Commission Delegated Regulation (EU) 2019/2170 of 27 September 2019 amending Delegated Regulation (EU) 2015/2195 on supplementing Regulation (EU) No 1304/2013 of the European Parliament and of the Council on the European Social Fund, regarding the definition of standard scales of unit costs and lump sums for reimbursement of expenditure by the Commission to Member States
Grade B
mapped from publisher markup. A grade says how a document's structure was obtained, not how reliable the law is.
Address https://gelex.eu/eli/EU/regulation/2019/2170@2019-09-27/en
Contents
- Preamble
- ANNEX
- ANNEX I
- ANNEX II Conditions for reimbursement of expenditure on the basis of standard scales of unit costs and lump sums to France
- 1.1.2.
- 1.1.2.4.5.
- ANNEX III Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Czechia
- 1.
- 3.
- ANNEX V Conditions for reimbursement of expenditure on the basis of standard scales of unit costs and lump sums to Malta
- 1.
- ANNEX IV
- ANNEX VI Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Italy
- 1.
- 2.
- ANNEX VII Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Slovakia
- 1.
- ANNEX IX Conditions for reimbursement of expenditure on the basis of unit costs and lump sums to the Netherlands
- 1.
- ANNEX XIII Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Romania
- 1.
- ANNEX VIII
- ANNEX XIV Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to all Member States specified.
- 1.
- ANNEX XV Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Cyprus
- 1.
- ANNEX X
- ANNEX XVII Conditions for reimbursement of expenditure on the basis of standard scales of unit costs and lump sums to Ireland
- 1.
- ANNEX XI
- ANNEX XXI Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Portugal
- 1.
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 1304/2013 of the European Parliament and of the Council of 17 December 2013 on the European Social Fund and repealing Council Regulation (EC) No 1081/2006, and in particular Article 14(1) thereof,
Whereas:
(1) With a view to simplifying the use of the European Social Fund ESF and reducing the administrative burden for beneficiaries, it is appropriate to increase the scope of standard scales of unit costs (short: unit costs) and lump sums available for reimbursement to Member States. The standard scales of unit costs and lump sums for reimbursement to Member States should be established on the basis of data submitted by Member States or published by Eurostat and on the basis of methods commonly agreed, including the methods set out in Article 67(5) and Article 68b(1) of Regulation (EU) No 1303/2013 of the European Parliament and of the Council.
(2) Taking into account the significant disparities between Member States regarding the level of costs for a particular type of operation, the definition and amounts of standard scales of unit costs and lump sums may differ according to the type of operation and the Member State concerned in order to reflect their specificities.
(3) France, Czechia, Malta, Italy, Slovakia, the Netherlands, Romania, Cyprus, Ireland and Portugal have submitted methods for either amending existing standard scales of unit costs, or defining additional standard scales of unit costs for reimbursement by the Commission concerning types of operation not yet covered by Commission Delegated Regulation (EU) 2015/2195.
(4) Ireland and France have submitted a method for defining lump sums.
(5) For the unit costs relating to operations supporting education and applicable to all Member States except Denmark, the amounts should be updated in line with latest available data from Eurostat. Furthermore, monthly rates should be introduced for operations of early childhood education and pre-primary education (ISCED level ED0, ED01 and ED02).
(6) Delegated Regulation (EU) 2015/2195 should therefore be amended accordingly,
HAS ADOPTED THIS REGULATION:
Article 1
Regulation (EU) 2015/2195 is amended as follows: (1) Annex II is replaced by the text in Annex I to this Regulation. (2) Annex III is replaced by the text in Annex II to this Regulation. (3) Annex V is replaced by the text in Annex III to this Regulation. (4) Annex VI is replaced by the text in Annex IV to this Regulation. (5) Annex VII is replaced by the text in Annex V to this Regulation. (6) Annex IX is replaced by the text in Annex VI to this Regulation. (7) Annex XIII is replaced by the text in Annex VII to this Regulation. (8) Annex XIV is replaced by the text in Annex VIII to this Regulation. (9) Annex XV is replaced by the text in Annex IX to this Regulation. (10) Annex XVII is replaced by the text in Annex X to this Regulation. (11) The text in Annex XI to this Regulation is added as Annex XXI.
(1) Annex II is replaced by the text in Annex I to this Regulation.
(2) Annex III is replaced by the text in Annex II to this Regulation.
(3) Annex V is replaced by the text in Annex III to this Regulation.
(4) Annex VI is replaced by the text in Annex IV to this Regulation.
(5) Annex VII is replaced by the text in Annex V to this Regulation.
(6) Annex IX is replaced by the text in Annex VI to this Regulation.
(7) Annex XIII is replaced by the text in Annex VII to this Regulation.
(8) Annex XIV is replaced by the text in Annex VIII to this Regulation.
(9) Annex XV is replaced by the text in Annex IX to this Regulation.
(10) Annex XVII is replaced by the text in Annex X to this Regulation.
(11) The text in Annex XI to this Regulation is added as Annex XXI.
Article 2
This Regulation shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
This Regulation shall be binding in its entirety and directly applicable in all Member States. Done at Brussels, 27 September 2019. For the Commission The President Jean-Claude Juncker
ANNEX
ANNEX I
(1) allowances paid to the participant; (2) activation costs incurred by the missions locales (3) entered vocational skills training leading to a certification, whether by: (4) entering training in lifelong learning; or (5) entering basic training; (6) started a company; or (7) found a job; or (8) has spent at least 80 working days in a (paid or not) professional environment (9) received a diploma or a confirmation of acquired competencies at the end of their training course; (10) found a job of at least one month duration; (11) inscribed in a further professional training course; (12) re-inscribed in their previous school curriculum after an interruption; or (13) gained access to a formal validation process of their aquired competencies. (1) Rhône-Alpes (CCI 2014FR16M2OP010) (2) and (3) Auvergne (CCI 2014FR16M0OP002) Pt_3_. 2. Training for the unemployed provided by accredited training organisations and supported by the following Operational Programmes: (15) received a diploma which is officially endorsed by a professional representation organisation or government office.; (16) received a confirmation of aquired competencies at the end of their training course; (17) found a job; (18) inscribed in a further professional training course; (19) re-inscribed in their previous school curriculum after an interruption; or (20) gained access to a formal validation process of their aquired competencies. Pt_6_. 2. Qualifying-certifying vocational training through public procurement under the ESF Operational Program of La Réunion (CCI 2014FR05SFOP005) (22) Priority Axis 1: Foster the development of a knowledge-based, competitive and innovative society. (23) Priority Axis 2: Supporting access to employment through skills and mobility development (24) Priority Axis 3: Promoting social inclusion and combating poverty by strengthening public training and support Pt_7_. 2. Graduate vocational health training under the ESF Operational Program of La Réunion (CCI 2014FR05SFOP005) (26) Priority Axis 1: Foster the development of a knowledge-based, competitive and innovative society. Grp. 11. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicator Amounts (in EUR) Garantie Jeunes supported under priority axis 1 Accompagner les jeunes NEET vers et dans l’emploi of the operational programme PROGRAMME OPÉRATIONNEL NATIONAL POUR LA MISE EN ŒUVRE DE L’INITIATIVE POUR L’EMPLOI DES JEUNES EN METROPOLE ET OUTRE-MER (CCI-2014FR05M9OP001) Young NEET with a positive result under Garantie Jeunes at the latest 12 months following the start of coaching Number of young NEETs who have one of the following results at the latest 12 months following the start of the coaching: or 6400 Training for the unemployed provided by accredited training organisations and supported by the Operational Programme Ile-de-France (CCI 2014FR05M0OP001) Participants with a successful outcome following a training course. All eligible costs of the operation. Number of participants with one of the following outcomes following a training course: If a participant achieves more than one succesful outcome following the training course, this shall only give rise to the reimbursement of one amount for that training. Category Sector Amount 1 Healthcare 3931 Safety of goods and people 2 Cultural, sports and leisure activities 4556 Services to people Handling of soft materials Agri-food, cooking Trade and sales Hosting, hotel industry, catering Health and safety at work 3 Secretarial and office automation training 5695 Social work Electronics Hairdressing, beauty and wellness Vehicle and equipment maintenance Transport, handling, storing 4 Agriculture 7054 Environment Building and public works Printing and publishing techniques Participants with a successful outcome following a training course. All eligible costs of the operation. Number of participants with one of the following outcomes following a training course: For category 5, additionally, number of participants with a successful outcome as described above who are entitled to receive an allowance from the Region Auvergne-Rhône-Alpes. If a participant achieves more than one succesful outcome following the training course, this shall only give rise to the reimbursement of one amount for that training. Category Sector Amount 1 Transport, logistics, and tourism 4403 Banking, insurance Management, business administration, creation of enterprises Services for individuals and communities 2 Health and social work, recreational, cultural and sporting activities 5214 Restaurant, hotel and food industries Trade Handling of soft materials and wood; graphic industries 3 Building and public works 7853 Process industries Mechanics, metal working Agriculture, fisheries Communication, information, art and entertainment 4 Maintenance 9605 Electricity, electronics IT and telecommunication 5 Allowances 2259 Qualifying and Professional Training under the Operational Programme ESF La Réunion (CCI 2014FR05SFOP005) — priority axis1. Foster the development of a knowledge-based, competitive and innovative society. Provisison of training leading to a qualification, skill or certification All eligible costs of the operation. Number of months per participant of qualifying and professional training including the months in the training centre and within a company. Catégorie A1: 3131 Catégorie B1: 4277 Catégorie C1: 2763 Catégorie D1: 2470 Catégorie D2: 2332 Catégorie D3: 3465 Catégorie E1: 2841 Catégorie E2: 3392 Catégorie E3: 2569 Catégorie F1: 2319 Catégorie F2: 2990 Catégorie F3: 2910 Catégorie G1: 2381 Adult Prequalification Vocational Training under the Operational Programme ESF La Réunion (CCI 2014FR05SFOP005) — priority axis 1. Foster the development of a knowledge-based, competitive and innovative society. Provision of vocational training leading to access to qualifying training. All eligible costs of the operation. Number of months per participant of prequalifying training with a maximum duration of 5 months. Catégorie H1: 2805 Participants who have successfully completed individual professional training. All eligible costs of the operation. Number of participants who have obtained a recognised qualification/certification within 4 months of the end of the training Catégorie Niveau Coût d’unité d’oeuvre A III 17509,80 B IV 14908,87 C V 13847,37 D VI 9562,39 Participants who have successfully completed the vocational health training. All eligible costs of the operation Number of participants having successfully completed their training year (passing on to a higher year or graduating). Code Amount (value 2017) State Diploma of care-giver Initial AS-INIT 6150,99 Partial AS-PART 3444,55 State Diploma of nurse Year 1 IFSI-A1 9038,52 Year 2 IFSI-A2 7341,99 Year 3 IFSI-A3 5620,57 State Diploma of midwife Year 1 ESF-A1 15752,29 Year 2 ESF-A2 9878,55 Year 3 ESF-A3 11038,54 Year 4 ESF-A4 5318,95 State Diploma of ambulance driver IFA-AMB 5886,73 State Diploma Childcarer Assistant IFAP 8102,58 State Diploma Childcarer EP 12173,43 State Diploma of Occupational Therapist Year 1 IRFE-A1 12570,94 Year 2 IRFE-A2 7557,72 Year 3 IRFE-A3 6611,51 State Diploma of massage physiotherapy Year 1 IFMK-A1 5761,21 Year 2 IFMK-A2 4638,97 Year 3 IFMK-A3 4783,31 Year 4 IFMK-A4 4493,41 State diploma of psychomotor specialist Year 1 IRFP-A1 9504,44 Year 2 IRFP-A2 8650,03 Year 3 IRFP-A3 6008,29 (1) Scale review formula: B — B0 (Im/I0) (2) B — amount of revised scale N (3) B0 — amount of the initial scale (N-1). (4) I0 — reference value, the last known value of the SYNTEC index as of January 1, N-1 (5) Im — I0-12 months Grp. 2. Adjustment of amounts The amount of unit cost 1. is based partly on a standard scale of unit cost funded entirely by France. Out of the 6400 EUR, 1600 EUR correspond to the standard scale of unit cost set out by the instruction ministérielle du 11 octobre 2013 relative à l’expérimentation Garantie Jeunes prise pour l’application du décret 2013-80 du 1er octobre 2013 ainsi que par l’instruction ministérielle du 20 mars 2014 to cover the costs borne by the Youth Public Employment Services Missions Locales to coach each NEET entering the Garantie Jeunes. Unit cost 1. shall be updated by the Member State in line with adjustments under national rules to the standard scale of unit cost of 1600 EUR mentioned in paragraph 1 above that covers the costs borne by the Youth Public Employment Services. The amount of unit costs 2. and 3. are based on publicly procured prices for training hours in the respective fields and geographical areas. These amounts will be adjusted when the procurement process for the underlying training courses is repeated according to the following formula: New price (excl. VAT) = Old price (excl. VAT) x (0,5 + 0,5 x Sr/So) Sr is the index of employed persons INSEE (identifyer 1567446) of the last monthly publication at the date of the adjustement So is the index of employed persons INSEE (identifyer 1567446) of the monthly publication at the date of submission of the tender for the first adjustment then, for the following adjustments, of the monthly publication of the anniversary date of submission of the tender The amounts of the unit costs 4, 5 and 7 may be adjusted based on the Reunion inflation rate (INSEE index) – reference year 2017. The amounts for unit costs 6 may be adjusted according to the price review mechanism in the event of a renewal of the tender of the Reunion Region. The amounts of the scales are updated annually, as of 1 January N on the basis of the latest index known, according to the following formula: The intermediate calculations will be carried out with four decimal places, the scale comprising two decimals and the coefficient applicable to rounded P0, if any at the top thousandth. The selected BSCU scale is the value of 2017. The reference year is therefore 2017 as a starting point for indexing. Indexing applies to courses that started in year N. Grp. 3. Definition of lump sums Type of operations Indicator name Category of costs Measurement unit for the indicator Amounts (in EUR) Technical Assistance Priority axis 4 2014FR05SFOP001 OP ESF Priority axis 2 2014FR05M9OP001 OP YEI New total expenditure included in a payment application. (i.e. total eligible expenditure included in a payment application which has not yet been taken into account for calculating an installment of 100000 EUR). All elgible costs. Installments of EUR 100000 of new total expenditure included in a payment application submitted to the European Commission until the maximum amount budgeted under the technical assistance priority axis is reached. 3716,64
ANNEX II Conditions for reimbursement of expenditure on the basis of standard scales of unit costs and lump sums to France
1.1.2.4.5. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicator Amounts (in EUR) Garantie Jeunes supported under priority axis 1 Accompagner les jeunes NEET vers et dans l’emploi of the operational programme PROGRAMME OPÉRATIONNEL NATIONAL POUR LA MISE EN ŒUVRE DE L’INITIATIVE POUR L’EMPLOI DES JEUNES EN METROPOLE ET OUTRE-MER (CCI-2014FR05M9OP001) Young NEET with a positive result under Garantie Jeunes at the latest 12 months following the start of coaching Number of young NEETs who have one of the following results at the latest 12 months following the start of the coaching: or 6400 Training for the unemployed provided by accredited training organisations and supported by the Operational Programme Ile-de-France (CCI 2014FR05M0OP001) Participants with a successful outcome following a training course. All eligible costs of the operation. Number of participants with one of the following outcomes following a training course: If a participant achieves more than one succesful outcome following the training course, this shall only give rise to the reimbursement of one amount for that training. Category Sector Amount 1 Healthcare 3931 Safety of goods and people 2 Cultural, sports and leisure activities 4556 Services to people Handling of soft materials Agri-food, cooking Trade and sales Hosting, hotel industry, catering Health and safety at work 3 Secretarial and office automation training 5695 Social work Electronics Hairdressing, beauty and wellness Vehicle and equipment maintenance Transport, handling, storing 4 Agriculture 7054 Environment Building and public works Printing and publishing techniques Participants with a successful outcome following a training course. All eligible costs of the operation. Number of participants with one of the following outcomes following a training course: For category 5, additionally, number of participants with a successful outcome as described above who are entitled to receive an allowance from the Region Auvergne-Rhône-Alpes. If a participant achieves more than one succesful outcome following the training course, this shall only give rise to the reimbursement of one amount for that training. Category Sector Amount 1 Transport, logistics, and tourism 4403 Banking, insurance Management, business administration, creation of enterprises Services for individuals and communities 2 Health and social work, recreational, cultural and sporting activities 5214 Restaurant, hotel and food industries Trade Handling of soft materials and wood; graphic industries 3 Building and public works 7853 Process industries Mechanics, metal working Agriculture, fisheries Communication, information, art and entertainment 4 Maintenance 9605 Electricity, electronics IT and telecommunication 5 Allowances 2259 Qualifying and Professional Training under the Operational Programme ESF La Réunion (CCI 2014FR05SFOP005) — priority axis1. Foster the development of a knowledge-based, competitive and innovative society. Provisison of training leading to a qualification, skill or certification All eligible costs of the operation. Number of months per participant of qualifying and professional training including the months in the training centre and within a company. Catégorie A1: 3131 Catégorie B1: 4277 Catégorie C1: 2763 Catégorie D1: 2470 Catégorie D2: 2332 Catégorie D3: 3465 Catégorie E1: 2841 Catégorie E2: 3392 Catégorie E3: 2569 Catégorie F1: 2319 Catégorie F2: 2990 Catégorie F3: 2910 Catégorie G1: 2381 Adult Prequalification Vocational Training under the Operational Programme ESF La Réunion (CCI 2014FR05SFOP005) — priority axis 1. Foster the development of a knowledge-based, competitive and innovative society. Provision of vocational training leading to access to qualifying training. All eligible costs of the operation. Number of months per participant of prequalifying training with a maximum duration of 5 months. Catégorie H1: 2805 Participants who have successfully completed individual professional training. All eligible costs of the operation. Number of participants who have obtained a recognised qualification/certification within 4 months of the end of the training Catégorie Niveau Coût d’unité d’oeuvre A III 17509,80 B IV 14908,87 C V 13847,37 D VI 9562,39 Participants who have successfully completed the vocational health training. All eligible costs of the operation Number of participants having successfully completed their training year (passing on to a higher year or graduating). Code Amount (value 2017) State Diploma of care-giver Initial AS-INIT 6150,99 Partial AS-PART 3444,55 State Diploma of nurse Year 1 IFSI-A1 9038,52 Year 2 IFSI-A2 7341,99 Year 3 IFSI-A3 5620,57 State Diploma of midwife Year 1 ESF-A1 15752,29 Year 2 ESF-A2 9878,55 Year 3 ESF-A3 11038,54 Year 4 ESF-A4 5318,95 State Diploma of ambulance driver IFA-AMB 5886,73 State Diploma Childcarer Assistant IFAP 8102,58 State Diploma Childcarer EP 12173,43 State Diploma of Occupational Therapist Year 1 IRFE-A1 12570,94 Year 2 IRFE-A2 7557,72 Year 3 IRFE-A3 6611,51 State Diploma of massage physiotherapy Year 1 IFMK-A1 5761,21 Year 2 IFMK-A2 4638,97 Year 3 IFMK-A3 4783,31 Year 4 IFMK-A4 4493,41 State diploma of psychomotor specialist Year 1 IRFP-A1 9504,44 Year 2 IRFP-A2 8650,03 Year 3 IRFP-A3 6008,29 (1) allowances paid to the participant; (2) activation costs incurred by the missions locales (3) entered vocational skills training leading to a certification, whether by: (4) entering training in lifelong learning; or (5) entering basic training; (6) started a company; or (7) found a job; or (8) has spent at least 80 working days in a (paid or not) professional environment (9) received a diploma or a confirmation of acquired competencies at the end of their training course; (10) found a job of at least one month duration; (11) inscribed in a further professional training course; (12) re-inscribed in their previous school curriculum after an interruption; or (13) gained access to a formal validation process of their aquired competencies. (1) Rhône-Alpes (CCI 2014FR16M2OP010) (2) and (3) Auvergne (CCI 2014FR16M0OP002) Pt_3_. 2. Training for the unemployed provided by accredited training organisations and supported by the following Operational Programmes: (15) received a diploma which is officially endorsed by a professional representation organisation or government office.; (16) received a confirmation of aquired competencies at the end of their training course; (17) found a job; (18) inscribed in a further professional training course; (19) re-inscribed in their previous school curriculum after an interruption; or (20) gained access to a formal validation process of their aquired competencies. Pt_6_. 2. Qualifying-certifying vocational training through public procurement under the ESF Operational Program of La Réunion (CCI 2014FR05SFOP005) (22) Priority Axis 1: Foster the development of a knowledge-based, competitive and innovative society. (23) Priority Axis 2: Supporting access to employment through skills and mobility development (24) Priority Axis 3: Promoting social inclusion and combating poverty by strengthening public training and support Pt_7_. 2. Graduate vocational health training under the ESF Operational Program of La Réunion (CCI 2014FR05SFOP005) (26) Priority Axis 1: Foster the development of a knowledge-based, competitive and innovative society.
allowances paid to the participant;
activation costs incurred by the missions locales
entered vocational skills training leading to a certification, whether by:
entering training in lifelong learning; or
entering basic training;
started a company; or
found a job; or
has spent at least 80 working days in a (paid or not) professional environment
received a diploma or a confirmation of acquired competencies at the end of their training course;
found a job of at least one month duration;
inscribed in a further professional training course;
re-inscribed in their previous school curriculum after an interruption; or
gained access to a formal validation process of their aquired competencies.
