance resulting from the planning phase and which is related to specific geological findings, environmental or species protection, archaeological finds, permitting procedures, implementation of an environmental impact assessment pursuant to Directive 2014/52/EU of the European Parliament and of the Council; or a circumstance resulting from the construction and authorisation phases that are out of the control of the project promoter and do not fall into the category of the usual risks that should be addressed at project management level in this type of projects.
5. If ERTMS specifications set out in Regulation (EU) 2016/919 are changed by legislative act in an incompatible way the Member States shall provide the Commission with an analysis of the impact of the application of the modified legal reference on their network and on the ERTMS planning without unreasonable delay, but at latest at the time of the formal opinion of the Committee referred to in Article 51 of Directive (EU) 2016/797. If a direct impact of the changes can be demonstrated in terms of cost or timeline for specific implementations, Annex I shall be adapted accordingly.
Article 4 Review
Not later than 31 December 2023, the Commission shall, after consultation with the Member States, and with the assistance of the European ERTMS Coordinator referred to in Article 45 of Regulation (EU) No 1315/2013, carry out a review of the dates after 1 January 2024 that are laid down in Annex I to this Regulation.
Article 5 References
References to Annex III to Decision 2012/88/EU shall be construed as references to this Regulation and shall be read in accordance with the correlation table in Annex II.
Article 6 Entry into force
This Regulation shall enter into force on 26 January 2017.
This Regulation shall be binding in its entirety and directly applicable in all Member States. Done at Brussels, 5 January 2017. For the Commission The President Jean-Claude Juncker
ANNEX
ANNEX I
ANNEX II Correlation table
Decision 2012/88/EU This Regulation Point 7.3.1 of Annex III Article 1 Point 7.3.2 of Annex III Article 1 and 2 Point 7.3.2.1 of Annex III Article 2(1) Point 7.3.2.2 of Annex III Article 2(1) Point 7.3.2.4 of Annex III — Point 7.3.2.5 of Annex III Article 3(1) Point 7.3.2.6 of Annex III Article 3(2), (3) and (4) Point 7.3.4 of Annex III Annex I Point 7.3.5 of Annex III. Article 2(1)
Versions
Cited by
- Council Decision (EU) 2021/1742 of 23 September 2021 on the position to be adopted, on behalf of the European Union, within the EEA Joint Committee concerning the amendment of Annex XIII (Transport) to the EEA Agreement (3rd and 4th Railway Packages) (Text with EEA relevance) Decision · Grade B
Commission Implementing Regulation (EU) 2017/6,
- Commission Implementing Decision (EU) 2026/2059 of 17 September 2026 laying down rules for the application of Directive (EU) 2016/797 of the European Parliament and of the Council as regards a request from Poland not to apply the requirement to install ETCS on-board of locomotives set out in Commission Implementing Regulation (EU) 2023/1695 (notified under document C(2026) 6338) (Only the Polish text is authentic) Decision · Grade B
As an alternative provision, Poland proposes to apply point 7.4.2.1.2(3)(a) of the Annex to Commission Regulation (EU) 2016/919, as last in force on 27 September 2023. In accordance with that provision, the requirement to be equipped with ETCS is not to apply to new vehicles that do not circulate on specified types of lines. Vehicles circulating only on line No 65 do not require the installation of ETCS, since line No 65 is not a high-speed line, not a line on the corridors defined in Annex I to Commission Implementing Regulation (EU) 2017/6, or a line ensuring the connections to the main Euro
- Commission Implementing Decision (EU) 2024/378 of 25 January 2024 accepting a request submitted by Spain pursuant to Article 7(4) of Directive (EU) 2016/797 of the European Parliament and of the Council to not apply Commission Regulation (EU) 2016/919, to 58 vehicles Stadler E6000 (notified under document C(2024) 388) (Only the Spanish text is authentic) Decision · Grade B
According to point 7.4.2.2 of the Annex to Implementing Regulation (EU) 2023/1695, existing vehicles should be equipped with ETCS. However, Stadler E6000 vehicles do not have ETCS/ERTMS equpiment installed on board. Therefore, during process of vehicle type authorization (number 1-075-0005-8-001-001), the European Railway Agency set specific restrictions of use. Based on those restrictions, at the present time those locomotives cannot be operated on lines equipped with class A (ETCS/ERTMS) signalling system, in the corridors defined in Annex I of Commission Implementing Regulation (EU) 2017/6
- Commission Implementing Decision (EU) 2018/1723 of 26 October 2018 on the Rail Baltica cross-border project on the North Sea-Baltic Core Network Corridor (notified under document C(2018) 6969) (Only the Estonian, Finnish, Latvian, Lithuanian, Polish and Swedish texts are authentic) Decision · Grade B
the European Rail Traffic Management System (ERTMS) shall be deployed to achieve the full interoperability, in accordance with Commission Implementing Regulation (EU) 2017/6, in Estonia, Latvia, Lithuania and Poland;
- Commission Implementing Regulation (EU) 2026/693 of 19 March 2026 amending Implementing Regulation (EU) 2023/1695 as regards new testing specifications, a set of reduced specifications and transitional measures (Text with EEA relevance) Regulation · Grade B
Trackside installations Articles 1 and 2 and Annex I to Commission Implementing Regulation (EU) 2017/6 shall apply as referred to in Article 47 of Regulation (EU) No 1315/2013 of the European Parliament and of the Council and any update to this Regulation. Euroloop and radio infill data transmission shall not be installed, nor operated, except at lines/trackside areas which are listed as specific case in point 7.7. The trackside installations shall comply with the harmonised engineering rules referenced in this TSI and shall be operated without restriction under the operating rules set out in
- Regulation (EU) 2021/1060 of the European Parliament and of the Council of 24 June 2021 laying down common provisions on the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund, the Just Transition Fund and the European Maritime, Fisheries and Aquaculture Fund and financial rules for those and for the Asylum, Migration and Integration Fund, the Internal Security Fund and the Instrument for Financial Support for Border Management and Visa Policy Regulation · Grade B
Ensures interoperability of the rail network, and, where relevant, reports on the deployment of ERTMS according to Commission Implementing Regulation (EU) 2017/6.