1.1.2.
3. Training for the unemployed provided by accredited training organisations and supported by the following Operational Programmes: (1) Rhône-Alpes (CCI 2014FR16M2OP010) (2) and (3) Auvergne (CCI 2014FR16M0OP002)
Rhône-Alpes (CCI 2014FR16M2OP010)
and
Auvergne (CCI 2014FR16M0OP002)
received a diploma which is officially endorsed by a professional representation organisation or government office.;
received a confirmation of aquired competencies at the end of their training course;
found a job;
inscribed in a further professional training course;
re-inscribed in their previous school curriculum after an interruption; or
gained access to a formal validation process of their aquired competencies.
1.1.2.4.5.
6. Qualifying-certifying vocational training through public procurement under the ESF Operational Program of La Réunion (CCI 2014FR05SFOP005)
Priority Axis 1: Foster the development of a knowledge-based, competitive and innovative society.
Priority Axis 2: Supporting access to employment through skills and mobility development
Priority Axis 3: Promoting social inclusion and combating poverty by strengthening public training and support
7. Graduate vocational health training under the ESF Operational Program of La Réunion (CCI 2014FR05SFOP005)
Priority Axis 1: Foster the development of a knowledge-based, competitive and innovative society.
2. Adjustment of amounts The amount of unit cost 1. is based partly on a standard scale of unit cost funded entirely by France. Out of the 6400 EUR, 1600 EUR correspond to the standard scale of unit cost set out by the instruction ministérielle du 11 octobre 2013 relative à l’expérimentation Garantie Jeunes prise pour l’application du décret 2013-80 du 1er octobre 2013 ainsi que par l’instruction ministérielle du 20 mars 2014 to cover the costs borne by the Youth Public Employment Services Missions Locales to coach each NEET entering the Garantie Jeunes. Unit cost 1. shall be updated by the Member State in line with adjustments under national rules to the standard scale of unit cost of 1600 EUR mentioned in paragraph 1 above that covers the costs borne by the Youth Public Employment Services. The amount of unit costs 2. and 3. are based on publicly procured prices for training hours in the respective fields and geographical areas. These amounts will be adjusted when the procurement process for the underlying training courses is repeated according to the following formula: New price (excl. VAT) = Old price (excl. VAT) x (0,5 + 0,5 x Sr/So) Sr is the index of employed persons INSEE (identifyer 1567446) of the last monthly publication at the date of the adjustement So is the index of employed persons INSEE (identifyer 1567446) of the monthly publication at the date of submission of the tender for the first adjustment then, for the following adjustments, of the monthly publication of the anniversary date of submission of the tender The amounts of the unit costs 4, 5 and 7 may be adjusted based on the Reunion inflation rate (INSEE index) – reference year 2017. The amounts for unit costs 6 may be adjusted according to the price review mechanism in the event of a renewal of the tender of the Reunion Region. The amounts of the scales are updated annually, as of 1 January N on the basis of the latest index known, according to the following formula: The intermediate calculations will be carried out with four decimal places, the scale comprising two decimals and the coefficient applicable to rounded P0, if any at the top thousandth. The selected BSCU scale is the value of 2017. The reference year is therefore 2017 as a starting point for indexing. Indexing applies to courses that started in year N. (1) Scale review formula: B — B0 (Im/I0) (2) B — amount of revised scale N (3) B0 — amount of the initial scale (N-1). (4) I0 — reference value, the last known value of the SYNTEC index as of January 1, N-1 (5) Im — I0-12 months
Scale review formula: B — B0 (Im/I0)
B — amount of revised scale N
B0 — amount of the initial scale (N-1).
I0 — reference value, the last known value of the SYNTEC index as of January 1, N-1
Im — I0-12 months
3. Definition of lump sums Type of operations Indicator name Category of costs Measurement unit for the indicator Amounts (in EUR) Technical Assistance Priority axis 4 2014FR05SFOP001 OP ESF Priority axis 2 2014FR05M9OP001 OP YEI New total expenditure included in a payment application. (i.e. total eligible expenditure included in a payment application which has not yet been taken into account for calculating an installment of 100000 EUR). All elgible costs. Installments of EUR 100000 of new total expenditure included in a payment application submitted to the European Commission until the maximum amount budgeted under the technical assistance priority axis is reached. 3716,64
ANNEX II
(1) Establishment of a new childcare facility under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) (2) purchase of equipment for a childcare facility; (3) management of project phase focused on creating the facility. Pt_2_. 2. Transformation of an existing facility to a children’s group under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) (5) purchase of equipment for a transformed facility; (6) purchase of teaching aids; (7) management of project phase focused on transforming the facility Pt_3_. 2. Operating a childcare facility under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) (9) salaries of teaching and non-teaching staff, (10) operation of the childcare facility, (11) management of the operation (4) Upskilling of caregivers under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) (13) training and examination for professional qualification Pt_5_. 2. Lease of premises for childcare facilities under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) (15) Rent of the premises for a childcare facility Pt_6_. 2. Further external professional training of employees under Priority Axis 1 of Operational Programme Employment, (2014CZ05M9OP001) (17) Direct costs of providing training; (18) Indirect costs; (19) Wages for participants. Pt_7_. 2. Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) (21) Direct costs of providing training; (22) Indirect costs; (23) Wages for participants. (8) Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) (25) Direct costs of providing training; (26) Indirect costs; (27) Wages for participants. Pt_9_. 2. Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) (29) Direct costs of providing training; (30) Indirect costs; (31) Wages for participants. Pt_10_. 2. Further external professional training of employees under Priority Axis 1 of the Operational Programme Employment (2014CZ05M9OP001) (33) Direct costs of providing training; (34) Indirect costs; (35) Wages for participants. Pt_11_. 2. Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) (37) Direct costs of providing training; (38) Indirect costs; (39) Wages for participants. (12) Further internal professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) (41) general information technologies (IT) (42) soft and managerial skills (43) languages (44) specialised IT (45) accountancy, economy and law (46) technical and other professional. (47) Direct staff costs; (48) Indirect costs; (49) Wages for participants. Pt_13_. 2. Support provided by non-permanent personnel to school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) (14) Support provided by non-permanent personnel to school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_15_. 2. Support provided by non-permanent personnel to school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) (16) Provision of extracurricular activity for children/pupils at risk of school failure under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) Pt_17_. 2. Supporting pupils at the risk of school failure through tutoring under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) Pt_18_. 2. Professional development of pedagogues through structured training courses under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) Pt_1_. 2. 435 for training inside regular class time Pt_2_. 3. 170 for training outside regular class time Pt_19_. 2. Provision of information to parents through meetings under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) (20) Professional development of pedagogues in schools and educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_21_. 2. Professional development of pedagogues in schools and educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_22_. 2. Professional development of pedagogues in schools and educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_23_. 2. Professional development of teaching staff of school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) (24) Professional development of pedagogues of school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_25_. 2. Career advice services in schools and cooperation between schools and employers under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_26_. 2. Professional development of pedagogues of school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_27_. 2. Professional competence development of pedagogues under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001). (28) Mobility of researchers under priority axis 2 of Operational Programme Research, Development and Education (2014CZ05M2OP001). Pt_29_. 2. Supporting pupils with different mother tongue, teachers or parents through the assistance of an Intercultural Worker or Bilingual Assistant under Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001). Pt_1_. 3. 0,1 FTE worked per month by an Intercultural Worker or Bilingual Assistant. Pt_2_. 4. One hour (60 minutes) worked by an Intercultural Worker. Pt_1_. 4. Number of 0,1 FTE worked by an Intercultural Worker or Bilingual Assistant per month. Pt_2_. 5. Number of hours worked by an Intercultural Worker. Pt_1_. 5. Intercultural Worker: 5373 Bilingual Assistant: 4464 Pt_2_. 6. Intercultural Worker: 308 Pt_30_. 2. Transnational mobility projects for the training of educational staff under Priority Axis 4 Education and learning and support of Employment of Operational Programme Prague Growth Pole (2014CZ16M2OP001). Pt_1_. 6. Salaries for participants; Pt_2_. 7. Costs associated with organising the traineeship in the host and sending school. Pt_3_. 3. Travel and subsistence costs; Pt_1_. 7. 5087 Pt_2_. 8. EUR 350 Pt_3_. 4. To these amounts for each 4-day traineeship may be added an amount per participant to cover travel and subsistence costs as follows: Pt_31_. 2. Developing information and communications technology (ICT) skills of pupils and staff in school/educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) (32) Professional development of teaching staff under Priority Axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) (84) consisting of 4 lessons of 45 minutes each of teaching outside the normal school environment (85) to a group of at least 10 students, of which at least 3 are at risk of school failure, complemented by at least 60 minutes of joint preparation and reflection Pt_33_. 2. Training of education staff through transnational mobility under Priority Axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_1_. 8. Salaries for participants who are teachers; Pt_2_. 9. Costs associated with organising the traineeship in the host and sending school. Pt_3_. 5. Travel and subsistence costs; Pt_1_. 9. 1388 CZK (per day) Pt_2_. 10. 350 EUR (per training course) Pt_3_. 6. Travel and subsistence costs Pt_34_. 2. Cooperation among research organisations and other entities under Priority axis 2 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_35_. 2. Professional development of educator in informal education organisations under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) (36) Professional development of educator in informal education organisations under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_37_. 2. Professional development of educator through structured training in informal education organisations under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_1_. 10. All eligible costs, including direct costs of providing training and meal expenses; Pt_2_. 11. All eligible costs, including direct costs of providing training and meal expenses + Travel expenses. Pt_1_. 11. Number of hours of training per participant. Pt_2_. 12. Number of hours of training per participant for whom travel expenses apply (one-way journey of minimum 10km). Pt_1_. 12. 200,50 CZK Pt_2_. 13. 200,50 CZK +2,50 EUR Pt_38_. 2. Professional development of educators in informal education organisations under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_1_. 13. 6227 CZK (the expert is employee). Pt_2_. 14. 2719 CZK (the expert is volunteer). Pt_39_. 2. Professional development of educator in informal education organisations under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) (40) Provision of extracurricular activity provided by informal education organisation for children/pupils at risk of school failure under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Grp. 1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicator Amounts (in national currency CZK unless otherwise mentioned) Newly created place in a new childcare facility Number of newly created places in a new childcare facility 20544 incl. VAT, or 17451 excl. VAT Transformed place in a children’s group Number of transformed places in a children’s group 9891 incl. VAT, or 8642 excl. VAT Occupancy per place in a childcare facility Occupancy rate 730 Achievement of a qualification as caregiver in a childcare facility Number of persons who obtain a certification of professional qualification as caregiver in a childcare facility 14760 Occupancy per place in a childcare facility Occupancy rate. 64 One hour (60 minutes) of participation of an employee in an external training course on general information technologies (IT) All eligible costs, including: Number of completed hours per employee. 324 One hour (60 minutes) of participation of an employee in an external training course on soft and managerial skills All eligible costs, including: Number of completed hours per employee. 593 One hour (60 minutes) of participation of an employee in external language training courses All eligible costs, including: Number of completed hours per employee 230 One hour (60 minutes) of participation of an employee in a training course in specialised IT All eligible costs, inlcuding: Number of completed hours per employee 609 One hour (60 minutes) of participation of an employee in an external training course in accountancy, economy and law All eligible costs, including: Number of completed hours per employee 436 One hour (60 minutes) of participation of an employee in external technical and other professional training All eligible costs, including: Number of completed hours per employee 252 One hour (60 minutes) of participation of an employee in a training course provided by an internal trainer in any of the following areas: All eligible costs, including: Number of completed hours per employee 144 0,1 full-time equivalent (FTE) worked as a school psychologist and/or a specialised school pedagogue per month All eligible costs, including, direct staff costs Number of 0,1 FTE worked per month 5871 0,1 FTE worked by a school assistant and/or social pedagogue per month. All eligible costs, including direct staff costs Number of 0,1 FTE worked per month School assistant: 3617 Social pedagogue: 4849 0,1 FTE worked by a nanny per month All eligible costs, including direct staff costs. Number of 0,1 FTE worked per month 3402 Provision of a block of 16 lessons of extracurricular activities with a duration of 90 minutes per lesson provided to a group of at least 6 children/pupils of which 2 are at risk of school failure. All eligible costs, including direct staff costs. Number of completed blocks of 16 lessons with a duration of 90 minutes per lesson provided to a group of at least 6 children/pupils of which 2 are at risk of school failure. 17833 Provision of a block of 16 hours of tutoring to a group of at least 3 registered pupils at risk of school failure. All eligible costs, including direct staff costs. Number of completed blocks of 16 hours provided to a goup of at least 3 registered pupils at risk of school failure. 8917 Hours of professional training provided to pedagogues. All eligible costs, including direct costs of providing training. Number of completed hours of training per pedagogue Thematic meeting with a minimum of eight parents for a minimum duration of two hours (120 minutes). All eligible costs, including direct staff costs. Number of thematic meetings with a minimum of eight parents for a minimum duration of two hours (120 minutes) 3872 Block of 30 hours of external mentoring/coaching to a group of between 3 and 8 pedagogues. All eligible costs, including direct staff costs. Number of completed blocks of 30 hours mentoring/coaching to a group of between 3 and 8 pedagogues. 31191 Training cycle of 15 hours of structured job-shadowing by a pedagogue All eligible costs, including direct staff costs. Number of completed training cycles of 15 hours per pedagogue undertaking a structured visit to another pedagogue in another school. 4505 Cycle of 10 hours of training through mutual cooperation involving a group of at least 3 pedagogues. All eligible costs, including direct staff costs. Number of completed training cycles of 10 hours involving a group of at least 3 pedagogues. 8456 Tandem lesson of 2,75 hours. All eligible costs, including direct staff costs: Number of completed tandem lessons 815 Cycle of 19 hours of mutual cooperation and learning involving an expert and 2 pedagogues. All eligible costs, including direct staff costs. Number of completed cycles of 19 hours involving an expert and 2 other pedagogues. 5637 0,1 FTE worked per month by a career advisor and/or a coordinator of cooperation between a school and employers. All eligible costs, including direct staff costs Number of 0,1 FTE worked per month 4942 Training cycle of 8,5 hours involving structured job-shadowing by a pedagogue and a mentor. All eligible costs, including direct staff costs Number of completed training cycles of 8,5 hours per structured visit to an institution/company/facility. 2395 Cycle of 3,75 hours or 4 cycles of 3,75 hours of training involving a pedagogue and expert/ICT technician. All eligible costs, including direct staff costs Number of completed training cycles of 3,75 hours involving a pedagogue and expert/ICT technician. One Cycle: 1103 Four Cycles: 4412 Months in mobility per researcher. All eligible costs of the operation. Number of months in mobility per researcher. Components Amount(EUR) Living Allowance (for incoming mobility to CZ) Junior 2674 Senior 3990 The amounts of Living Allowance for outgoing mobility from CZ shall be calculated by multiplying the amounts for incoming mobility by the relevant correction co-efficient listed in point 3 below, depending on destination country. Mobility allowance 600 Family allowance 500 Research, training and networking costs 800 Management and Indirect Costs 650 All eligible costs of the operation. A 4-day traineeship for educational staff in a school in another European State consisting of at least 24 hours of educational activities. All eligible costs of the operation, which are: Number of 4-day traineeships participated in by educational staff in a school in another European State. Travel costs depending on distance as follows: Amount 10-99 km: EUR 20 100-499 km: EUR 180 500-1999 km: EUR 275 2000-2999 km: EUR 360 3000-3999 km: EUR 530 4000-7999 km: EUR 820 8000 km and above: EUR 1300 Subsistence costs, depending on country as follows: Amount Denmark, Ireland, Norway, Sweden, United Kingdom EUR 448 Belgium, Bulgaria, Greece, France, Italy, Cyprus, Luxembourg, Hungary, Austria, Poland, Romania, Finland, EUR 392 Germany, Spain, Latvia, Malta, Portugal, Slovakia, EUR 336 Estonia, Croatia, Lithuania, Slovenia. EUR 280 Lesson of 45 minutes using ICT tools, with a minimum of 10 pupils of which at least 3 are at risk of school failure. All eligible costs of the operation, including direct ICT costs and direct staff costs Number of lessons of 45 minutes with a minimum of 10 pupils of which at least 3 are at risk of school failure. 2000 Project day consisting of cooperative teaching by teaching staff and an external expert All eligible costs, including travel costs and direct staff costs Number of project days of cooperative teaching, which meet the following requirements: 6477 Training courses of a teacher or a student teacher in a school in another EU Member State or non-EU Erasmus+ programme country consisting of 6 hours of specific activities per day. All eligible costs, including travel costs and direct staff costs Number of training courses of teaching staff at schools in another EU country or non-EU Erasmus+ programme country. A training course may consist of one or several training days of 6 hours of specific activities. Travel costs per round-trip depending on distance as follows: Amount 10-99 km: EUR 20 100-499 km: EUR 180 500-1999 km: EUR 275 2000-2999 km: EUR 360 3000-3999 km: EUR 530 4000-7999 km: EUR 820 8000 km and above: EUR 1300 Subsistence costs, depending on country and number of days as follows: Amount Denmark, Ireland, Norway, Sweden, United Kingdom, Finland, Luxembourg, Iceland, Lichtenstein 153 EUR/per day (1.-14. days), 107 EUR (15.-60. days). Netherlands, Austria, Belgium, France, Germany, Italy, Spain, Cyprus, Greece, Malta, Portugal 136 EUR/per day (1. – 14. days), 95 EUR (15.-60. days). Slovenia, Estonia, Latvia, Croatia, Slovakia, Lithuania, Turkey, Hungary, Poland, Romania, Bulgaria, North Macedonia 119 EUR/per day (1.-14. days), 83 EUR (15.-60. days). Internships and practical training in research organisations and related cooperation among research organisations. All eligible costs, including travel costs and direct staff costs Number of man-days of work in research organisations abroad (outgoing) or in CZ research organisations (incoming) 219 EUR for incoming; 219 EUR x relevant correction coefficient (see table under point (3) for outgoing Provision of structured job-shadowing for a training cycle of 20 hours. All eligible costs, including direct staff costs. Number of training cycles of structured job-shadowing provided by employees or volunteers. (1) 5262 CZK (the expert is employee). (2) 3070 CZK (the expert is volunteer). Provision of tandem training cycle of 9 hours. All eligible costs, including direct staff costs. Number of tandem training cycles of 9 hours provided by employees or volunteers. (1) 2499 CZK (the expert is employee). (2) 1184 CZK (the expert is volunteer). Provision of training in accredited structured courses. Cycle of 22 hours of mutual cooperation and learning involving an expert and 2 educators. All eligible costs, including direct staff costs. Number of completed cycles of 22 hours involving an expert and 2 other educators. Project day of minimum 4 hours consisting of cooperative teaching by educator and an external expert All eligible costs, including travel costs, staff costs and indirect costs. Number of project days completed for at least 10 students at a distance of at least 10km outside the organisation main seat 246 EUR Provision of extracurricular activities for a total duration of 24 hours. All eligible costs, excluding direct staff costs. Number of blocks of 24 hours of extracurricular activities implemented. 6315 CZK (1) for the minimum wage, amendments to the minimum wage as set by government decree no. 567/2006 Coll; (2) for social security contributions, amendments to employers’ contributions to social security, defined in Act no. 589/1992 Coll. on social security; and (3) for health contributions, amendments to employers’ contributions to health insurance, defined in Act no. 592/1992 Coll. on premiums for health insurance. (4) For average salaries to determine wages/staff costs, changes to the latest annual published data for relevant categories from the average earnings informational system (www.ISPV.cz). (5) For Living Allowance, Mobility allowance, Family allowance, Research, training and networking costs Management and Indirect Costs, amendment to rates for the HORIZON 2020 – Marie Skłodowska-Curie Actions as published at https://ec.europa.eu/research/mariecurieactions/ (6) For travel, subsistence and organisational costs under unit cost 30, amendments to the amounts for travel and organisational costs as well as individual support set by the European Commission for Key Action 1 (mobility projects) under the Erasmus+ programme (http://ec.europa.eu/programmes/erasmus-plus/). (7) For travel under unit cost 32, amendments to the amounts for travel between 10 and 99 kilometres as set out in the distance calculator of the Erasmus+ programme (http://ec.europa.eu/programmes/erasmus-plus/resources/distance-calculator_en). Grp. 2. Adjustments of amounts. The rate for unit costs 6-11 may be adjusted by replacing the initial minimum wage rate in the calculation method that consists of the minimum wage, the cost for provision of training and indirect costs. The rate for unit cost 12 may be adjusted by replacing the initial direct staff costs, including social security and health contributions, and/or the wages for participants, including social security and health contributions in the calculation method that consists of direct staff costs, including social security and health contributions and/or the wages for participants, including social security and health contributions. The rate for unit costs 13-17, 19-27, and 29 may be adjusted by replacing the initial direct staff costs, including social security and health contributions, in the calculation method that consists of direct staff costs, including social security and health contributions, plus indirect costs. The rate for unit cost 18 may be adjusted by replacing the salaries for participants, including social security and health contributions in the calculation method that consists of the cost for provision of training plus salaries for participants, including social security and health contributions, plus indirect costs. The amounts for unit cost 28 may be adjusted by replacing the amounts for Living Allowance, Mobility allowance, Family allowance, Research, training and networking costs Management and Indirect Costs. The rate for unit cost 30 may be adjusted by replacing the initial direct staff costs, including social security and health contributions, the costs associated with organising the traineeship in the host and sending school, and the travel and subsistence costs in the calculation method that consists of direct staff costs, including social security and health contributions, the costs associated with organising the traineeship in the host and sending school, and the travel and subsistence costs. The rate for unit cost 32 may be adjusted by replacing the amount for travel in the calculation method that consists of direct costs for travel, plus direct staff costs, plus indirect costs. Adjustments will be based on the updated data as follows: Grp. 3a. For cooperation among research organisations Value of the MSCA Correction coefficient Correction coefficient Amount — one man day 0,48-0,799 0,75 164,25 EUR 0,8-0,999 0,875 191,63 EUR 1,00-1,52 1 219 EUR Grp. 3b. Coefficients related to outgoing mobility of researchers (MSCA Correction coefficient) Country Amount of the correction coefficient Albania 0,799 Algeria 0,905 Angola 1,567 Argentina 0,802 Armenia 0,922 Australia 1,277 Austria 1,305 Azerbaijan 1,080 Bangladesh 0,747 Barbados 1,376 Belarus 0,728 Belgium 1,223 Belize 0,942 Benin 1,186 Bermuda 1,853 Bolivia 0,826 Bosnia and Herzegovina 0,844 Botswana 0,632 Brazil 1,197 Bulgaria 0,758 Burkina Faso 1,181 Burundi 0,907 Cambodia 0,911 Cameroon 1,174 Canada 1,074 Cape Verde 0,877 Central African Republic 1,328 Colombia 0,953 Comoros 0,845 Costa Rica 1,004 Croatia 1,026 Cuba 0,961 Cyprus 1,010 Czechia 1,000 Democratic Republic of Congo 1,680 Denmark 1,651 Djibouti 1,058 Dominican Republic 0,769 Eastern Timor 1,093 Ecuador 0,923 Egypt 0,708 Eritrea 1,210 Estonia 0,971 Ethiopia 1,040 Faroe Islands 1,651 Fiji 0,838 Finland 1,477 France 1,415 Gabon 1,318 Gambia 0,844 Georgia 0,921 Germany 1,186 Ghana 0,784 United Kingdom 1,710 Greece 1,085 Guatemala 1,010 Guinea 0,901 Guinea-Bissau 1,181 Guyana 0,761 Haiti 1,157 Honduras 0,898 Hong Kong 1,228 Hungary 0,947 Chad 1,441 Chile 0,720 China 1,121 Iceland 1,410 India 0,775 Indonesia 0,854 Ireland 1,414 Israel 1,298 Italy 1,277 Ivory Coast 1,202 Jamaica 1,125 Japan 1,290 Jordan 1,058 Kazakhstan 1,002 Kenya 0,997 Kyrgyzstan 0,982 Laos 1,091 Latvia 0,950 Lebanon 1,055 Lesotho 0,591 Liberia 1,359 Libya 0,704 Lichtenstein 1,482 Lithuania 0,887 Luxembourg 1,223 North Macedonia 0,734 Madagascar 1,052 Malawi 0,831 Malaysia 0,841 Mali 1,155 Malta 1,032 Mauretania 0,764 Mauritius 0,910 Mexico 0,821 Montenegro 0,793 Morocco 0,922 Mozambique 0,874 Myanmar 0,801 Namibia 0,751 Nepal 0,942 Netherlands 1,320 New Caledonia 1,433 New Zealand 1,220 Nicaragua 0,691 Niger 1,037 Nigeria 1,132 Norway 1,597 Pakistan 0,635 Palestinian Autonomous Territories 1,355 Panama 0,773 Papua New Guinea 1,241 Paraguay 0,844 Peru 0,981 Philippines 0,898 Poland 0,923 Portugal 1,030 Republic of Moldova 0,758 Republic of Serbia 0,823 Republic of the Congo 1,475 Romania 0,841 Russia 1,290 Rwanda 1,009 Salvador 0,851 Samoa 1,015 Saudi Arabia 0,988 Senegal 1,158 Sierra Leone 1,306 Singapur 1,382 Slovakia 0,983 Slovenia 1,053 Solomon Islands 1,314 South African Republic 0,621 South Korea 1,194 Spain 1,167 Sri Lanka 0,855 Sudan 1,219 Suriname 0,685 Swaziland 0,654 Sweden 1,490 Switzerland 1,482 Syria 0,994 Taiwan 1,011 Tajikistan 0,761 Tanzania 0,800 Thailand 0,876 Togo 1,032 Tonga 1,040 Trinidad And Tobago 0,991 Tunisia 0,826 Turkey 1,004 Turkmenistan 0,775 Uganda 0,862 Ukraine 0,866 United Arab Emirates 1,119 Uruguay 1,031 USA 1,212 Uzbekistan 0,813 Vanuatu 1,321 Venezuela 1,103 Vietnam 0,652 Yemen 0,992 Zambie 0,947 Zimbabwe 1,123 Grp. 3. Table of Coefficients related to outgoing mobility of researchers and cooperation among research organisations
ANNEX III Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Czechia
1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicator Amounts (in national currency CZK unless otherwise mentioned) Newly created place in a new childcare facility Number of newly created places in a new childcare facility 20544 incl. VAT, or 17451 excl. VAT Transformed place in a children’s group Number of transformed places in a children’s group 9891 incl. VAT, or 8642 excl. VAT Occupancy per place in a childcare facility Occupancy rate 730 Achievement of a qualification as caregiver in a childcare facility Number of persons who obtain a certification of professional qualification as caregiver in a childcare facility 14760 Occupancy per place in a childcare facility Occupancy rate. 64 One hour (60 minutes) of participation of an employee in an external training course on general information technologies (IT) All eligible costs, including: Number of completed hours per employee. 324 One hour (60 minutes) of participation of an employee in an external training course on soft and managerial skills All eligible costs, including: Number of completed hours per employee. 593 One hour (60 minutes) of participation of an employee in external language training courses All eligible costs, including: Number of completed hours per employee 230 One hour (60 minutes) of participation of an employee in a training course in specialised IT All eligible costs, inlcuding: Number of completed hours per employee 609 One hour (60 minutes) of participation of an employee in an external training course in accountancy, economy and law All eligible costs, including: Number of completed hours per employee 436 One hour (60 minutes) of participation of an employee in external technical and other professional training All eligible costs, including: Number of completed hours per employee 252 One hour (60 minutes) of participation of an employee in a training course provided by an internal trainer in any of the following areas: All eligible costs, including: Number of completed hours per employee 144 0,1 full-time equivalent (FTE) worked as a school psychologist and/or a specialised school pedagogue per month All eligible costs, including, direct staff costs Number of 0,1 FTE worked per month 5871 0,1 FTE worked by a school assistant and/or social pedagogue per month. All eligible costs, including direct staff costs Number of 0,1 FTE worked per month School assistant: 3617 Social pedagogue: 4849 0,1 FTE worked by a nanny per month All eligible costs, including direct staff costs. Number of 0,1 FTE worked per month 3402 Provision of a block of 16 lessons of extracurricular activities with a duration of 90 minutes per lesson provided to a group of at least 6 children/pupils of which 2 are at risk of school failure. All eligible costs, including direct staff costs. Number of completed blocks of 16 lessons with a duration of 90 minutes per lesson provided to a group of at least 6 children/pupils of which 2 are at risk of school failure. 17833 Provision of a block of 16 hours of tutoring to a group of at least 3 registered pupils at risk of school failure. All eligible costs, including direct staff costs. Number of completed blocks of 16 hours provided to a goup of at least 3 registered pupils at risk of school failure. 8917 Hours of professional training provided to pedagogues. All eligible costs, including direct costs of providing training. Number of completed hours of training per pedagogue Thematic meeting with a minimum of eight parents for a minimum duration of two hours (120 minutes). All eligible costs, including direct staff costs. Number of thematic meetings with a minimum of eight parents for a minimum duration of two hours (120 minutes) 3872 Block of 30 hours of external mentoring/coaching to a group of between 3 and 8 pedagogues. All eligible costs, including direct staff costs. Number of completed blocks of 30 hours mentoring/coaching to a group of between 3 and 8 pedagogues. 31191 Training cycle of 15 hours of structured job-shadowing by a pedagogue All eligible costs, including direct staff costs. Number of completed training cycles of 15 hours per pedagogue undertaking a structured visit to another pedagogue in another school. 4505 Cycle of 10 hours of training through mutual cooperation involving a group of at least 3 pedagogues. All eligible costs, including direct staff costs. Number of completed training cycles of 10 hours involving a group of at least 3 pedagogues. 8456 Tandem lesson of 2,75 hours. All eligible costs, including direct staff costs: Number of completed tandem lessons 815 Cycle of 19 hours of mutual cooperation and learning involving an expert and 2 pedagogues. All eligible costs, including direct staff costs. Number of completed cycles of 19 hours involving an expert and 2 other pedagogues. 5637 0,1 FTE worked per month by a career advisor and/or a coordinator of cooperation between a school and employers. All eligible costs, including direct staff costs Number of 0,1 FTE worked per month 4942 Training cycle of 8,5 hours involving structured job-shadowing by a pedagogue and a mentor. All eligible costs, including direct staff costs Number of completed training cycles of 8,5 hours per structured visit to an institution/company/facility. 2395 Cycle of 3,75 hours or 4 cycles of 3,75 hours of training involving a pedagogue and expert/ICT technician. All eligible costs, including direct staff costs Number of completed training cycles of 3,75 hours involving a pedagogue and expert/ICT technician. One Cycle: 1103 Four Cycles: 4412 Months in mobility per researcher. All eligible costs of the operation. Number of months in mobility per researcher. Components Amount(EUR) Living Allowance (for incoming mobility to CZ) Junior 2674 Senior 3990 The amounts of Living Allowance for outgoing mobility from CZ shall be calculated by multiplying the amounts for incoming mobility by the relevant correction co-efficient listed in point 3 below, depending on destination country. Mobility allowance 600 Family allowance 500 Research, training and networking costs 800 Management and Indirect Costs 650 All eligible costs of the operation. A 4-day traineeship for educational staff in a school in another European State consisting of at least 24 hours of educational activities. All eligible costs of the operation, which are: Number of 4-day traineeships participated in by educational staff in a school in another European State. Travel costs depending on distance as follows: Amount 10-99 km: EUR 20 100-499 km: EUR 180 500-1999 km: EUR 275 2000-2999 km: EUR 360 3000-3999 km: EUR 530 4000-7999 km: EUR 820 8000 km and above: EUR 1300 Subsistence costs, depending on country as follows: Amount Denmark, Ireland, Norway, Sweden, United Kingdom EUR 448 Belgium, Bulgaria, Greece, France, Italy, Cyprus, Luxembourg, Hungary, Austria, Poland, Romania, Finland, EUR 392 Germany, Spain, Latvia, Malta, Portugal, Slovakia, EUR 336 Estonia, Croatia, Lithuania, Slovenia. EUR 280 Lesson of 45 minutes using ICT tools, with a minimum of 10 pupils of which at least 3 are at risk of school failure. All eligible costs of the operation, including direct ICT costs and direct staff costs Number of lessons of 45 minutes with a minimum of 10 pupils of which at least 3 are at risk of school failure. 2000 Project day consisting of cooperative teaching by teaching staff and an external expert All eligible costs, including travel costs and direct staff costs Number of project days of cooperative teaching, which meet the following requirements: 6477 Training courses of a teacher or a student teacher in a school in another EU Member State or non-EU Erasmus+ programme country consisting of 6 hours of specific activities per day. All eligible costs, including travel costs and direct staff costs Number of training courses of teaching staff at schools in another EU country or non-EU Erasmus+ programme country. A training course may consist of one or several training days of 6 hours of specific activities. Travel costs per round-trip depending on distance as follows: Amount 10-99 km: EUR 20 100-499 km: EUR 180 500-1999 km: EUR 275 2000-2999 km: EUR 360 3000-3999 km: EUR 530 4000-7999 km: EUR 820 8000 km and above: EUR 1300 Subsistence costs, depending on country and number of days as follows: Amount Denmark, Ireland, Norway, Sweden, United Kingdom, Finland, Luxembourg, Iceland, Lichtenstein 153 EUR/per day (1.-14. days), 107 EUR (15.-60. days). Netherlands, Austria, Belgium, France, Germany, Italy, Spain, Cyprus, Greece, Malta, Portugal 136 EUR/per day (1. – 14. days), 95 EUR (15.-60. days). Slovenia, Estonia, Latvia, Croatia, Slovakia, Lithuania, Turkey, Hungary, Poland, Romania, Bulgaria, North Macedonia 119 EUR/per day (1.-14. days), 83 EUR (15.-60. days). Internships and practical training in research organisations and related cooperation among research organisations. All eligible costs, including travel costs and direct staff costs Number of man-days of work in research organisations abroad (outgoing) or in CZ research organisations (incoming) 219 EUR for incoming; 219 EUR x relevant correction coefficient (see table under point (3) for outgoing Provision of structured job-shadowing for a training cycle of 20 hours. All eligible costs, including direct staff costs. Number of training cycles of structured job-shadowing provided by employees or volunteers. (1) 5262 CZK (the expert is employee). (2) 3070 CZK (the expert is volunteer). Provision of tandem training cycle of 9 hours. All eligible costs, including direct staff costs. Number of tandem training cycles of 9 hours provided by employees or volunteers. (1) 2499 CZK (the expert is employee). (2) 1184 CZK (the expert is volunteer). Provision of training in accredited structured courses. Cycle of 22 hours of mutual cooperation and learning involving an expert and 2 educators. All eligible costs, including direct staff costs. Number of completed cycles of 22 hours involving an expert and 2 other educators. Project day of minimum 4 hours consisting of cooperative teaching by educator and an external expert All eligible costs, including travel costs, staff costs and indirect costs. Number of project days completed for at least 10 students at a distance of at least 10km outside the organisation main seat 246 EUR Provision of extracurricular activities for a total duration of 24 hours. All eligible costs, excluding direct staff costs. Number of blocks of 24 hours of extracurricular activities implemented. 6315 CZK (1) Establishment of a new childcare facility under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) (2) purchase of equipment for a childcare facility; (3) management of project phase focused on creating the facility. Pt_2_. 2. Transformation of an existing facility to a children’s group under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) (5) purchase of equipment for a transformed facility; (6) purchase of teaching aids; (7) management of project phase focused on transforming the facility Pt_3_. 2. Operating a childcare facility under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) (9) salaries of teaching and non-teaching staff, (10) operation of the childcare facility, (11) management of the operation (4) Upskilling of caregivers under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) (13) training and examination for professional qualification Pt_5_. 2. Lease of premises for childcare facilities under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) (15) Rent of the premises for a childcare facility Pt_6_. 2. Further external professional training of employees under Priority Axis 1 of Operational Programme Employment, (2014CZ05M9OP001) (17) Direct costs of providing training; (18) Indirect costs; (19) Wages for participants. Pt_7_. 2. Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) (21) Direct costs of providing training; (22) Indirect costs; (23) Wages for participants. (8) Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) (25) Direct costs of providing training; (26) Indirect costs; (27) Wages for participants. Pt_9_. 2. Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) (29) Direct costs of providing training; (30) Indirect costs; (31) Wages for participants. Pt_10_. 2. Further external professional training of employees under Priority Axis 1 of the Operational Programme Employment (2014CZ05M9OP001) (33) Direct costs of providing training; (34) Indirect costs; (35) Wages for participants. Pt_11_. 2. Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) (37) Direct costs of providing training; (38) Indirect costs; (39) Wages for participants. (12) Further internal professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) (41) general information technologies (IT) (42) soft and managerial skills (43) languages (44) specialised IT (45) accountancy, economy and law (46) technical and other professional. (47) Direct staff costs; (48) Indirect costs; (49) Wages for participants. Pt_13_. 2. Support provided by non-permanent personnel to school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) (14) Support provided by non-permanent personnel to school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_15_. 2. Support provided by non-permanent personnel to school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) (16) Provision of extracurricular activity for children/pupils at risk of school failure under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) Pt_17_. 2. Supporting pupils at the risk of school failure through tutoring under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) Pt_18_. 2. Professional development of pedagogues through structured training courses under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) Pt_1_. 2. 435 for training inside regular class time Pt_2_. 3. 170 for training outside regular class time Pt_19_. 2. Provision of information to parents through meetings under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001) (20) Professional development of pedagogues in schools and educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_21_. 2. Professional development of pedagogues in schools and educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_22_. 2. Professional development of pedagogues in schools and educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_23_. 2. Professional development of teaching staff of school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) (24) Professional development of pedagogues of school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_25_. 2. Career advice services in schools and cooperation between schools and employers under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_26_. 2. Professional development of pedagogues of school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_27_. 2. Professional competence development of pedagogues under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001). (28) Mobility of researchers under priority axis 2 of Operational Programme Research, Development and Education (2014CZ05M2OP001). Pt_29_. 2. Supporting pupils with different mother tongue, teachers or parents through the assistance of an Intercultural Worker or Bilingual Assistant under Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001). Pt_1_. 3. 0,1 FTE worked per month by an Intercultural Worker or Bilingual Assistant. Pt_2_. 4. One hour (60 minutes) worked by an Intercultural Worker. Pt_1_. 4. Number of 0,1 FTE worked by an Intercultural Worker or Bilingual Assistant per month. Pt_2_. 5. Number of hours worked by an Intercultural Worker. Pt_1_. 5. Intercultural Worker: 5373 Bilingual Assistant: 4464 Pt_2_. 6. Intercultural Worker: 308 Pt_30_. 2. Transnational mobility projects for the training of educational staff under Priority Axis 4 Education and learning and support of Employment of Operational Programme Prague Growth Pole (2014CZ16M2OP001). Pt_1_. 6. Salaries for participants; Pt_2_. 7. Costs associated with organising the traineeship in the host and sending school. Pt_3_. 3. Travel and subsistence costs; Pt_1_. 7. 5087 Pt_2_. 8. EUR 350 Pt_3_. 4. To these amounts for each 4-day traineeship may be added an amount per participant to cover travel and subsistence costs as follows: Pt_31_. 2. Developing information and communications technology (ICT) skills of pupils and staff in school/educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) (32) Professional development of teaching staff under Priority Axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) (84) consisting of 4 lessons of 45 minutes each of teaching outside the normal school environment (85) to a group of at least 10 students, of which at least 3 are at risk of school failure, complemented by at least 60 minutes of joint preparation and reflection Pt_33_. 2. Training of education staff through transnational mobility under Priority Axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_1_. 8. Salaries for participants who are teachers; Pt_2_. 9. Costs associated with organising the traineeship in the host and sending school. Pt_3_. 5. Travel and subsistence costs; Pt_1_. 9. 1388 CZK (per day) Pt_2_. 10. 350 EUR (per training course) Pt_3_. 6. Travel and subsistence costs Pt_34_. 2. Cooperation among research organisations and other entities under Priority axis 2 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_35_. 2. Professional development of educator in informal education organisations under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) (36) Professional development of educator in informal education organisations under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_37_. 2. Professional development of educator through structured training in informal education organisations under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_1_. 10. All eligible costs, including direct costs of providing training and meal expenses; Pt_2_. 11. All eligible costs, including direct costs of providing training and meal expenses + Travel expenses. Pt_1_. 11. Number of hours of training per participant. Pt_2_. 12. Number of hours of training per participant for whom travel expenses apply (one-way journey of minimum 10km). Pt_1_. 12. 200,50 CZK Pt_2_. 13. 200,50 CZK +2,50 EUR Pt_38_. 2. Professional development of educators in informal education organisations under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) Pt_1_. 13. 6227 CZK (the expert is employee). Pt_2_. 14. 2719 CZK (the expert is volunteer). Pt_39_. 2. Professional development of educator in informal education organisations under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) (40) Provision of extracurricular activity provided by informal education organisation for children/pupils at risk of school failure under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
1.
1. Establishment of a new childcare facility under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001)
purchase of equipment for a childcare facility;
management of project phase focused on creating the facility.
2. Transformation of an existing facility to a children’s group under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001)
purchase of equipment for a transformed facility;
purchase of teaching aids;
management of project phase focused on transforming the facility
3. Operating a childcare facility under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001)
salaries of teaching and non-teaching staff,
operation of the childcare facility,
management of the operation
4. Upskilling of caregivers under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001)
training and examination for professional qualification
5. Lease of premises for childcare facilities under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001)
Rent of the premises for a childcare facility
6. Further external professional training of employees under Priority Axis 1 of Operational Programme Employment, (2014CZ05M9OP001)
Direct costs of providing training;
Indirect costs;
Wages for participants.
7. Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001)
Direct costs of providing training;
Indirect costs;
Wages for participants.
8. Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001)
Direct costs of providing training;
Indirect costs;
Wages for participants.
9. Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001)
Direct costs of providing training;
Indirect costs;
Wages for participants.