- Commission Implementing Regulation (EU) 2020/387 of 9 March 2020 amending Regulations (EU) No 321/2013, (EU) No 1302/2014 and (EU) 2016/919 as regards the extension of the area of use and transition phases (Text with EEA relevance) Regulation · Grade B
if they are intended exclusively for operations in one Member State outside the corridors specified in Annex I to Implementing Regulation (EU) 2017/6 and outside the lines ensuring the connections to the main European ports, marshalling yards, freight terminals and freight transport areas as referred to in Annex II to Regulation (EU) No 1315/2013;
- Commission Implementing Regulation (EU) 2019/776 of 16 May 2019 amending Commission Regulations (EU) No 321/2013, (EU) No 1299/2014, (EU) No 1301/2014, (EU) No 1302/2014, (EU) No 1303/2014 and (EU) 2016/919 and Commission Implementing Decision 2011/665/EU as regards the alignment with Directive (EU) 2016/797 of the European Parliament and of the Council and the implementation of specific objectives set out in Commission Delegated Decision (EU) 2017/1474 (Text with EEA relevance) Regulation · Grade B
in paragraph 5, the reference to points 7.3.2.1, 7.3.2.2 and 7.3.2.3 of Decision 2012/88/EU is replaced by a reference to Article 2(1) of Commission Implementing Regulation (EU) 2017/6 (*) and point 7.4.1.1 of the Annex to this Regulation. Commission Implementing Regulation (EU) 2017/6 of 5 January 2017 on the European Rail Traffic Management System European deployment plan (OJ L 3, 6.1.2017, p. 6);
- Commission Implementing Regulation (EU) 2019/776 of 16 May 2019 amending Commission Regulations (EU) No 321/2013, (EU) No 1299/2014, (EU) No 1301/2014, (EU) No 1302/2014, (EU) No 1303/2014 and (EU) 2016/919 and Commission Implementing Decision 2011/665/EU as regards the alignment with Directive (EU) 2016/797 of the European Parliament and of the Council and the implementation of specific objectives set out in Commission Delegated Decision (EU) 2017/1474 (Text with EEA relevance) Regulation · Grade B
Trackside installations Articles 1, 2 and Annex I to Commission Implementing Regulation (EU) 2017/6 of 5 January 2017 on the European Rail Traffic Management System European deployment plan shall apply as referred to in Article 47 of Regulation (EU) No 1315/2013. Trackside shall not install and operate the Euroloop and radio infill data transmission, except on already existing installations or planned projects that use those data transmission. Such planned projects shall be notified to the European Commission by 30 June 2020.
- Commission Implementing Regulation (EU) 2019/776 of 16 May 2019 amending Commission Regulations (EU) No 321/2013, (EU) No 1299/2014, (EU) No 1301/2014, (EU) No 1302/2014, (EU) No 1303/2014 and (EU) 2016/919 and Commission Implementing Decision 2011/665/EU as regards the alignment with Directive (EU) 2016/797 of the European Parliament and of the Council and the implementation of specific objectives set out in Commission Delegated Decision (EU) 2017/1474 (Text with EEA relevance) Regulation · Grade B
if they are intended exclusively for national service operated outside the corridors defined in point Annex I of Implementing Regulation (EU) 2017/6 and outside the lines ensuring the connections to the main European ports, marshalling yards, freight terminals and freight transport areas defined in Article 2(1) of Implementing Regulation (EU) 2017/6; or
- Commission Implementing Regulation (EU) 2023/1695 of 10 August 2023 on the technical specification for interoperability relating to the control-command and signalling subsystems of the rail system in the European Union and repealing Regulation (EU) 2016/919 (Text with EEA relevance) Regulation · Grade B
Trackside installations Articles 1 and 2 and Annex I to Commission Implementing Regulation (EU) 2017/6 shall apply as referred to in Article 47 of Regulation (EU) No 1315/2013 of the European Parliament and of the Council and any update to this Regulation. Euroloop and radio infill data transmission shall not be installed, nor operated, except at lines/trackside areas which are listed as specific case in point 7.7. The trackside installations shall comply with the harmonised engineering rules referenced under index 13 (subset 40) and shall be operated without restriction under the operating ru
- P9_TA(2021)0327 Railway safety and signalling: Assessing the state of play of the ERTMS deployment European Parliament resolution of 7 July 2021 on railway safety and signalling: assessing the state of play of the European Rail Traffic Management System (ERTMS) deployment (2019/2191(INI)) 2022/C 99/01 Notice · Grade B
having regard to Commission Implementing Regulation (EU) 2017/6 of 5 January 2017 on the European Rail Traffic Management System European deployment plan,
- Position (EU) No 27/2021 of the Council at first reading with a view to the adoption of a Regulation of the European Parliament and of the Council laying down common provisions on the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund, the Just Transition Fund and the European Maritime, Fisheries and Aquaculture Fund and financial rules for those and for the Asylum, Migration and Integration Fund, the Internal Security Fund and the Instrument for Financial Support for Border Management and Visa Policy Adopted by the Council on 27 May 2021 2021/C 246/01 Notice · Grade B
Ensures interoperability of the rail network, and, where relevant, reports on the deployment of ERTMS according to Commission Implementing Regulation (EU) 2017/6.