10. Further external professional training of employees under Priority Axis 1 of the Operational Programme Employment (2014CZ05M9OP001)
Direct costs of providing training;
Indirect costs;
Wages for participants.
11. Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001)
Direct costs of providing training;
Indirect costs;
Wages for participants.
12. Further internal professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001)
general information technologies (IT)
soft and managerial skills
languages
specialised IT
accountancy, economy and law
technical and other professional.
Direct staff costs;
Indirect costs;
Wages for participants.
13. Support provided by non-permanent personnel to school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
14. Support provided by non-permanent personnel to school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
15. Support provided by non-permanent personnel to school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
16. Provision of extracurricular activity for children/pupils at risk of school failure under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001)
17. Supporting pupils at the risk of school failure through tutoring under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001)
18. Professional development of pedagogues through structured training courses under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001)
1) 435 for training inside regular class time
2) 170 for training outside regular class time
19. Provision of information to parents through meetings under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001)
20. Professional development of pedagogues in schools and educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
21. Professional development of pedagogues in schools and educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
22. Professional development of pedagogues in schools and educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
23. Professional development of teaching staff of school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
24. Professional development of pedagogues of school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
25. Career advice services in schools and cooperation between schools and employers under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
26. Professional development of pedagogues of school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
27. Professional competence development of pedagogues under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001).
28. Mobility of researchers under priority axis 2 of Operational Programme Research, Development and Education (2014CZ05M2OP001).
29. Supporting pupils with different mother tongue, teachers or parents through the assistance of an Intercultural Worker or Bilingual Assistant under Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001).
1) 0,1 FTE worked per month by an Intercultural Worker or Bilingual Assistant.
2) One hour (60 minutes) worked by an Intercultural Worker.
1) Number of 0,1 FTE worked by an Intercultural Worker or Bilingual Assistant per month.
2) Number of hours worked by an Intercultural Worker.
1) Intercultural Worker: 5373 Bilingual Assistant: 4464
2) Intercultural Worker: 308
30. Transnational mobility projects for the training of educational staff under Priority Axis 4 Education and learning and support of Employment of Operational Programme Prague Growth Pole (2014CZ16M2OP001).
1) Salaries for participants;
2) Costs associated with organising the traineeship in the host and sending school.
3) Travel and subsistence costs;
1) 5087
2) EUR 350
3) To these amounts for each 4-day traineeship may be added an amount per participant to cover travel and subsistence costs as follows:
31. Developing information and communications technology (ICT) skills of pupils and staff in school/educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
32. Professional development of teaching staff under Priority Axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
consisting of 4 lessons of 45 minutes each of teaching outside the normal school environment
to a group of at least 10 students, of which at least 3 are at risk of school failure, complemented by at least 60 minutes of joint preparation and reflection
33. Training of education staff through transnational mobility under Priority Axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
1) Salaries for participants who are teachers;
2) Costs associated with organising the traineeship in the host and sending school.
3) Travel and subsistence costs;
1. 1388 CZK (per day)
2. 350 EUR (per training course)
3. Travel and subsistence costs
34. Cooperation among research organisations and other entities under Priority axis 2 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
35. Professional development of educator in informal education organisations under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
36. Professional development of educator in informal education organisations under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
37. Professional development of educator through structured training in informal education organisations under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
(1) All eligible costs, including direct costs of providing training and meal expenses;
(2) All eligible costs, including direct costs of providing training and meal expenses + Travel expenses.
(1) Number of hours of training per participant.
(2) Number of hours of training per participant for whom travel expenses apply (one-way journey of minimum 10km).
(1) 200,50 CZK
(2) 200,50 CZK +2,50 EUR
38. Professional development of educators in informal education organisations under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
(1) 6227 CZK (the expert is employee).
(2) 2719 CZK (the expert is volunteer).
39. Professional development of educator in informal education organisations under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
40. Provision of extracurricular activity provided by informal education organisation for children/pupils at risk of school failure under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
2. Adjustments of amounts. The rate for unit costs 6-11 may be adjusted by replacing the initial minimum wage rate in the calculation method that consists of the minimum wage, the cost for provision of training and indirect costs. The rate for unit cost 12 may be adjusted by replacing the initial direct staff costs, including social security and health contributions, and/or the wages for participants, including social security and health contributions in the calculation method that consists of direct staff costs, including social security and health contributions and/or the wages for participants, including social security and health contributions. The rate for unit costs 13-17, 19-27, and 29 may be adjusted by replacing the initial direct staff costs, including social security and health contributions, in the calculation method that consists of direct staff costs, including social security and health contributions, plus indirect costs. The rate for unit cost 18 may be adjusted by replacing the salaries for participants, including social security and health contributions in the calculation method that consists of the cost for provision of training plus salaries for participants, including social security and health contributions, plus indirect costs. The amounts for unit cost 28 may be adjusted by replacing the amounts for Living Allowance, Mobility allowance, Family allowance, Research, training and networking costs Management and Indirect Costs. The rate for unit cost 30 may be adjusted by replacing the initial direct staff costs, including social security and health contributions, the costs associated with organising the traineeship in the host and sending school, and the travel and subsistence costs in the calculation method that consists of direct staff costs, including social security and health contributions, the costs associated with organising the traineeship in the host and sending school, and the travel and subsistence costs. The rate for unit cost 32 may be adjusted by replacing the amount for travel in the calculation method that consists of direct costs for travel, plus direct staff costs, plus indirect costs. Adjustments will be based on the updated data as follows: (1) for the minimum wage, amendments to the minimum wage as set by government decree no. 567/2006 Coll; (2) for social security contributions, amendments to employers’ contributions to social security, defined in Act no. 589/1992 Coll. on social security; and (3) for health contributions, amendments to employers’ contributions to health insurance, defined in Act no. 592/1992 Coll. on premiums for health insurance. (4) For average salaries to determine wages/staff costs, changes to the latest annual published data for relevant categories from the average earnings informational system (www.ISPV.cz). (5) For Living Allowance, Mobility allowance, Family allowance, Research, training and networking costs Management and Indirect Costs, amendment to rates for the HORIZON 2020 – Marie Skłodowska-Curie Actions as published at https://ec.europa.eu/research/mariecurieactions/ (6) For travel, subsistence and organisational costs under unit cost 30, amendments to the amounts for travel and organisational costs as well as individual support set by the European Commission for Key Action 1 (mobility projects) under the Erasmus+ programme (http://ec.europa.eu/programmes/erasmus-plus/). (7) For travel under unit cost 32, amendments to the amounts for travel between 10 and 99 kilometres as set out in the distance calculator of the Erasmus+ programme (http://ec.europa.eu/programmes/erasmus-plus/resources/distance-calculator_en).
for the minimum wage, amendments to the minimum wage as set by government decree no. 567/2006 Coll;
for social security contributions, amendments to employers’ contributions to social security, defined in Act no. 589/1992 Coll. on social security; and
for health contributions, amendments to employers’ contributions to health insurance, defined in Act no. 592/1992 Coll. on premiums for health insurance.
For average salaries to determine wages/staff costs, changes to the latest annual published data for relevant categories from the average earnings informational system (www.ISPV.cz).
For Living Allowance, Mobility allowance, Family allowance, Research, training and networking costs Management and Indirect Costs, amendment to rates for the HORIZON 2020 – Marie Skłodowska-Curie Actions as published at https://ec.europa.eu/research/mariecurieactions/
For travel, subsistence and organisational costs under unit cost 30, amendments to the amounts for travel and organisational costs as well as individual support set by the European Commission for Key Action 1 (mobility projects) under the Erasmus+ programme (http://ec.europa.eu/programmes/erasmus-plus/).
For travel under unit cost 32, amendments to the amounts for travel between 10 and 99 kilometres as set out in the distance calculator of the Erasmus+ programme (http://ec.europa.eu/programmes/erasmus-plus/resources/distance-calculator_en).
3. Table of Coefficients related to outgoing mobility of researchers and cooperation among research organisations Grp. 3a. For cooperation among research organisations Value of the MSCA Correction coefficient Correction coefficient Amount — one man day 0,48-0,799 0,75 164,25 EUR 0,8-0,999 0,875 191,63 EUR 1,00-1,52 1 219 EUR Grp. 3b. Coefficients related to outgoing mobility of researchers (MSCA Correction coefficient) Country Amount of the correction coefficient Albania 0,799 Algeria 0,905 Angola 1,567 Argentina 0,802 Armenia 0,922 Australia 1,277 Austria 1,305 Azerbaijan 1,080 Bangladesh 0,747 Barbados 1,376 Belarus 0,728 Belgium 1,223 Belize 0,942 Benin 1,186 Bermuda 1,853 Bolivia 0,826 Bosnia and Herzegovina 0,844 Botswana 0,632 Brazil 1,197 Bulgaria 0,758 Burkina Faso 1,181 Burundi 0,907 Cambodia 0,911 Cameroon 1,174 Canada 1,074 Cape Verde 0,877 Central African Republic 1,328 Colombia 0,953 Comoros 0,845 Costa Rica 1,004 Croatia 1,026 Cuba 0,961 Cyprus 1,010 Czechia 1,000 Democratic Republic of Congo 1,680 Denmark 1,651 Djibouti 1,058 Dominican Republic 0,769 Eastern Timor 1,093 Ecuador 0,923 Egypt 0,708 Eritrea 1,210 Estonia 0,971 Ethiopia 1,040 Faroe Islands 1,651 Fiji 0,838 Finland 1,477 France 1,415 Gabon 1,318 Gambia 0,844 Georgia 0,921 Germany 1,186 Ghana 0,784 United Kingdom 1,710 Greece 1,085 Guatemala 1,010 Guinea 0,901 Guinea-Bissau 1,181 Guyana 0,761 Haiti 1,157 Honduras 0,898 Hong Kong 1,228 Hungary 0,947 Chad 1,441 Chile 0,720 China 1,121 Iceland 1,410 India 0,775 Indonesia 0,854 Ireland 1,414 Israel 1,298 Italy 1,277 Ivory Coast 1,202 Jamaica 1,125 Japan 1,290 Jordan 1,058 Kazakhstan 1,002 Kenya 0,997 Kyrgyzstan 0,982 Laos 1,091 Latvia 0,950 Lebanon 1,055 Lesotho 0,591 Liberia 1,359 Libya 0,704 Lichtenstein 1,482 Lithuania 0,887 Luxembourg 1,223 North Macedonia 0,734 Madagascar 1,052 Malawi 0,831 Malaysia 0,841 Mali 1,155 Malta 1,032 Mauretania 0,764 Mauritius 0,910 Mexico 0,821 Montenegro 0,793 Morocco 0,922 Mozambique 0,874 Myanmar 0,801 Namibia 0,751 Nepal 0,942 Netherlands 1,320 New Caledonia 1,433 New Zealand 1,220 Nicaragua 0,691 Niger 1,037 Nigeria 1,132 Norway 1,597 Pakistan 0,635 Palestinian Autonomous Territories 1,355 Panama 0,773 Papua New Guinea 1,241 Paraguay 0,844 Peru 0,981 Philippines 0,898 Poland 0,923 Portugal 1,030 Republic of Moldova 0,758 Republic of Serbia 0,823 Republic of the Congo 1,475 Romania 0,841 Russia 1,290 Rwanda 1,009 Salvador 0,851 Samoa 1,015 Saudi Arabia 0,988 Senegal 1,158 Sierra Leone 1,306 Singapur 1,382 Slovakia 0,983 Slovenia 1,053 Solomon Islands 1,314 South African Republic 0,621 South Korea 1,194 Spain 1,167 Sri Lanka 0,855 Sudan 1,219 Suriname 0,685 Swaziland 0,654 Sweden 1,490 Switzerland 1,482 Syria 0,994 Taiwan 1,011 Tajikistan 0,761 Tanzania 0,800 Thailand 0,876 Togo 1,032 Tonga 1,040 Trinidad And Tobago 0,991 Tunisia 0,826 Turkey 1,004 Turkmenistan 0,775 Uganda 0,862 Ukraine 0,866 United Arab Emirates 1,119 Uruguay 1,031 USA 1,212 Uzbekistan 0,813 Vanuatu 1,321 Venezuela 1,103 Vietnam 0,652 Yemen 0,992 Zambie 0,947 Zimbabwe 1,123
3.
3.A For cooperation among research organisations Value of the MSCA Correction coefficient Correction coefficient Amount — one man day 0,48-0,799 0,75 164,25 EUR 0,8-0,999 0,875 191,63 EUR 1,00-1,52 1 219 EUR
3.B Coefficients related to outgoing mobility of researchers (MSCA Correction coefficient) Country Amount of the correction coefficient Albania 0,799 Algeria 0,905 Angola 1,567 Argentina 0,802 Armenia 0,922 Australia 1,277 Austria 1,305 Azerbaijan 1,080 Bangladesh 0,747 Barbados 1,376 Belarus 0,728 Belgium 1,223 Belize 0,942 Benin 1,186 Bermuda 1,853 Bolivia 0,826 Bosnia and Herzegovina 0,844 Botswana 0,632 Brazil 1,197 Bulgaria 0,758 Burkina Faso 1,181 Burundi 0,907 Cambodia 0,911 Cameroon 1,174 Canada 1,074 Cape Verde 0,877 Central African Republic 1,328 Colombia 0,953 Comoros 0,845 Costa Rica 1,004 Croatia 1,026 Cuba 0,961 Cyprus 1,010 Czechia 1,000 Democratic Republic of Congo 1,680 Denmark 1,651 Djibouti 1,058 Dominican Republic 0,769 Eastern Timor 1,093 Ecuador 0,923 Egypt 0,708 Eritrea 1,210 Estonia 0,971 Ethiopia 1,040 Faroe Islands 1,651 Fiji 0,838 Finland 1,477 France 1,415 Gabon 1,318 Gambia 0,844 Georgia 0,921 Germany 1,186 Ghana 0,784 United Kingdom 1,710 Greece 1,085 Guatemala 1,010 Guinea 0,901 Guinea-Bissau 1,181 Guyana 0,761 Haiti 1,157 Honduras 0,898 Hong Kong 1,228 Hungary 0,947 Chad 1,441 Chile 0,720 China 1,121 Iceland 1,410 India 0,775 Indonesia 0,854 Ireland 1,414 Israel 1,298 Italy 1,277 Ivory Coast 1,202 Jamaica 1,125 Japan 1,290 Jordan 1,058 Kazakhstan 1,002 Kenya 0,997 Kyrgyzstan 0,982 Laos 1,091 Latvia 0,950 Lebanon 1,055 Lesotho 0,591 Liberia 1,359 Libya 0,704 Lichtenstein 1,482 Lithuania 0,887 Luxembourg 1,223 North Macedonia 0,734 Madagascar 1,052 Malawi 0,831 Malaysia 0,841 Mali 1,155 Malta 1,032 Mauretania 0,764 Mauritius 0,910 Mexico 0,821 Montenegro 0,793 Morocco 0,922 Mozambique 0,874 Myanmar 0,801 Namibia 0,751 Nepal 0,942 Netherlands 1,320 New Caledonia 1,433 New Zealand 1,220 Nicaragua 0,691 Niger 1,037 Nigeria 1,132 Norway 1,597 Pakistan 0,635 Palestinian Autonomous Territories 1,355 Panama 0,773 Papua New Guinea 1,241 Paraguay 0,844 Peru 0,981 Philippines 0,898 Poland 0,923 Portugal 1,030 Republic of Moldova 0,758 Republic of Serbia 0,823 Republic of the Congo 1,475 Romania 0,841 Russia 1,290 Rwanda 1,009 Salvador 0,851 Samoa 1,015 Saudi Arabia 0,988 Senegal 1,158 Sierra Leone 1,306 Singapur 1,382 Slovakia 0,983 Slovenia 1,053 Solomon Islands 1,314 South African Republic 0,621 South Korea 1,194 Spain 1,167 Sri Lanka 0,855 Sudan 1,219 Suriname 0,685 Swaziland 0,654 Sweden 1,490 Switzerland 1,482 Syria 0,994 Taiwan 1,011 Tajikistan 0,761 Tanzania 0,800 Thailand 0,876 Togo 1,032 Tonga 1,040 Trinidad And Tobago 0,991 Tunisia 0,826 Turkey 1,004 Turkmenistan 0,775 Uganda 0,862 Ukraine 0,866 United Arab Emirates 1,119 Uruguay 1,031 USA 1,212 Uzbekistan 0,813 Vanuatu 1,321 Venezuela 1,103 Vietnam 0,652 Yemen 0,992 Zambie 0,947 Zimbabwe 1,123
ANNEX III
(1) Employment Aid (A2E Scheme) under Priority axis 1 of the ESF Operational Programme II Investing in human capital to create more opportunities and promote the wellbeing of society (2014MT05SFOP001) Pt_1_. 2. Disadvantaged worker — 85 per week for a maximum of 52 weeks. (2) Severely disadvantaged worker — 85 per week for a maximum of 104 weeks. (3) Worker with disabilities — 125 per week for a maximum of 156 weeks. Pt_2_. 2. Training aid (Investing In Skills scheme) to enterprises in the private sector under Priority Axis 3 of the ESF Operational Programme II Investing in human capital to create more opportunities and promote the wellbeing of society (2014MT05SFOP001) Pt_3_. 2. Training aid (Investing In Skills scheme) to enterprises in the private sector under Priority Axis 3 of the ESF Operational Programme II Investing in human capital to create more opportunities and promote the wellbeing of society (2014MT05SFOP001) (4) Training aid (Investing In Skills scheme) to enterprises in the private sector under Priority Axis 3 of the ESF Operational Programme II Investing in human capital to create more opportunities and promote the wellbeing of society (2014MT05SFOP001) (5) Training and work experience under the Youth Guarantee (YG), Priority Axis 1, Investment Priority 8ii of OP 2014MT05SFOP001 Pt_1_. 3. Profiling of young persons below 25 years (classified as NEETs) within the YG. Pt_2_. 3. Young persons below 25 years (classifed as NEETs) completing a training under the YG. Pt_3_. 3. An hour of professional support for young persons below 25 years of age. Pt_4_. 2. Allowances for participants below 25 years (classified as NEETs) completing the YG scheme. Pt_1_. 4. Number of young persons below 25 years for whom a profiling report was carried out and for whom the availability of the participants details as per Annex I of Regulation (EU) No 1304/2013 has been validated. Pt_2_. 4. Number of young persons below 25 years who continue to the next phase of the YG (i.e. work exposure or continued education). Pt_3_. 4. Number of hours of professional support provided to young people below 25 years per participant. Pt_4_. 3. Number of young persons below 25 years having completed the work exposure or continued education scheme and received a certificate of completion. Pt_1_. 5. 2601,50 Pt_2_. 5. 2128,50 Pt_3_. 5. 50 Pt_4_. 4. 1398 (6) IT-training under the Youth Guarantee (YG), Priority Axis 1, Investment Priority 8ii of OP 2014MT05SFOP001. Pt_1_. 6. Number of youths registered for an MQF L2 Summer ICT course. Pt_2_. 6. Number of youths having received a certificate of attendance or completion for an MQF L2 Summer ICT course. Pt_1_. 7. 416 Pt_2_. 7. 318 (7) IT-training (European Computer Driving Licence) at MQF Level 3, Priority Axis 1, Investment Priority 8ii of OP 2014MT05SFOP001. Pt_1_. 8. Number of youths registered for an MQF L3 Standard ECDL course. Pt_2_. 8. Number of youths having received a certificate of attendance or completion for an MQF L3 Standard ECDL. Pt_1_. 9. 226,50 Pt_2_. 9. 528,50 (8) Prevention classes for the Malta College for Arts, Science and Technology (MCAST) under the Youth Guarantee (YG), Priority Axis 1, Investment Priority 8ii of OP 2014MT05SFOP001. Pt_1_. 10. Number of youths registered for an MCAST prevention class. Pt_2_. 10. Number of youths re-taking the MCAST exam. Pt_3_. 6. Number of youths who have successfully progressed in the MCAST course after re-taking the exam in September of the respective year or who have achieved the full qualification at the end of the curriculum. Pt_1_. 11. 62,10 Pt_2_. 11. 113,85 Pt_3_. 7. 31,05 (9) Prevention classes for attaining a Secondary Education Certificate (SEC) under the Youth Guarantee (YG), Priority Axis 1, Investment Priority 8ii of OP 2014MT05SFOP001 Pt_1_. 12. Number of youths registered to re-take the SEC exam. Pt_2_. 12. Number of youths re-taking the SEC exam. Pt_3_. 8. Number of youths who have an improved SEC exam result compared to the one previously obtained. Pt_1_. 13. 38,10 Pt_2_. 13. 69,85 Pt_3_. 9. 19,05 (10) Provision of scholarships at the tertiary level of education to different target groups at the European Qualification Framework level 7 (EQF L 7) under Priority Axis 3 (Investment Priorities 10ii and 10iii) and 4 (Investment Priority 11i) of OP 2014MT05SFOP001. Grp. 1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Employment aid paid per week to workers who are disadvantaged, severely disadvantaged or with disabilities. All costs related to the Employment Subsidy. Number of weeks in employment per employee. Participation in one hour of accredited or non-accredited external training Direct costs of providing external training Number of completed hours per participant 25 Provision of one hour of accredited or non-accredited internal training. Salary costs for internal trainer. Number of completed hours of training provided per trainer. 4,90 Participation in one hour of accredited or non-accredited internal or external training. Salary costs for participant. Number of completed hours per participant. 4,90 All eligible costs of the operation. Young persons below 25 years receiving training through the Malta Qualifications Framework (MQF) Level 2 Summer ICT-courses. All eligible costs of the operation. Young persons below 25 years receiving training at MQF Level 3 for the Standard European Computer Driving Licence (ECDL). All eligible costs of the operation. Young persons below 25 years attending the MCAST prevention classes. All eligible costs of the operation. Young persons below 25 years following the SEC prevention class. All eligible costs of the operation. Participants who undergo an EQF L 7 programme of studies and gain a qualification or certification upon leaving. Tuition fees. Number of ECTS achieved × 0,95 for which a provisional transcript is presented. Number of ECTS achieved × 0,05 for which a certificate of accreditation or final transcript is presented. For study programmes in Malta 58 For study programmes in other countries and for joint study programmes 100 (1) The national minimum wage is specified in national Subsidiary Legislation 452.71 (National Minimum Wage Standing Order). (2) The statutory bonuses, weekly allowances and social security contributions provided for in Chapter 452 of the Maltese legislation on the Employment and Industrial relations Act. Grp. 2. Adjustment of amounts Unit cost 1 may be adjusted by replacing the initial minimum wage and/or the statutory bonus and/or weekly allowances and/or social security contributions in the calculation method that consists of the lowest weekly rate of national minimum wage for a particular year, the statutory bonus, weekly allowances and social security contributions, and dividing this result by 2. Unit Cost 2 may be adjusted by applying the annual rate of inflation to the respective rates. From 2017, for a given year N, this can be be done by applying the inflation rate for year N-1 as published by the Maltese National Statistics Office at: https://nso.gov.mt/en/nso/Selected_Indicators/Retail_Price_Index/Pages/Index-of-Inflation.aspx Unit costs 3-4 may be adjusted by replacing the initial national minimum wage for persons 18 years or over and/or the statutory bonuses and/or weekly allowances and/or social security contributions in the calculation method that consists of the hourly rate of national minimum wage for persons 18 years or over for a particular year, the statutory bonuses, the weekly allowances and social security contributions. Adjustments will be based on updated data as follows: Unit costs 5-9 may be adjusted in line with the cost of inflation at a national level for the relevant year the particular intervention is being undertaken. The annual rates of inflation are published by the National Statistics Office and can be found at: https://nso.gov.mt/en/nso/Selected_Indicators/Retail_Price_Index/Pages/Index-of-Inflation.aspx. Unit cost 10 will be adjusted in line with inflation according to the country in which the course is being undertaken. For courses awarded by a body that is not based in Malta and for joint study programmes an average of the rates of inflation applicable at the time will be applied. https://ec.europa.eu/eurostat/tgm/table.do?tab=table&init=1&language=en&pcode=tec00118&plugin=1 Grp. 3. Definition of lump sums Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) All operations of Operational Programme 2014MT05SFOP001 New total expenditure included in a payment application (i.e. total eligible expenditure included in a payment application which has not yet been taken into account for calculating an installment of EUR 100000) to cover indirect costs of the operation. Indirect costs. Instalments of EUR 100000 of new total expenditure per group of operations included in a payment application submitted to the European Commission. See point 4. Grp. 4. Amounts Type of entity Public entity Ministry/Department Non-Governmental Organisations Public Employment Service Project size Large EUR 8000 EUR 8000 / EUR 25000 Medium EUR 25000 EUR 25000 / EUR 25000 Small EUR 25000 EUR 25000 EUR 25000 EUR 25000 Grp. 5. Adjustment of amounts Not applicable.
ANNEX V Conditions for reimbursement of expenditure on the basis of standard scales of unit costs and lump sums to Malta
1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Employment aid paid per week to workers who are disadvantaged, severely disadvantaged or with disabilities. All costs related to the Employment Subsidy. Number of weeks in employment per employee. Participation in one hour of accredited or non-accredited external training Direct costs of providing external training Number of completed hours per participant 25 Provision of one hour of accredited or non-accredited internal training. Salary costs for internal trainer. Number of completed hours of training provided per trainer. 4,90 Participation in one hour of accredited or non-accredited internal or external training. Salary costs for participant. Number of completed hours per participant. 4,90 All eligible costs of the operation. Young persons below 25 years receiving training through the Malta Qualifications Framework (MQF) Level 2 Summer ICT-courses. All eligible costs of the operation. Young persons below 25 years receiving training at MQF Level 3 for the Standard European Computer Driving Licence (ECDL). All eligible costs of the operation. Young persons below 25 years attending the MCAST prevention classes. All eligible costs of the operation. Young persons below 25 years following the SEC prevention class. All eligible costs of the operation. Participants who undergo an EQF L 7 programme of studies and gain a qualification or certification upon leaving. Tuition fees. Number of ECTS achieved × 0,95 for which a provisional transcript is presented. Number of ECTS achieved × 0,05 for which a certificate of accreditation or final transcript is presented. For study programmes in Malta 58 For study programmes in other countries and for joint study programmes 100 (1) Employment Aid (A2E Scheme) under Priority axis 1 of the ESF Operational Programme II Investing in human capital to create more opportunities and promote the wellbeing of society (2014MT05SFOP001) Pt_1_. 2. Disadvantaged worker — 85 per week for a maximum of 52 weeks. (2) Severely disadvantaged worker — 85 per week for a maximum of 104 weeks. (3) Worker with disabilities — 125 per week for a maximum of 156 weeks. Pt_2_. 2. Training aid (Investing In Skills scheme) to enterprises in the private sector under Priority Axis 3 of the ESF Operational Programme II Investing in human capital to create more opportunities and promote the wellbeing of society (2014MT05SFOP001) Pt_3_. 2. Training aid (Investing In Skills scheme) to enterprises in the private sector under Priority Axis 3 of the ESF Operational Programme II Investing in human capital to create more opportunities and promote the wellbeing of society (2014MT05SFOP001) (4) Training aid (Investing In Skills scheme) to enterprises in the private sector under Priority Axis 3 of the ESF Operational Programme II Investing in human capital to create more opportunities and promote the wellbeing of society (2014MT05SFOP001) (5) Training and work experience under the Youth Guarantee (YG), Priority Axis 1, Investment Priority 8ii of OP 2014MT05SFOP001 Pt_1_. 3. Profiling of young persons below 25 years (classified as NEETs) within the YG. Pt_2_. 3. Young persons below 25 years (classifed as NEETs) completing a training under the YG. Pt_3_. 3. An hour of professional support for young persons below 25 years of age. Pt_4_. 2. Allowances for participants below 25 years (classified as NEETs) completing the YG scheme. Pt_1_. 4. Number of young persons below 25 years for whom a profiling report was carried out and for whom the availability of the participants details as per Annex I of Regulation (EU) No 1304/2013 has been validated. Pt_2_. 4. Number of young persons below 25 years who continue to the next phase of the YG (i.e. work exposure or continued education). Pt_3_. 4. Number of hours of professional support provided to young people below 25 years per participant. Pt_4_. 3. Number of young persons below 25 years having completed the work exposure or continued education scheme and received a certificate of completion. Pt_1_. 5. 2601,50 Pt_2_. 5. 2128,50 Pt_3_. 5. 50 Pt_4_. 4. 1398 (6) IT-training under the Youth Guarantee (YG), Priority Axis 1, Investment Priority 8ii of OP 2014MT05SFOP001. Pt_1_. 6. Number of youths registered for an MQF L2 Summer ICT course. Pt_2_. 6. Number of youths having received a certificate of attendance or completion for an MQF L2 Summer ICT course. Pt_1_. 7. 416 Pt_2_. 7. 318 (7) IT-training (European Computer Driving Licence) at MQF Level 3, Priority Axis 1, Investment Priority 8ii of OP 2014MT05SFOP001. Pt_1_. 8. Number of youths registered for an MQF L3 Standard ECDL course. Pt_2_. 8. Number of youths having received a certificate of attendance or completion for an MQF L3 Standard ECDL. Pt_1_. 9. 226,50 Pt_2_. 9. 528,50 (8) Prevention classes for the Malta College for Arts, Science and Technology (MCAST) under the Youth Guarantee (YG), Priority Axis 1, Investment Priority 8ii of OP 2014MT05SFOP001. Pt_1_. 10. Number of youths registered for an MCAST prevention class. Pt_2_. 10. Number of youths re-taking the MCAST exam. Pt_3_. 6. Number of youths who have successfully progressed in the MCAST course after re-taking the exam in September of the respective year or who have achieved the full qualification at the end of the curriculum. Pt_1_. 11. 62,10 Pt_2_. 11. 113,85 Pt_3_. 7. 31,05 (9) Prevention classes for attaining a Secondary Education Certificate (SEC) under the Youth Guarantee (YG), Priority Axis 1, Investment Priority 8ii of OP 2014MT05SFOP001 Pt_1_. 12. Number of youths registered to re-take the SEC exam. Pt_2_. 12. Number of youths re-taking the SEC exam. Pt_3_. 8. Number of youths who have an improved SEC exam result compared to the one previously obtained. Pt_1_. 13. 38,10 Pt_2_. 13. 69,85 Pt_3_. 9. 19,05 (10) Provision of scholarships at the tertiary level of education to different target groups at the European Qualification Framework level 7 (EQF L 7) under Priority Axis 3 (Investment Priorities 10ii and 10iii) and 4 (Investment Priority 11i) of OP 2014MT05SFOP001.
1.
1. Employment Aid (A2E Scheme) under Priority axis 1 of the ESF Operational Programme II Investing in human capital to create more opportunities and promote the wellbeing of society (2014MT05SFOP001)
1. Disadvantaged worker — 85 per week for a maximum of 52 weeks.
2. Severely disadvantaged worker — 85 per week for a maximum of 104 weeks.
3. Worker with disabilities — 125 per week for a maximum of 156 weeks.
2. Training aid (Investing In Skills scheme) to enterprises in the private sector under Priority Axis 3 of the ESF Operational Programme II Investing in human capital to create more opportunities and promote the wellbeing of society (2014MT05SFOP001)
3. Training aid (Investing In Skills scheme) to enterprises in the private sector under Priority Axis 3 of the ESF Operational Programme II Investing in human capital to create more opportunities and promote the wellbeing of society (2014MT05SFOP001)
4. Training aid (Investing In Skills scheme) to enterprises in the private sector under Priority Axis 3 of the ESF Operational Programme II Investing in human capital to create more opportunities and promote the wellbeing of society (2014MT05SFOP001)
5. Training and work experience under the Youth Guarantee (YG), Priority Axis 1, Investment Priority 8ii of OP 2014MT05SFOP001
(1) Profiling of young persons below 25 years (classified as NEETs) within the YG.
(2) Young persons below 25 years (classifed as NEETs) completing a training under the YG.
(3) An hour of professional support for young persons below 25 years of age.
(4) Allowances for participants below 25 years (classified as NEETs) completing the YG scheme.
(1) Number of young persons below 25 years for whom a profiling report was carried out and for whom the availability of the participants details as per Annex I of Regulation (EU) No 1304/2013 has been validated.
(2) Number of young persons below 25 years who continue to the next phase of the YG (i.e. work exposure or continued education).
(3) Number of hours of professional support provided to young people below 25 years per participant.
(4) Number of young persons below 25 years having completed the work exposure or continued education scheme and received a certificate of completion.
(1) 2601,50
(2) 2128,50
(3) 50
(4) 1398
6. IT-training under the Youth Guarantee (YG), Priority Axis 1, Investment Priority 8ii of OP 2014MT05SFOP001.
(1) Number of youths registered for an MQF L2 Summer ICT course.
(2) Number of youths having received a certificate of attendance or completion for an MQF L2 Summer ICT course.
(1) 416
(2) 318
7. IT-training (European Computer Driving Licence) at MQF Level 3, Priority Axis 1, Investment Priority 8ii of OP 2014MT05SFOP001.
(1) Number of youths registered for an MQF L3 Standard ECDL course.
(2) Number of youths having received a certificate of attendance or completion for an MQF L3 Standard ECDL.
(1) 226,50
(2) 528,50
8. Prevention classes for the Malta College for Arts, Science and Technology (MCAST) under the Youth Guarantee (YG), Priority Axis 1, Investment Priority 8ii of OP 2014MT05SFOP001.
(1) Number of youths registered for an MCAST prevention class.
(2) Number of youths re-taking the MCAST exam.
(3) Number of youths who have successfully progressed in the MCAST course after re-taking the exam in September of the respective year or who have achieved the full qualification at the end of the curriculum.
(1) 62,10
(2) 113,85
(3) 31,05
9. Prevention classes for attaining a Secondary Education Certificate (SEC) under the Youth Guarantee (YG), Priority Axis 1, Investment Priority 8ii of OP 2014MT05SFOP001
(1) Number of youths registered to re-take the SEC exam.
(2) Number of youths re-taking the SEC exam.
(3) Number of youths who have an improved SEC exam result compared to the one previously obtained.
(1) 38,10
(2) 69,85
(3) 19,05
10. Provision of scholarships at the tertiary level of education to different target groups at the European Qualification Framework level 7 (EQF L 7) under Priority Axis 3 (Investment Priorities 10ii and 10iii) and 4 (Investment Priority 11i) of OP 2014MT05SFOP001.
2. Adjustment of amounts Unit cost 1 may be adjusted by replacing the initial minimum wage and/or the statutory bonus and/or weekly allowances and/or social security contributions in the calculation method that consists of the lowest weekly rate of national minimum wage for a particular year, the statutory bonus, weekly allowances and social security contributions, and dividing this result by 2. Unit Cost 2 may be adjusted by applying the annual rate of inflation to the respective rates. From 2017, for a given year N, this can be be done by applying the inflation rate for year N-1 as published by the Maltese National Statistics Office at: https://nso.gov.mt/en/nso/Selected_Indicators/Retail_Price_Index/Pages/Index-of-Inflation.aspx Unit costs 3-4 may be adjusted by replacing the initial national minimum wage for persons 18 years or over and/or the statutory bonuses and/or weekly allowances and/or social security contributions in the calculation method that consists of the hourly rate of national minimum wage for persons 18 years or over for a particular year, the statutory bonuses, the weekly allowances and social security contributions. Adjustments will be based on updated data as follows: Unit costs 5-9 may be adjusted in line with the cost of inflation at a national level for the relevant year the particular intervention is being undertaken. The annual rates of inflation are published by the National Statistics Office and can be found at: https://nso.gov.mt/en/nso/Selected_Indicators/Retail_Price_Index/Pages/Index-of-Inflation.aspx. Unit cost 10 will be adjusted in line with inflation according to the country in which the course is being undertaken. For courses awarded by a body that is not based in Malta and for joint study programmes an average of the rates of inflation applicable at the time will be applied. https://ec.europa.eu/eurostat/tgm/table.do?tab=table&init=1&language=en&pcode=tec00118&plugin=1 (1) The national minimum wage is specified in national Subsidiary Legislation 452.71 (National Minimum Wage Standing Order). (2) The statutory bonuses, weekly allowances and social security contributions provided for in Chapter 452 of the Maltese legislation on the Employment and Industrial relations Act.
The national minimum wage is specified in national Subsidiary Legislation 452.71 (National Minimum Wage Standing Order).
The statutory bonuses, weekly allowances and social security contributions provided for in Chapter 452 of the Maltese legislation on the Employment and Industrial relations Act.
3. Definition of lump sums Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) All operations of Operational Programme 2014MT05SFOP001 New total expenditure included in a payment application (i.e. total eligible expenditure included in a payment application which has not yet been taken into account for calculating an installment of EUR 100000) to cover indirect costs of the operation. Indirect costs. Instalments of EUR 100000 of new total expenditure per group of operations included in a payment application submitted to the European Commission. See point 4.
4. Amounts Type of entity Public entity Ministry/Department Non-Governmental Organisations Public Employment Service Project size Large EUR 8000 EUR 8000 / EUR 25000 Medium EUR 25000 EUR 25000 / EUR 25000 Small EUR 25000 EUR 25000 EUR 25000 EUR 25000
5. Adjustment of amounts Not applicable.
ANNEX IV
(1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Friuli VG 2014IT05SFOP004 (8) POR Lazio 2014IT05SFOP005 (9) POR Liguria 2014IT05SFOP006 (10) POR Molise 2014IT16M2OP001 (11) POR Piemonte 2014IT05SFOP013 (12) POR Puglia 2014IT16M2OP002 (13) POR Sardegna 2014IT05SFOP021 (14) POR Sicilia 2014IT05SFOP014 (15) PO Trento 2014IT05SFOP018 (16) POR Umbria 2014IT05SFOP010 (17) POR Valle D’Aosta 2014IT05SFOP011 (18) PON SPAO 2014IT05SFOP002 (19) POR Toscana FSE 2014IT05SFOP015 (20) PON Inclusione 2014IT05SFOP001 (21) POR Lombardia FSE 2014IT05SFOP007 Pt_1_. 2. Measure 1.B of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Friuli VG 2014IT05SFOP004 (8) POR Lazio 2014IT05SFOP005 (9) POR Liguria 2014IT05SFOP006 (10) POR Molise 2014IT16M2OP001 (11) POR Piemonte 2014IT05SFOP013 (12) POR Puglia 2014IT16M2OP002 (13) POR Sardegna 2014IT05SFOP021 (14) POR Sicilia 2014IT05SFOP014 (15) PO Trento 2014IT05SFOP018 (16) POR Umbria 2014IT05SFOP010 (17) POR Valle D’Aosta 2014IT05SFOP011 (18) PON SPAO 2014IT05SFOP002 (19) POR Toscana FSE 2014IT05SFOP015 (20) PON Inclusione 2014IT05SFOP001 (21) POR Lombardia FSE 2014IT05SFOP007 Pt_2_. 2. Measure 1.C of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Lazio 2014IT05SFOP005 (7) POR Liguria 2014IT05SFOP006 (8) POR Molise 2014IT16M2OP001 (9) POR Puglia 2014IT16M2OP002 (10) POR Sardegna 2014IT05SFOP021 (11) POR Sicilia 2014IT05SFOP014 (12) POR Valle D’Aosta 2014IT05SFOP011 (13) PON SPAO 2014IT05SFOP002 (14) POR Toscana FSE 2014IT05SFOP015 (15) PON Inclusione 2014IT05SFOP001 (16) POR Lombardia FSE 2014IT05SFOP007 Pt_3_. 2. Measures 2.A, 2.B, 4.A, 4.C and 7.1 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (13) Training focused on integration in the labour market; (14) Reintegration in the schooling and training system for young people aged between 15 and 18; (15) Apprenticeship for qualification and professional diploma; (16) Apprenticeship for higher training and research; (17) Training for self-employment and self-entrepreneurship (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Friuli VG 2014IT05SFOP004 (8) POR Lazio 2014IT05SFOP005 (9) POR Liguria 2014IT05SFOP006 (10) POR Molise 2014IT16M2OP001 (11) POR Piemonte 2014IT05SFOP013 (12) POR Puglia 2014IT16M2OP002 (13) POR Sardegna 2014IT05SFOP021 (14) POR Sicilia 2014IT05SFOP014 (15) PO Trento 2014IT05SFOP018 (16) POR Umbria 2014IT05SFOP010 (17) POR Valle D’Aosta 2014IT05SFOP011 (18) PON SPAO 2014IT05SFOP002 (19) POR Toscana FSE 2014IT05SFOP015 (20) PON Inclusione 2014IT05SFOP001 (21) POR Lombardia 2014IT05SFOP007 Pt_4_. 2. Measure 3 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001)and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Friuli VG 2014IT05SFOP004 (8) POR Lazio 2014IT05SFOP005 (9) POR Liguria 2014IT05SFOP006 (10) POR Molise 2014IT16M2OP001 (11) POR Piemonte 2014IT05SFOP013 (12) POR Puglia 2014IT16M2OP002 (13) POR Sardegna 2014IT05SFOP021 (14) POR Sicilia 2014IT05SFOP014 (15) PO Trento 2014IT05SFOP018 (16) POR Umbria 2014IT05SFOP010 (17) POR Valle D’Aosta 2014IT05SFOP011 (18) PON SPAO 2014IT05SFOP002 (19) POR Lombardia 2014IT05SFOP007 (20) PON Inclusione 2014IT05SFOP001 Pt_5_. 2. Measure 5 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Friuli VG 2014IT05SFOP004 (8) POR Liguria 2014IT05SFOP006 (9) POR Molise 2014IT16M2OP001 (10) POR Piemonte 2014IT05SFOP013 (11) POR Puglia 2014IT16M2OP002 (12) POR Sardegna 2014IT05SFOP021 (13) POR Sicilia 2014IT05SFOP014 (14) PO Trento 2014IT05SFOP018 (15) POR Umbria 2014IT05SFOP010 (16) POR Valle D’Aosta 2014IT05SFOP011 (17) PON SPAO 2014IT05SFOP002 (18) POR Lombardia 2014IT05SFOP007 (19) PON Inclusione 2014IT05SFOP001 Pt_6_. 2. Measure 5 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Molise 2014IT16M2OP001 (8) POR Piemonte 2014IT05SFOP013 (9) POR Umbria 2014IT05SFOP010 (10) POR Valle D’Aosta 2014IT05SFOP011 (11) PON SPAO 2014IT05SFOP002 (12) POR Lombardia 2014IT05SFOP007 (13) PON Inclusione 2014IT05SFOP001 Pt_7_. 2. Measure 6 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) —POR Friuli VG 2014IT05SFOP004 (8) POR Lazio 2014IT05SFOP005 (9) POR Molise 2014IT16M2OP001 (10) POR Sardegna 2014IT05SFOP021 (11) POR Sicilia 2014IT05SFOP014 (12) PO Trento 2014IT05SFOP018 (13) POR Umbria 2014IT05SFOP010 (14) POR Valle D’Aosta 2014IT05SFOP011 (15) PON SPAO 2014IT05SFOP002 (16) POR Toscana FSE 2014IT05SFOP015 (17) —POR Lombardia 2014IT05SFOP007 (18) PON Inclusione 2014IT05SFOP001 Pt_8_. 2. Measure 7.1 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Liguria 2014IT05SFOP006 (7) POR Molise 2014IT16M2OP001 (8) POR Puglia 2014IT16M2OP002 (9) POR Sardegna 2014IT05SFOP021 (10) POR Sicilia 2014IT05SFOP014 (11) PO Trento 2014IT05SFOP018 (12) POR Umbria 2014IT05SFOP010 (13) POR Valle D’Aosta 2014IT05SFOP011 (14) PON SPAO 2014IT05SFOP002 (15) POR Toscana FSE 2014IT05SFOP015 (16) POR Lombardia 2014IT05SFOP007 (17) PON Inclusione 2014IT05SFOP001 Pt_9_. 2. Measure 8 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (a) Employment contracts following professional interregional mobility or professional transnational mobility; (b) Job interview under professional transnational mobility (26) Professional interregional mobility as per the amounts for more than 600 hours set out in point 3.4. (27) Professional transnational mobility for interview purposes as per the amounts set out in point 3.6. (28) Professional transnational mobility as per the amounts set out in point 3.7. (1) PON Ricerca 2014 IT16M20P005 (2) POR Basilicata FSE 2014IT05SFOP016 (3) POR Campania FSE 2014IT05SFOP020 (4) POR Puglia FESR FSE 2014IT16M2OP002 (5) POR Calabria FESR FSE 2014IT16M2OP006 (6) POR Abruzzo FSE 2014IT05SFOP009 (7) POR Sardegna FSE 2014IT05SFOP021 (8) POR Molise FESR FSE 2014IT16M2OP001 (9) POR Friuli Venezia Giulia FSE 2014IT05SFOP004 (10) POR Liguria FSE 2014IT05SFOP006 (11) POR Lombardia FSE 2014IT05SFOP007 (12) POR Valle D’Aosta FSE 2014IT05SFOP011 (13) POR Toscana FSE 2014IT05SFOP015 (14) PA Bolzano FSE 2014IT05SFOP017 (15) POR Sicilia FSE 2014IT05SFOP014 (16) POR Umbria FSE 2014IT05SFOP010 (17) POR Emilia Romagna FSE 2014IT05SFOP003 (18) PA Trento 2014IT05SFOP018 (10) Operations increasing the number of Industrial PhD positions under the following Operational Programmes: (11) Adult training under OP Education 2014IT05M20P001 (12) Activities related to Citizenship and the Rule of Law under OP Education 2014IT05M20P001 Pt_13_. 2. Classroom training under OP Education 2014IT05M20P001 Pt_14_. 2. Language training in context of transnational mobility under OP Education 2014IT05M20P001 Pt_15_. 2. Internships under OP Education 2014IT05M20P001 Pt_16_. 2. Language training and internships in the context of transnational mobility under OP Education 2014IT05M20P001 (1) 2014IT05SFOP016 (POR FSE Basilicata) (2) 2014IT16M2OP006 (POR FSE/FESR Calabria) (3) 2014IT05SFOP020 (POR FSE Campania) (4) 2014IT16M2OP002 (POR FSE/FESR Puglia) (5) 2014IT05SFOP014 (POR FSE Sicilia) (6) 2014IT05SFOP009 (POR FSE Abruzzo) (7) 2014IT16M2OP001 (POR FSE Molise) (8) 2014IT05SFOP021 (POR FSE Sardegna) (9) 2014IT05SFOP017 (POR FSE Bolzano) (10) 2014IT05SFOP003 (POR FSE Emilia-Romagna) (11) 2014IT05SFOP004 (POR FSE Friuli-Venezia Giulia) (12) 2014IT05SFOP005 (POR FSE Lazio) (13) 2014IT05SFOP006 (POR FSE Liguria) (14) 2014IT05SFOP007 (POR FSE Lombardia) (15) 2014IT05SFOP008 (POR FSE Marche) (16) 2014IT05SFOP013 (POR FSE Piemonte) (17) 2014IT05SFOP015 (POR FSE Toscana) (18) 2014IT05SFOP010 (POR FSE Umbria) (19) 2014IT05SFOP011 (POR FSE Valle d”Aosta) (20) 2014IT05SFOP012 (POR FSE Veneto) Pt_17_. 2. Training in Higher Technical Institutes under the following OPs: (1) 2014IT05SFOP011 (POR FSE Valle d’Aosta) (2) 2014IT05SFOP020 (POR FSE Campania) (3) 2014IT05SFOP004 (POR FSE Friuli-Venezia Giulia) (18) Mobility programmes for researchers under the OP 2014IT16M20P005 - 2014-2020 Research and Innovation Operating Programme, Axis I Human Capital, Action I.2. Mobility programmes for researchers and similar operations under: (19) Group training under measures 2.C, 5.bis, 6.bis, 8 of NOP YEI 2014IT05M9OP001 and for similar operations (including different target groups) carried out under NOP SAEP 2014IT05SFOP002 (39) Employment and training; (40) Linguistic training for voluntary civilian service in the EU; (41) Linguistic training for Professional transnational mobility; (42) Linguistic training for Traineeships in transnational mobility (20) Individual and individualised training as foreseen under measures 2.A, 2.B, 2.C, 4.A, 4.C of NOP YEI 2014IT05M9OP001 and for similar operations (including different target groups) carried out under NOP SAEP 2014IT05SFOP002. (44) Training focused on integration in the labour market; (45) Reintegration in the schooling and training system for young people between 15 and 18 years old; (46) Employment and training; (47) Apprenticeship for qualification and professional diploma; (48) Apprenticeship for higher training and research. (21) General training activities under measures 5.bis, 6.bis and 8 of NOP YEI 2014IT05M9OP001 and for similar operations (including different target groups) carried out under NOP SAEP 2014IT05SFOP002. (50) extra-curricular internships in transnational mobility; (51) voluntary civilian service in the EU; (52) transnational professional mobility projects. (22) Voluntary civilian service as foreseen under measure 6.bis of NOP YEI 2014IT05M9OP001 and for similar operations (including different target groups) carried out under NOP SAEP 2014IT05SFOP002 (54) Daily allowance for each day of effective stay abroad (55) Accomodation and meal contribution for each day of effective stay abroad Grp. 1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Hourly rate for 1st guidance level support All eligible costs, including direct staff costs. Number of hours providing 1st guidance level support. 34,00 Hourly rate for specialist or 2nd guidance level support. All eligible costs, including direct staff costs. Number of hours providing specialist or 2nd guidance level support. 35,50 Hourly rate for the following tranings: This hourly rate depends on the type of class (A, B or C) Hourly rate per student participating in the training All eligible costs, including direct staff costs and excluding any allowance paid to participants. Number of hours per training course differentiated by type of class, and the number of hours per student. TYPE OF CLASS HOURLY RATE PER COURSE HOURLY RATE PER STUDENT C 73,13 0,80 B 117,00 A 146,25 New employment contracts as a result of job coaching All eligible costs, including direct staff costs Number of new employment contracts, differentiated by type of contract and profile classification (from low to very high) Profile Classification LOW MEDIUM HIGH VERY HIGH Open-ended contract and 1st and 3rd level apprenticeship contract 1500 2000 2500 3000 2nd level apprenticeship, fixed-term and temporary contract ≥ 12 months 1000 1300 1600 2000 fixed-term and temporary contract 6-12 months 600 800 1000 1200 New regional/interregional/ transnational traineeships All eligible costs including direct staff costs for providing a traineeship. Number of traineeships, differentiated by profile classification. LOW MEDIUM HIGH VERY HIGH REGIONAL/INTERREGIONAL/ TRANSNATIONAL 200 300 400 500 Traineeships under interregional mobility Traineeships under transnational mobility For interregional mobility: all eligible costs, including travel, accommodation and meals, but excluding participant allowances For transnational mobility: all eligible costs. Number of traineeships, differentiated by location and, for interregional mobility, the length of traineeship. Interregional mobility as per the rates set out in point 3.4 Transnational mobility as per the rates set in point 3.5 30 hour block of general preparatory training for access to the voluntary civilian service. All eligible costs, including direct staff costs, excluding allowances and insurance. Number of participants completing the 30 hour block of training. 90 Hourly rate of support for self-employment and self-entrepreneurship All eligible costs, including direct staff costs, but excluding any allowance. Number of hours of support provided to participants. 40 All eligible costs (one off subsidy for travel, accommodation and meals, and an interview allowance), not including any additional allowances for disadvantaged people and any allowances for travel, accommodation or meals under interregional mobility provided by employer. Number of employment contracts or job interviews, differentiated by location Months spent working on PhD. All eligible costs for the participant (salary and associated social security contributions) and the institution providing the PhD (direct and indirect costs). Number of months spent working on PhD, according to location in Italy or abroad. Without a period spent abroad: 1927,63 per month With a period spent abroad: 2891,45 per month Participants gaining a certificate in adult training All categories of costs Number of participants gaining a certificate in adult training, differentiated by length of module and additional specific support 327 (30 hour module) 357 (30 hour module with additional specific support) 654 (60 hour module) 684 (60 hour module with additional specific support) 1090 (100 hour module) 1120 (100 hour module with additional specific support) Participants gaining a certificate in initiatives related to Citizenship and Rule of Law. All categories of costs Number of participants gaining a certificate related to Citizenship and Rule of Law, differentiated by length of module, additional specific support, and meal allowance. 191,10 (30 hour module) 221,10 (30 hours with additional specific support) 261,10 (30 hours with meal allowance) 291,10 (30 hours with additional specific support and meal allowance) 382,20 (60 hour module) 412,20 (60 hours with additional specific support) 522,20 (60 hours with meal allowance) 552,20 (60 hours with additional specific support and meal allowance) 637,00 (100 hour module) 667,00 (100 hours with additional specific support) 871,00 (100 hours with meal allowance) 901,00(100 hours with additional specific support and meal allowance) Participants gaining a certificate in classroom training All categories of costs Number of participants gaining a certificate in classroom training, differentiated by length of module, additional specific support and meal allowance. 360,60 (30 hour module) 390,60 (30 hours with additional specific support) 430,60 (30 hours with meal allowance) 460,60 (30 hours with additional specific support and meal allowance) 721,20 (60 hour module) 751,20 (60 hours with additional specific support) 861,20 (60 hours with meal allowance) 891,20 (60 hours with additional specific support and meal allowance) 1202,00 (100 hour module) 1232,00 (100 hours with additional specific support) 1436,00 (100 hours with meal allowance) 1466,00 (100 hours with additional specific support and meal allowance) Participants gaining a certificate in language training following transnational mobility. All categories of costs, except travel and accommodation costs for persons accompanying participants. Number of participants gaining a certificate in language training following transnational mobility, differentiated by length of module, country and length of stay, and distance travelled 774,00 (40 hour module) 1161,00 (60 hour module) 1548,00 (80 hour module) To these amounts for each participant can be added a daily amount to cover accommodation costs, differentiated by country, as set out in point 3.8 below, and the following amount for travel costs: Km Amount 100-499 500-1999 2000-2999 3000-3999 4000-7999 8000-19999 180 275 360 530 820 1100 Participants gaining an internship certificate, with or without transnational mobility. All categories of costs, except travel and accommodation for persons accompanying participants. Number of participants gaining an internship certificate, with or without transnational mobility, differentiated by length of module and, where transnational mobility is included, country, length of stay, and distance travelled 786,60 (60 hour module) 1179,90 (90 hour module) 1573,20 (120 hour module) 3146,40 (240 hour module) For internships with transnational mobility, these amounts for each participant can be supplemented by a daily amount to cover accommodation costs, differentiated by country, as set out in point 3.8 below, and the following amount for travel costs: Km Amount 100-499 500-1999 2000-2999 3000-3999 4000-7999 8000-19999 180 275 360 530 820 1100 Persons accompanying participants. Accommodation and travel costs Number of persons accompanying participants. Accommodation costs per participant, differentiated by country, as set out in point 3.8 below, and the following amount for travel costs: Km Amount 100-499 500-1999 2000-2999 3000-3999 4000-7999 8000-19999 180 275 360 530 820 1100 Participation in a training course in a Higher Technical Institute Completion of a training course in a Higher Technical Institute The unit costs cover all eligible categories of costs, except for costs related to courses run by certified centres that are compulsory for obtaining the mandatory certifications provided by the provisions of the Ministry of infrastructure and transportation, in the areas Mobility of people and goods — conduction of the naval vehicle and Mobility of people and goods — management of equipment and onboard assembly Number of hours of participation in a training course in a Higher Technical Institute In addition, number of participants who have successfully completed an academic year of a training course in a Higher Technical Institute. Hourly rate 49,93 For 2-year courses per completed year: 4809,50 For 3-year courses per completed year: 3206,30 Monthly cost for a researcher with a fixed-term contract All categories of costs. Number of months spent on site or off campus by a researcher hired under the law n.240/2010 for a period of 36 months, and selected through a public competition in a state or private university in one of the regions that are beneficiaries of the intervention. A. Without periods of activity off campus or abroad for researchers for line of activity mobility EUR 4885,38 B. With periods of activity off campus or abroad for researchers for line of activity mobility and for researchers under line of activity attraction EUR 5496,05 Hourly rate for the following tranings: This hourly rate depends on the type of class (A, B or C) Hourly rate per student participating in the training all eligible costs (personnel costs, other direct and indirect costs), except for any allowance Cost per hour of training per student plus cost for one hour of training course differentiated by class TYPE OF CLASS HOURLY RATE PER COURSE HOURLY RATE PER STUDENT C 73,13 0,80 B 117,00 A 146,25 Hourly rate for the following individual and individualised trainings: all eligible costs (personnel costs, other direct and indirect costs), except for any allowance Number of training hours and number of participants 40,00 General training courses carried out at the beginning of all eligible costs (personnel costs, other direct and indirect costs), except for any allowance Number of participants in a general training course with a minimum duration of 30 hours 180,00 all eligible costs (personnel costs, other direct costs, indirect costs, allowances and insurance costs), excluding travel costs Number of days of effective stay abroad. 15,00 — daily allowance to participant for each day of effective stay abroad 30,00 — accomodation and meal contribution to participant for each day of effective stay abroad (a) For standard scales of unit costs 1-9 and 19-20, the amounts may be adjusted where the FOI index (consumer price index for blue and white collar worker households, excluding tobacco products) shows a monetary revaluation equal to or exceeding 5 %. In particular, in a given year y, the adjustment is made if in a period y+t the difference between the benchmarking coefficients shown by the FOI index for such years is equal to or higher than 5 %. The base year applied — and on the basis of which the amounts were adjusted — is 2014. Where this rate is equal to or higher than 5 %, each unit cost may be adjusted accordingly. (b) For standard scale of unit costs 10, the rate may be adjusted by replacing the montly scholarship and/or social security contributions in the calculation method that consists of monthly scholarship plus social security contributions plus an amount for all other costs. Updated data can be found in amendments to the Ministerial Decree of 18.6.2008 (which defines the total gross annual amount of PhD scholarships) and biannual adjustment of the rate of social security contributions (Circular letter No 13 of 29/01/2016 of the Director-General of INPS, the National Institute for Social Security). (c) For standard scales of unit costs 11-15, which are based on the historical average number of certificates (output) awarded per module, the rate may be adjusted at the end of each financial year (31/12) following an assessment by the Managing Authority of the implementation of the operations related to each of the unit costs. Where such an assessment shows a divergence in the average number of certificates awarded per module for each type of training as compared to the average number used as the basis for calculating the existing unit cost, then a new unit cost will be calculated according to the following formula: (d) For standard scales of unit costs 17, the rates will be reviewed every four years and if, taking 2017 as the reference year, there is an increase of more than 5 % an adjustment will be made by ISTAT based on the FOI consumer price index (consumer price index for blue and white collar worker households, excluding tobacco products). (e) For standard scales of unit costs 18, the rates may be adjusted following amendments of the current legislation (which includes Law n.240/2010, the Presidential Decree n.232/2011, the Law n.232/2016 (Budget Law 2017), Law n.448/1998 Misure di finanza pubblica per la stabilizzazione e lo sviluppo, Law n.335/1995, Legislative Decree n.446/1997, and the Presidential Decree n.1032/1973.) as well as changes of the social security contribution rates. (f) The amounts for unit costs 21 and 22 may be adapted following amendments to the legislative provisions of Legislative Decree 77/2002, Directorial Determination (DD) of 19 December 2007 and D.D. n. 348 of 18 May 2016 of the Presidency of the Council of Ministers — Department of Youth and Civilian Service Grp. 31. Interregional travel costs (in EUR) Region of origin Travel costs Destination region Valle d’Aosta PA Bolzano PA Trento Liguria Piemonte Lombardia Veneto Friuli Venezia Giulia Emilia-Romagna Toscana Marche Abruzzo Umbria Lazio Campania Molise Basilicata Puglia Calabria Sicilia Sardegna Abruzzo 269,30 211,17 198,50 148,63 231,83 232,74 201,95 226,34 167,99 68,60 58,98 0,00 23,32 25,81 125,43 45,79 83,99 93,05 164,82 165,16 182,46 Basilicata 271,11 236,02 227,31 236,81 294,55 239,98 259,23 264,89 201,50 176,59 97,35 83,99 142,75 67,92 33,96 31,24 0,00 55,47 71,43 114,33 224,18 Calabria 369,32 285,04 273,72 242,02 351,32 340,51 304,28 304,39 270,32 238,63 243,15 164,82 178,18 139,01 90,33 85,58 71,43 69,05 0,00 75,62 280,55 Campania 253,00 271,68 259,06 113,20 246,78 221,87 165,84 302,24 178,86 160,74 169,86 125,43 151,01 99,62 0,00 21,28 33,96 89,20 90,33 113,20 190,22 Emilia-Romagna 146,48 81,50 74,71 38,26 129,05 92,82 63,39 55,47 0,00 54,34 62,26 167,99 52,07 131,31 178,86 160,52 201,50 140,37 270,32 292,06 188,94 Friuli Venezia Giulia 129,05 103,24 82,30 120,22 175,52 99,62 37,36 0,00 55,47 70,18 163,01 226,34 162,50 113,20 302,24 218,87 264,89 241,12 304,39 325,00 279,13 Lazio 230,31 172,06 160,74 129,05 210,55 201,50 165,27 113,20 131,31 99,62 70,18 25,81 54,34 0,00 99,62 29,21 67,92 113,20 139,01 138,10 156,65 Liguria 53,66 113,94 105,11 0,00 36,22 49,81 106,41 120,22 38,26 67,47 118,07 148,63 75,50 129,05 113,20 152,03 236,81 250,17 242,02 231,61 224,15 Lombardia 59,37 97,35 76,47 49,81 67,92 0,00 69,05 99,62 92,82 113,20 108,67 232,74 84,90 201,50 221,87 223,91 239,98 179,99 340,51 335,07 179,51 Marche 200,25 84,90 76,98 118,07 119,99 108,67 70,18 163,01 62,26 108,11 0,00 58,98 43,92 70,18 169,86 75,96 97,35 107,54 243,15 216,21 251,20 Molise 259,51 196,06 194,31 152,03 232,97 223,91 194,48 218,87 160,52 126,56 75,96 45,79 106,75 29,21 21,28 0,00 31,24 70,30 85,58 140,48 185,85 PA Bolzano 118,58 0,00 36,22 113,94 151,35 97,35 96,22 103,24 81,50 110,94 84,90 67,92 127,01 172,06 271,68 196,06 236,02 138,10 285,04 310,17 273,47 PA Trento 112,24 36,22 0,00 105,11 147,22 76,47 19,02 82,30 74,71 99,62 76,98 198,50 120,44 160,74 259,06 194,31 227,31 132,44 273,72 308,24 247,26 Piemonte 17,43 151,35 147,22 36,22 0,00 67,92 103,01 175,52 129,05 147,16 119,99 231,83 181,74 210,55 246,78 232,97 294,55 191,31 351,32 273,60 187,92 Puglia 275,59 138,10 132,44 250,17 191,31 179,99 164,71 241,12 140,37 212,82 107,54 93,05 156,78 113,20 89,20 70,30 55,47 0,00 69,05 147,61 279,42 Sardegna 205,36 273,47 247,26 224,15 187,92 179,51 248,56 279,13 188,94 189,41 251,20 182,46 210,98 156,65 190,22 185,85 224,18 279,42 280,55 185,82 0,00 Sicilia 350,35 310,17 308,24 231,61 273,60 335,07 303,38 325,00 292,06 273,94 216,21 165,16 189,50 138,10 113,20 140,48 114,33 147,61 75,62 0,00 185,82 Toscana 169,12 110,94 99,62 67,47 147,16 113,20 95,09 70,18 54,34 0,00 108,11 68,60 36,22 99,62 160,74 126,56 176,59 212,82 238,63 273,94 189,41 Umbria 199,18 127,01 120,44 75,50 181,74 84,90 125,14 162,50 52,07 36,22 43,92 23,32 0,00 54,34 151,01 106,75 142,75 156,78 178,18 189,50 210,98 Valle d’Aosta 0,00 118,58 112,24 53,66 17,43 59,37 155,03 129,05 146,48 169,12 200,25 269,30 199,18 230,31 253,00 259,51 271,11 275,59 369,32 350,35 205,36 Veneto 155,03 96,22 19,02 106,41 103,01 69,05 0,00 37,36 63,39 95,09 70,18 201,95 125,14 165,27 165,84 194,48 259,23 164,71 304,28 303,38 248,56 Grp. 32. Interregional accommodation costs (for more than 600 hours) (in EUR) Region of origin ACCOMMODATION COSTS Destination region Valle d’Aosta PA Bolzano PA Trento Liguria Piemonte Lombardia Veneto Friuli Venezia Giulia Emilia-Romagna Toscana Marche Abruzzo Umbria Lazio Campania Molise Basilicata Puglia Calabria Sicilia Sardegna Abruzzo 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Basilicata 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Calabria 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Campania 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Emilia-Romagna 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Friuli Venezia Giulia 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Lazio 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Liguria 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Lombardia 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Marche 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Molise 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 PA Bolzano 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 PA Trento 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Piemonte 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Puglia 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Sardegna 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Sicilia 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Toscana 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Umbria 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Valle d’Aosta 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Veneto 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Grp. 33. Interregional subsistence costs (for more than 600 hours) (in EUR) Region of origin MEAL COSTS Destination region Valle d’Aosta PA Bolzano PA Trento Liguria Piemonte Lombardia Veneto Friuli Venezia Giulia Emilia-Romagna Toscana Marche Abruzzo Umbria Lazio Campania Molise Basilicata Puglia Calabria Sicilia Sardegna Abruzzo 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Basilicata 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Calabria 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Campania 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Emilia-Romagna 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Friuli Venezia Giulia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Lazio 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Liguria 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Lombardia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Marche 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Molise 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 PA Bolzano 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 PA Trento 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Piemonte 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Puglia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Sardegna 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Sicilia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Toscana 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Umbria 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Valle d’Aosta 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Veneto 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Grp. 34. Interregional allowances for traineeships (in EUR) No. of training hours Abruzzo Basilicata Calabria Campania Emilia Romagna Friuli Venezia Giulia Lazio Liguria Lombardia Marche Molise PA Bolzano PA Trento Piemonte Puglia Sardegna Sicilia Toscana Umbria Valle d’Aosta Veneto Region where the training is taking place Valle d’Aosta 160 611,70 613,51 711,72 595,40 488,88 471,45 572,71 396,06 401,77 542,65 601,91 460,98 454,64 359,83 617,99 547,76 692,75 511,52 541,58 - 497,43 161-200 613,84 615,65 713,86 597,54 491,02 473,59 574,85 398,20 403,91 544,79 604,05 463,12 456,78 361,97 620,13 549,90 694,89 513,66 543,72 - 499,57 201-249 699,44 701,25 799,46 683,14 576,62 559,19 660,45 483,80 489,51 630,39 689,65 548,72 542,38 447,57 705,73 635,50 780,49 599,26 629,32 - 585,17 250-300 804,30 806,11 904,32 788,00 681,48 664,05 765,31 588,66 594,37 735,25 794,51 653,58 647,24 552,43 810,59 740,36 885,35 704,12 734,18 - 690,03 301-600 913,44 915,25 1.013,46 897,14 790,62 773,19 874,45 697,80 703,51 844,39 903,65 762,72 756,38 661,57 919,73 849,50 994,49 813,26 843,32 - 799,17 > 600 1555,44 1557,25 1655,46 1539,14 1432,62 1415,19 1516,45 1339,80 1345,51 1486,39 1545,65 1404,72 1398,38 1303,57 1561,73 1491,50 1636,49 1455,26 1485,32 - 1441,17 Bolzano 160 585,59 610,44 659,45 646,09 455,92 477,65 546,48 488,35 471,77 459,31 570,48 - 410,64 525,76 512,52 647,88 684,58 485,35 501,42 492,99 470,63 161-200 587,93 612,78 661,79 648,43 458,26 479,99 548,82 490,69 474,11 461,65 572,82 - 412,98 528,10 514,86 650,22 686,92 487,69 503,76 495,33 472,97 201-249 681,53 706,38 755,39 742,04 551,86 573,60 642,42 584,29 567,71 555,26 666,42 - 506,58 621,71 608,46 743,83 780,53 581,29 597,37 588,93 566,58 250-300 796,20 821,04 870,06 856,70 666,53 688,26 757,09 698,96 682,37 669,92 781,08 - 621,25 736,37 723,13 858,49 895,19 695,96 712,03 703,60 681,24 301-600 915,54 940,39 989,40 976,05 785,87 807,60 876,43 818,30 801,72 789,27 900,43 - 740,59 855,71 842,47 977,83 1.014,53 815,30 831,38 822,94 800,59 > 600 1617,57 1642,41 1691,43 1678,07 1487,90 1509,63 1578,46 1520,33 1503,74 1491,29 1602,45 - 1442,62 1557,74 1544,50 1679,86 1716,56 1517,33 1533,40 1524,97 1502,61 Trento 160 493,91 522,71 569,13 554,47 370,12 377,71 456,15 400,52 371,88 372,38 489,72 331,63 - 442,63 427,85 542,67 603,65 395,02 415,85 407,65 314,43 161-200 495,75 524,56 570,97 556,31 371,97 379,55 458,00 402,36 373,72 374,23 491,56 333,48 - 444,47 429,70 544,52 605,50 396,87 417,70 409,49 316,27 201-249 569,60 598,41 644,82 630,17 445,82 453,40 531,85 476,21 447,57 448,08 565,42 407,33 - 518,32 503,55 618,37 679,35 470,72 491,55 483,35 390,12 250-300 660,07 688,88 735,29 720,63 536,29 543,87 622,32 566,68 538,04 538,55 655,88 497,80 - 608,79 594,02 708,84 769,82 561,19 582,02 573,81 480,59 301-600 754,23 783,04 829,46 814,80 630,45 638,03 716,48 660,84 632,20 632,71 750,05 591,96 - 702,95 688,18 803,00 863,98 655,35 676,18 667,98 574,76 > 600 1308,13 1336,93 1383,35 1368,69 1184,34 1191,93 1270,37 1214,74 1186,10 1186,61 1303,94 1145,85 - 1256,85 1242,07 1356,89 1417,87 1209,25 1230,07 1221,87 1128,65 Liguria 160 454,43 542,61 547,82 419,00 344,06 426,02 434,85 - 355,61 423,87 457,83 419,74 410,91 342,02 555,97 529,95 537,41 373,27 381,30 359,46 412,21 161-200 456,34 544,52 549,73 420,91 345,97 427,93 436,76 - 357,52 425,78 459,74 421,65 412,82 343,93 557,88 531,86 539,32 375,18 383,21 361,37 414,12 201-249 532,79 620,97 626,18 497,36 422,42 504,38 513,21 - 433,97 502,23 536,19 498,10 489,27 420,38 634,33 608,31 615,77 451,63 459,66 437,82 490,57 250-300 626,44 714,63 719,83 591,01 516,07 598,03 606,86 - 527,62 595,88 629,84 591,75 582,92 514,04 727,98 701,96 709,42 545,28 553,32 531,47 584,22 301-600 723,92 812,10 817,31 688,48 613,55 695,50 704,33 - 625,09 693,35 727,31 689,22 680,39 611,51 825,46 799,43 806,89 642,75 650,79 628,94 681,69 > 600 1297,29 1385,47 1390,68 1261,86 1186,92 1268,88 1277,71 - 1198,47 1266,73 1300,69 1262,59 1253,76 1184,88 1398,83 1372,81 1380,27 1216,13 1224,16 1202,32 1255,07 Piemonte 160 555,86 618,58 675,35 570,81 453,08 499,55 534,58 360,26 391,95 444,02 557,00 475,38 471,25 - 515,34 511,95 597,64 471,19 505,77 341,46 427,04 161-200 557,89 620,60 677,37 572,83 455,10 501,57 536,61 362,28 393,98 446,05 559,02 477,40 473,27 - 517,36 513,98 599,66 473,22 507,80 343,49 429,07 201-249 638,90 701,61 758,38 653,84 536,11 582,58 617,62 443,29 474,98 527,06 640,03 558,41 554,28 - 598,37 594,99 680,67 554,22 588,81 424,50 510,08 250-300 738,13 800,85 857,61 753,07 635,35 681,82 716,85 542,52 574,22 626,29 739,26 657,65 653,52 - 697,61 694,22 779,90 653,46 688,04 523,73 609,31 301-600 841,42 904,13 960,90 856,36 738,63 785,10 820,14 645,81 677,50 729,58 842,55 760,93 756,80 - 800,89 797,51 883,19 756,74 791,33 627,02 712,60 > 600 1448,98 1511,69 1568,46 1463,92 1346,19 1392,66 1427,69 1253,37 1285,06 1337,13 1450,11 1368,49 1364,36 - 1408,45 1405,07 1490,75 1364,30 1398,88 1234,57 1320,15 Lombardia 160 693,90 701,15 801,67 683,03 553,99 560,78 662,66 510,97 - 569,83 685,07 558,51 537,63 529,08 641,15 640,67 796,23 574,36 546,06 520,54 530,21 161-200 696,78 704,03 804,55 685,92 556,87 563,66 665,54 513,85 - 572,72 687,95 561,40 540,51 531,96 644,03 643,56 799,12 577,24 548,94 523,42 533,10 201-249 812,07 819,32 919,84 801,21 672,16 678,95 780,83 629,14 - 688,01 803,24 676,69 655,80 647,26 759,32 758,85 914,41 692,54 664,24 638,71 648,39 250-300 953,31 960,55 1061,07 942,44 813,39 820,18 922,06 770,37 - 829,24 944,48 817,92 797,03 788,49 900,55 900,08 1055,64 833,77 805,47 779,94 789,62 301-600 1100,30 1107,55 1208,07 1089,43 960,39 967,18 1069,06 917,37 - 976,23 1091,47 964,91 944,03 935,48 1047,55 1047,07 1202,63 980,76 952,46 926,94 936,61 > 600 1964,98 1972,23 2072,75 1954,11 1825,07 1831,86 1933,74 1782,05 - 1840,91 1956,15 1829,59 1808,71 1800,16 1912,23 1911,75 2067,31 1845,44 1817,14 1791,61 1801,29 Veneto 160 499,08 556,36 601,42 462,97 360,53 334,49 462,41 403,54 366,19 367,32 491,61 393,36 316,15 400,15 461,84 545,70 600,51 392,22 422,28 452,16 - 161-200 500,94 558,22 603,27 464,83 362,38 336,35 464,26 405,40 368,04 369,18 493,47 395,21 318,01 402,00 463,70 547,56 602,37 394,08 424,13 454,02 - 201-249 575,22 632,50 677,56 539,11 436,67 410,63 538,55 479,68 442,33 443,46 567,75 469,50 392,29 476,29 537,98 621,84 676,65 468,36 498,42 528,30 - 250-300 666,22 723,50 768,56 630,11 527,67 501,63 629,55 570,68 533,33 534,46 658,75 560,49 483,29 567,29 628,98 712,84 767,65 559,36 589,42 619,30 - 301-600 760,93 818,21 863,27 724,82 622,38 596,34 724,26 665,39 628,04 629,17 753,46 655,21 578,00 662,00 723,69 807,55 862,36 654,07 684,13 714,01 - > 600 1318,06 1375,34 1420,39 1281,95 1179,51 1153,47 1281,39 1222,52 1185,17 1186,30 1310,59 1212,33 1135,13 1219,13 1280,82 1364,68 1419,49 1211,20 1241,26 1271,14 - Friuli Venezia Giulia 160 577,72 616,26 655,77 653,62 406,84 - 464,57 471,59 450,99 514,38 570,24 454,61 433,67 526,89 592,49 630,50 676,37 421,56 513,87 480,42 388,73 161-200 579,91 618,46 657,96 655,81 409,04 - 466,77 473,79 453,18 516,58 572,44 456,81 435,86 529,08 594,68 632,70 678,57 423,75 516,07 482,62 390,92 201-249 667,75 706,30 745,81 743,66 496,88 - 554,61 561,63 541,03 604,42 660,28 544,65 523,71 616,93 682,53 720,54 766,41 511,60 603,91 570,46 478,77 250-300 775,36 813,91 853,41 851,26 604,49 - 662,22 669,24 648,63 712,03 767,89 652,26 631,32 724,54 790,13 828,15 874,02 619,20 711,52 678,07 586,37 301-600 887,36 925,91 965,41 963,26 716,49 - 774,22 781,24 760,63 824,03 879,89 764,26 743,31 836,54 902,13 940,15 986,02 731,20 823,52 790,07 698,37 > 600 1546,18 1584,73 1624,24 1622,09 1375,31 - 1433,04 1440,06 1419,46 1482,85 1538,71 1423,08 1402,14 1495,36 1560,96 1598,97 1644,84 1390,03 1482,34 1448,89 1357,20 No. of training hours Abruzzo Basilicata Calabria Campania EmiliaRomagna FriuliVeneziaGiulia Lazio Liguria Lombardia Marche Molise PABolzano PATrento Piemonte Puglia Sardegna Sicilia Toscana Umbria Valled’Aosta Veneto Region where the training is taking place Emilia Romagna 160 562,62 596,13 664,95 573,49 - 450,10 525,95 432,89 487,46 456,89 555,15 476,14 469,35 523,68 535,00 583,58 686,69 448,97 446,71 541,11 458,03 161-200 565,09 598,60 667,42 575,96 - 452,57 528,41 435,36 489,92 459,36 557,62 478,60 471,81 526,15 537,47 586,04 689,16 451,44 449,17 543,58 460,49 201-249 663,75 697,25 766,08 674,61 - 551,23 627,07 534,02 588,58 558,02 656,28 577,26 570,47 624,81 636,13 684,70 787,81 550,09 547,83 642,24 559,15 250-300 784,60 818,11 886,94 795,47 - 672,08 747,93 654,88 709,44 678,87 777,13 698,12 691,33 745,66 756,98 805,56 908,67 670,95 668,69 763,10 680,01 301-600 910,39 943,90 1012,73 921,26 - 797,87 873,72 780,67 835,23 804,66 902,92 823,91 817,12 871,45 882,77 931,35 1034,46 796,74 794,48 888,88 805,80 > 600 1650,33 1683,84 1752,66 1661,20 - 1537,81 1613,65 1520,60 1575,16 1544,60 1642,86 1563,84 1557,05 1611,39 1622,71 1671,28 1774,40 1536,68 1534,41 1628,82 1545,73 Toscana 160 448,73 556,73 618,76 540,88 434,47 450,32 479,75 447,60 493,34 488,24 506,69 491,07 479,75 527,30 592,95 569,54 654,08 - 416,36 549,26 475,22 161-200 451,11 559,10 621,14 543,26 436,85 452,70 482,13 449,98 495,71 490,62 509,07 493,45 482,13 529,67 595,33 571,92 656,46 - 418,74 551,63 477,60 201-249 546,14 654,14 716,17 638,29 531,88 547,73 577,16 545,01 590,75 585,65 604,10 588,48 577,16 624,71 690,36 666,95 751,49 - 513,77 646,67 572,63 250-300 662,56 770,55 832,59 754,71 648,30 664,15 693,58 661,43 707,16 702,07 720,52 704,90 693,58 741,12 806,78 783,37 867,91 - 630,19 763,08 689,05 301-600 783,73 891,72 953,76 875,87 769,47 785,31 814,75 782,60 828,33 823,24 841,69 826,07 814,75 862,29 927,95 904,54 989,07 - 751,35 884,25 810,22 > 600 1496,48 1604,48 1666,51 1588,63 1482,22 1498,07 1527,50 1495,35 1541,08 1535,99 1554,44 1538,82 1527,50 1575,04 1640,70 1617,29 1701,83 - 1464,11 1597,01 1522,97 Marche 160 347,07 385,44 531,24 457,95 350,35 451,10 358,27 406,16 396,76 - 364,05 372,99 365,07 408,08 395,63 539,29 504,30 396,20 332,01 488,34 358,27 161-200 348,87 387,24 533,04 459,75 352,15 452,90 360,07 407,96 398,56 - 365,85 374,79 366,87 409,88 397,43 541,09 506,10 398,00 333,81 490,14 360,07 201-249 420,89 459,27 605,07 531,77 424,17 524,92 432,10 479,98 470,59 - 437,87 446,81 438,89 481,91 469,45 613,12 578,13 470,02 405,83 562,16 432,10 250-300 509,12 547,49 693,29 620,00 512,40 613,15 520,32 568,21 558,81 - 526,10 535,04 527,12 570,13 557,68 701,34 666,35 558,25 494,06 650,39 520,32 301-600 600,95 639,32 785,12 711,83 604,23 704,98 612,15 660,04 650,64 - 617,93 626,87 618,95 661,96 649,51 793,17 758,18 650,08 585,89 742,22 612,15 > 600 1141,12 1179,49 1325,29 1251,99 1144,40 1245,15 1152,32 1200,21 1190,81 - 1158,10 1167,04 1159,11 1202,13 1189,68 1333,34 1298,35 1190,24 1126,06 1282,39 1152,32 Abruzzo 160 - 353,35 434,18 394,78 437,35 495,70 295,17 417,99 502,10 328,34 315,15 337,28 467,86 501,19 362,41 451,81 434,52 337,96 292,68 538,66 471,31 161-200 - 355,04 435,86 396,47 439,03 497,39 296,85 419,67 503,78 330,02 316,83 338,96 469,54 502,88 364,09 453,50 436,20 339,64 294,36 540,35 472,99 201-249 - 422,38 503,20 463,81 506,37 564,73 364,19 487,01 571,12 397,36 384,17 406,30 536,88 570,22 431,43 520,84 503,54 406,98 361,70 607,69 540,33 250-300 - 504,87 585,69 546,30 588,86 647,22 446,68 569,51 653,61 479,85 466,66 488,79 619,37 652,71 513,92 603,33 586,03 489,47 444,19 690,18 622,82 301-600 - 590,73 671,55 632,16 674,72 733,08 532,54 655,36 739,47 565,71 552,52 574,65 705,23 738,57 599,78 689,19 671,89 575,33 530,05 776,03 708,68 > 600 - 1095,77 1176,60 1137,21 1179,77 1238,12 1037,59 1160,41 1244,52 1070,76 1057,57 1079,70 1210,28 1243,61 1104,83 1194,24 1176,94 1080,38 1035,10 1281,08 1213,73 Umbria 160 361,45 480,87 516,31 489,14 390,20 500,63 392,46 413,63 423,03 382,05 444,88 465,14 458,57 519,87 494,91 549,11 527,63 374,35 - 537,30 463,27 161-200 363,56 482,99 518,42 491,25 392,31 502,74 394,58 415,75 425,14 384,16 446,99 467,25 460,69 521,98 497,02 551,22 529,74 376,47 - 539,42 465,38 201-249 448,09 567,52 602,95 575,78 476,85 587,27 479,11 500,28 509,67 468,70 531,52 551,78 545,22 606,52 581,56 635,76 614,27 461,00 - 623,95 549,92 250-300 551,65 671,07 706,50 679,34 580,40 690,82 582,66 603,83 613,23 572,25 635,07 655,34 648,77 710,07 685,11 739,31 717,82 564,55 - 727,50 653,47 301-600 659,42 778,85 814,28 787,11 688,18 798,60 690,44 711,61 721,00 680,03 742,85 763,12 756,55 817,85 792,89 847,09 825,60 672,33 - 835,28 761,25 > 600 1293,42 1412,84 1448,27 1421,11 1322,17 1432,59 1324,43 1345,60 1355,00 1314,02 1376,84 1397,11 1390,54 1451,84 1426,88 1481,08 1459,59 1306,32 - 1469,27 1395,24 Lazio 160 512,01 554,12 625,21 585,81 617,51 599,40 - 615,25 687,69 556,38 515,40 658,26 646,94 696,75 599,40 642,84 624,30 585,81 540,53 716,50 651,47 161-200 515,05 557,16 628,25 588,85 620,55 602,44 - 618,28 690,73 559,42 518,44 661,30 649,98 699,79 602,44 645,88 627,34 588,85 543,57 719,54 654,51 201-249 636,60 678,71 749,80 710,40 742,10 723,99 - 739,83 812,28 680,97 639,99 782,85 771,53 821,34 723,99 767,43 748,89 710,40 665,12 841,09 776,06 250-300 785,49 827,60 898,69 859,30 891,00 872,88 - 888,73 961,18 829,87 788,89 931,75 920,43 970,24 872,88 916,33 897,79 859,30 814,02 989,99 924,96 301-600 940,47 982,58 1053,67 1014,27 1045,97 1027,86 - 1043,71 1116,15 984,84 943,86 1086,72 1075,40 1125,21 1027,86 1071,31 1052,76 1014,27 968,99 1144,96 1079,93 > 600 1852,09 1894,20 1965,29 1925,89 1957,59 1939,48 - 1955,33 2027,77 1896,46 1855,48 1998,34 1987,02 2036,83 1939,48 1982,93 1964,38 1925,89 1880,61 2056,58 1991,55 Campania 160 452,64 361,17 417,55 - 506,07 629,46 426,83 440,41 549,08 497,07 348,49 598,89 586,27 573,99 416,41 517,43 440,41 487,96 478,22 580,21 493,05 161-200 454,68 363,22 419,59 - 508,11 631,50 428,87 442,46 551,13 499,11 350,54 600,94 588,32 576,03 418,46 519,48 442,46 490,00 480,27 582,26 495,10 201-249 536,49 445,02 501,39 - 589,92 713,30 510,68 524,26 632,93 580,92 432,34 682,74 670,12 657,84 500,26 601,28 524,26 571,80 562,07 664,06 576,90 250-300 636,69 545,23 601,60 - 690,13 813,51 610,89 624,47 733,14 681,13 532,55 782,95 770,33 758,05 600,47 701,49 624,47 672,01 662,28 764,27 677,11 301-600 740,99 649,53 705,90 - 794,42 917,81 715,18 728,77 837,44 785,42 636,85 887,25 874,63 862,34 704,77 805,79 728,77 776,31 766,58 868,57 781,41 > 600 1354,52 1263,05 1319,43 - 1407,95 1531,34 1328,71 1342,29 1450,96 1398,95 1250,37 1500,77 1488,15 1475,87 1318,29 1419,31 1342,29 1389,84 1380,10 1482,09 1394,93 Molise 160 354,06 339,51 393,85 329,55 468,79 527,14 337,48 460,30 532,18 384,23 - 504,33 502,58 541,24 378,57 494,12 448,75 434,83 415,02 567,78 502,75 161-200 355,99 341,44 395,78 331,48 470,71 529,07 339,40 462,22 534,11 386,15 - 506,26 504,50 543,16 380,49 496,05 450,68 436,75 416,94 569,71 504,67 201-249 433,05 418,51 472,84 408,55 547,78 606,14 416,47 539,29 611,17 463,22 - 583,33 581,57 620,23 457,56 573,12 527,75 513,82 494,01 646,78 581,74 250-300 527,46 512,92 567,25 502,95 642,19 700,54 510,88 633,70 705,58 557,63 - 677,73 675,98 714,64 551,97 667,52 622,15 608,23 588,42 741,18 676,15 301-600 625,72 611,18 665,51 601,21 740,45 798,81 609,14 731,96 803,84 655,89 - 776,00 774,24 812,90 650,23 765,78 720,41 706,49 686,68 839,44 774,41 > 600 1203,73 1189,18 1243,52 1179,22 1318,46 1376,81 1187,14 1309,97 1381,85 1233,90 - 1354,00 1352,25 1390,90 1228,24 1343,79 1298,42 1284,50 1264,69 1417,45 1352,42 No. of training hours Abruzzo Basilicata Calabria Campania EmiliaRomagna FriuliVeneziaGiulia Lazio Liguria Lombardia Marche Molise PABolzano PATrento Piemonte Puglia Sardegna Sicilia Toscana Umbria Valled’Aosta Veneto Region where the training is taking place Basilicata 160 320,95 - 308,39 270,92 438,46 501,85 304,88 473,77 476,94 334,31 268,20 472,98 464,27 531,51 292,43 461,14 351,29 413,55 379,71 508,07 496,19 161-200 322,44 - 309,87 272,40 439,94 503,33 306,36 475,26 478,43 335,79 269,68 474,46 465,75 532,99 293,91 462,62 352,77 415,03 381,19 509,56 497,67 201-249 381,68 - 369,11 331,64 499,18 562,57 365,60 534,50 537,67 395,03 328,92 533,70 524,99 592,23 353,15 521,86 412,01 474,27 440,43 568,80 556,91 250-300 454,25 - 441,68 404,21 571,75 635,14 438,17 607,07 610,23 467,60 401,49 606,27 597,56 664,80 425,72 594,43 484,58 546,84 513,00 641,36 629,48 301-600 529,78 - 517,21 479,74 647,28 710,67 513,70 682,60 685,77 543,13 477,02 681,80 673,09 740,33 501,25 669,96 560,11 622,37 588,53 716,90 705,01 > 600 974,08 - 961,51 924,04 1091,58 1154,97 958,00 1126,90 1130,07 987,43 921,33 1126,10 1117,39 1184,63 945,55 1114,26 1004,41 1066,67 1032,83 1161,20 1149,31 Puglia 160 372,30 334,71 348,30 368,45 419,61 520,36 392,45 529,42 459,23 386,79 349,54 417,35 411,69 470,55 - 558,67 426,86 492,06 436,03 554,83 443,95 161-200 374,04 336,46 350,04 370,19 421,36 522,11 394,19 531,16 460,98 388,53 351,29 419,09 413,43 472,30 - 560,41 428,60 493,81 437,77 556,58 445,70 201-249 443,85 406,27 419,85 440,00 491,17 591,92 464,00 600,97 530,79 458,34 421,10 488,91 483,25 542,11 - 630,22 498,41 563,62 507,58 626,39 515,51 250-300 529,37 491,79 505,37 525,52 576,69 677,44 549,52 686,49 616,31 543,86 506,62 574,42 568,76 627,63 - 715,74 583,93 649,14 593,10 711,91 601,03 301-600 618,38 580,80 594,38 614,53 665,70 766,45 638,53 775,50 705,32 632,87 595,63 663,43 657,77 716,64 - 804,75 672,94 738,15 682,11 800,92 690,04 > 600 1141,97 1104,38 1117,97 1138,12 1189,28 1290,03 1162,11 1299,09 1228,90 1156,45 1119,21 1187,02 1181,36 1240,22 - 1328,34 1196,53 1261,73 1205,70 1324,50 1213,62 Calabria 160 447,87 354,48 - 373,38 553,37 587,45 422,06 525,07 623,56 526,20 368,63 568,09 556,77 634,37 352,10 563,61 358,67 521,68 461,23 652,37 587,33 161-200 449,64 356,25 - 375,15 555,14 589,22 423,83 526,84 625,33 527,97 370,40 569,86 558,54 636,14 353,87 565,38 360,44 523,45 463,00 654,14 589,10 201-249 520,40 427,01 - 445,92 625,90 659,98 494,59 597,60 696,09 598,74 441,16 640,62 629,30 706,90 424,64 636,14 431,20 594,21 533,76 724,90 659,86 250-300 607,09 513,70 - 532,60 712,59 746,66 581,28 684,29 782,77 685,42 527,85 727,31 715,99 793,58 511,32 722,82 517,89 680,89 620,44 811,58 746,55 301-600 697,31 603,92 - 622,82 802,81 836,88 671,50 774,51 873,00 775,64 618,07 817,53 806,21 883,81 601,54 813,04 608,11 771,12 710,67 901,81 836,77 > 600 1228,03 1134,64 - 1153,54 1333,53 1367,61 1202,22 1305,23 1403,72 1306,36 1148,79 1348,25 1336,93 1414,53 1132,26 1343,77 1138,83 1301,84 1241,39 1432,53 1367,49 Sicilia 160 523,88 473,06 434,34 471,93 650,78 683,72 496,83 590,33 693,80 574,94 499,21 668,89 666,97 632,33 506,34 544,54 - 632,67 548,22 709,08 662,10 161-200 526,13 475,30 436,59 474,17 653,02 685,96 499,07 592,57 696,04 577,18 501,45 671,14 669,21 634,57 508,58 546,79 - 634,91 550,46 711,32 664,34 201-249 615,81 564,98 526,27 563,85 742,70 775,65 588,75 682,26 785,72 666,86 591,13 760,82 758,89 724,25 598,26 636,47 - 724,59 640,15 801,00 754,02 250-300 725,67 674,84 636,13 673,71 852,56 885,51 698,61 792,12 895,58 776,72 700,99 870,68 868,75 834,11 708,12 746,33 - 834,45 750,01 910,86 863,88 301-600 840,01 789,18 750,47 788,05 966,91 999,85 812,96 906,46 1009,92 891,06 815,33 985,02 983,10 948,46 822,46 860,67 - 948,80 864,35 1025,21 978,23 > 600 1512,62 1461,79 1423,08 1460,66 1639,52 1672,46 1485,57 1579,07 1682,53 1563,67 1487,94 1657,63 1655,71 1621,07 1495,08 1533,28 - 1621,41 1536,96 1697,82 1650,84 Sardegna 160 410,58 452,31 508,68 418,35 417,07 507,25 384,77 452,27 407,64 479,33 413,98 501,59 475,39 416,05 507,55 - 413,94 417,53 439,11 433,48 476,69 161-200 412,01 453,73 510,10 419,77 418,49 508,68 386,20 453,70 409,06 480,75 415,40 503,02 476,81 417,47 508,97 - 415,37 418,96 440,53 434,91 478,11 201-249 469,04 510,76 567,14 476,80 475,52 565,71 443,23 510,73 466,09 537,78 472,43 560,05 533,84 474,50 566,00 - 472,40 475,99 497,56 491,94 535,15 250-300 538,90 580,63 637,00 546,67 545,39 635,57 513,09 580,59 535,96 607,65 542,30 629,91 603,71 544,37 635,87 - 542,26 545,85 567,43 561,80 605,01 301-600 611,61 653,34 709,71 619,38 618,10 708,29 585,80 653,31 608,67 680,36 615,01 702,63 676,42 617,08 708,58 - 614,98 618,56 640,14 634,51 677,72 > 600 1039,35 1081,07 1137,45 1047,11 1045,83 1136,02 1013,54 1081,04 1036,40 1108,09 1042,74 1130,36 1104,15 1044,81 1136,31 - 1042,71 1046,30 1067,87 1062,25 1105,46 Grp. 35. Allowances for traineeships under transnational mobility (in EUR) Country Months SA MA GA 1 2 3 4 5 6 Austria 1617 2312 3094 4082 4732 5382 162,5 650,2 22,733 Belgium 1501 2183 2841 3719 4305 4890 151,0 585,3 21,575 Bulgaria 990 1413 1831 2583 2980 3377 99,2 396,7 13,97 Cyprus 1342 1854 2499 3316 3957 4495 134,5 538,2 18,94 Czechia 1365 1876 2522 3369 4018 4564 136,5 546,17 19,51 Germany 1477 1477 2751 3749 4344 4939 148,7 594,67 21,24 Denmark 1973 2840 3707 5080,5 5889 6698 202,1 808,5 28,88 Estonia 1504 2226 2949 3765 4366 4968 150,3 601,33 21,48 Spain 1552 2199 2860 3894 4514 5133 154,8 619,17 22,11 Finland 1806 2587 3351 4537 5260 5982 180,6 722,5 25,80 France 1771 2533 3295 4451 5162 5873 177,8 711 25,39 United Kingdom 1972 2820 3668 4950 5737 6525 196,9 787,67 28,13 Hungary 1255 1790 2324 3223 3727 4231 126,1 504,33 18,01 Greece 1402 2000 2598 3674 4251 4828 144,2 576,83 20,60 Ireland 1788 2559 3330 4493 5210 5927 179,3 717,3 25,62 Iceland 1614 2312 3011 4062 4710 5358 162 648 23,14 Liechenstein 1978 2817 3656 4968 5758 6547 197,4 789,5 28,20 Lithuania 1145 1639 2133 2912 3420 3882 115,6 462,3 16,51 Luxembourg 1501 2148 2794 3802 4406 5010 151 604 21,57 Latvia 1204 1721 2238 3104 3589 4074 121,2 484,8 17,32 Malta 1315 1883 2452 3362 3891 4420 132,3 529 18,89 Netherlands 1597 2350 3058 4144 4805 5466 165,3 661,2 23,61 Norway 2129 3035 3942 5341 6189 7036 211,9 847,7 30,27 Poland 1232 1758 2284 3174 3669 4165 123,9 495,5 17,70 Portugal 1371 1959 2548 3492 4041 4591 137,4 549,5 19,63 Romania 1056 1507 1958 2745 3170 3596 106,3 425,3 15,19 Sweden 1771 2533 3288 4452 5161 5871 177,3 709,3 25,33 Slovenia 1363 1945 2526 3465 4011 4556 136,3 545,3 19,48 Slovakia 1293 1850 2408 3308 3827 4346 129,8 519,2 18,54 Turkey 1194 1706 2218 3071 3552 4033 120,3 481 17,18 Switzerland 1879 2579 3279 4670 5370 6070 175,0 700,0 25,00 Croatia 1157 1589 2021 2953 3385 3817 108 432 15,43 Grp. 36. Allowances for interview(s) Place or country of destination Distance (KM) Amount (EUR) Travel and accommodation Daily subsistence allowance (DSA) Any EU-28 or Iceland and Norway 0-50 0 50/day (> 12 hours) 25/½ day (> 6 - 12 hours) Max 3 days > 50-250 100 > 250-500 250 > 500 350 Grp. 37. Allowance to move to another Member State (work placement) Country of Destination Amount (EUR) Austria 1025 Belgium 970 Bulgaria 635 Croatia 675 Cyprus 835 Czechia 750 Denmark 1270 Estonia 750 Finland 1090 France 1045 Germany 940 Greece 910 Hungary 655 Iceland 945 Ireland 1015 Italy 995 Latvia 675 Lithuania 675 Luxembourg 970 Malta 825 Netherlands 950 Norway 1270 Poland 655 Portugal 825 Romania 635 Slovakia 740 Slovenia 825 Spain 890 Sweden 1090 United Kingdom 1060 Grp. 38. Daily accommodation costs (in EUR) Student daily allowances Staff daily allowances Country Group Country (Day 1-day 14) (Day 15-Day 60) (Day 1-day 14) (Day 15-Day 60) Group A United Kingdom 90 63 128 90 Group B Denmark 86 60 128 90 Group C Netherlands 83 58 128 90 Sweden 83 58 128 90 Group D Cyprus 77 54 112 78 Finland 77 54 112 78 Luxembourg 77 54 112 78 Group E Austria 74 52 112 78 Belgium 74 52 112 78 Bulgaria 74 52 112 78 Czechia 74 52 112 78 Group F Greece 70 49 112 78 Hungary 70 49 112 78 Switzerland 70 49 112 78 Liechtenstein 70 49 112 78 Norway 70 49 112 78 Poland 70 49 112 78 Romania 70 49 112 78 Turkey 70 49 112 78 Group G Germany 67 47 96 67 Spain 67 47 96 67 Latvia 67 47 96 67 North Macedonia 67 47 96 67 Malta 67 47 96 67 Slovakia 67 47 96 67 Group H Croatia 58 41 80 56 Estonia 58 41 80 56 Lithuania 58 41 80 56 Slovenia 58 41 80 56 Group I France 80 56 112 78 Ireland 80 56 128 90 Iceland 80 56 112 78 Group L Portugal 64 45 96 67 Grp. 2. Adjustment of amounts UCnew = UCold + Variation where Variation = UCold – (UCold * Outputnew/Outputold)
ANNEX VI Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Italy
1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Hourly rate for 1st guidance level support All eligible costs, including direct staff costs. Number of hours providing 1st guidance level support. 34,00 Hourly rate for specialist or 2nd guidance level support. All eligible costs, including direct staff costs. Number of hours providing specialist or 2nd guidance level support. 35,50 Hourly rate for the following tranings: This hourly rate depends on the type of class (A, B or C) Hourly rate per student participating in the training All eligible costs, including direct staff costs and excluding any allowance paid to participants. Number of hours per training course differentiated by type of class, and the number of hours per student. TYPE OF CLASS HOURLY RATE PER COURSE HOURLY RATE PER STUDENT C 73,13 0,80 B 117,00 A 146,25 New employment contracts as a result of job coaching All eligible costs, including direct staff costs Number of new employment contracts, differentiated by type of contract and profile classification (from low to very high) Profile Classification LOW MEDIUM HIGH VERY HIGH Open-ended contract and 1st and 3rd level apprenticeship contract 1500 2000 2500 3000 2nd level apprenticeship, fixed-term and temporary contract ≥ 12 months 1000 1300 1600 2000 fixed-term and temporary contract 6-12 months 600 800 1000 1200 New regional/interregional/ transnational traineeships All eligible costs including direct staff costs for providing a traineeship. Number of traineeships, differentiated by profile classification. LOW MEDIUM HIGH VERY HIGH REGIONAL/INTERREGIONAL/ TRANSNATIONAL 200 300 400 500 Traineeships under interregional mobility Traineeships under transnational mobility For interregional mobility: all eligible costs, including travel, accommodation and meals, but excluding participant allowances For transnational mobility: all eligible costs. Number of traineeships, differentiated by location and, for interregional mobility, the length of traineeship. Interregional mobility as per the rates set out in point 3.4 Transnational mobility as per the rates set in point 3.5 30 hour block of general preparatory training for access to the voluntary civilian service. All eligible costs, including direct staff costs, excluding allowances and insurance. Number of participants completing the 30 hour block of training. 90 Hourly rate of support for self-employment and self-entrepreneurship All eligible costs, including direct staff costs, but excluding any allowance. Number of hours of support provided to participants. 40 All eligible costs (one off subsidy for travel, accommodation and meals, and an interview allowance), not including any additional allowances for disadvantaged people and any allowances for travel, accommodation or meals under interregional mobility provided by employer. Number of employment contracts or job interviews, differentiated by location Months spent working on PhD. All eligible costs for the participant (salary and associated social security contributions) and the institution providing the PhD (direct and indirect costs). Number of months spent working on PhD, according to location in Italy or abroad. Without a period spent abroad: 1927,63 per month With a period spent abroad: 2891,45 per month Participants gaining a certificate in adult training All categories of costs Number of participants gaining a certificate in adult training, differentiated by length of module and additional specific support 327 (30 hour module) 357 (30 hour module with additional specific support) 654 (60 hour module) 684 (60 hour module with additional specific support) 1090 (100 hour module) 1120 (100 hour module with additional specific support) Participants gaining a certificate in initiatives related to Citizenship and Rule of Law. All categories of costs Number of participants gaining a certificate related to Citizenship and Rule of Law, differentiated by length of module, additional specific support, and meal allowance. 191,10 (30 hour module) 221,10 (30 hours with additional specific support) 261,10 (30 hours with meal allowance) 291,10 (30 hours with additional specific support and meal allowance) 382,20 (60 hour module) 412,20 (60 hours with additional specific support) 522,20 (60 hours with meal allowance) 552,20 (60 hours with additional specific support and meal allowance) 637,00 (100 hour module) 667,00 (100 hours with additional specific support) 871,00 (100 hours with meal allowance) 901,00(100 hours with additional specific support and meal allowance) Participants gaining a certificate in classroom training All categories of costs Number of participants gaining a certificate in classroom training, differentiated by length of module, additional specific support and meal allowance. 360,60 (30 hour module) 390,60 (30 hours with additional specific support) 430,60 (30 hours with meal allowance) 460,60 (30 hours with additional specific support and meal allowance) 721,20 (60 hour module) 751,20 (60 hours with additional specific support) 861,20 (60 hours with meal allowance) 891,20 (60 hours with additional specific support and meal allowance) 1202,00 (100 hour module) 1232,00 (100 hours with additional specific support) 1436,00 (100 hours with meal allowance) 1466,00 (100 hours with additional specific support and meal allowance) Participants gaining a certificate in language training following transnational mobility. All categories of costs, except travel and accommodation costs for persons accompanying participants. Number of participants gaining a certificate in language training following transnational mobility, differentiated by length of module, country and length of stay, and distance travelled 774,00 (40 hour module) 1161,00 (60 hour module) 1548,00 (80 hour module) To these amounts for each participant can be added a daily amount to cover accommodation costs, differentiated by country, as set out in point 3.8 below, and the following amount for travel costs: Km Amount 100-499 500-1999 2000-2999 3000-3999 4000-7999 8000-19999 180 275 360 530 820 1100 Participants gaining an internship certificate, with or without transnational mobility. All categories of costs, except travel and accommodation for persons accompanying participants. Number of participants gaining an internship certificate, with or without transnational mobility, differentiated by length of module and, where transnational mobility is included, country, length of stay, and distance travelled 786,60 (60 hour module) 1179,90 (90 hour module) 1573,20 (120 hour module) 3146,40 (240 hour module) For internships with transnational mobility, these amounts for each participant can be supplemented by a daily amount to cover accommodation costs, differentiated by country, as set out in point 3.8 below, and the following amount for travel costs: Km Amount 100-499 500-1999 2000-2999 3000-3999 4000-7999 8000-19999 180 275 360 530 820 1100 Persons accompanying participants. Accommodation and travel costs Number of persons accompanying participants. Accommodation costs per participant, differentiated by country, as set out in point 3.8 below, and the following amount for travel costs: Km Amount 100-499 500-1999 2000-2999 3000-3999 4000-7999 8000-19999 180 275 360 530 820 1100 Participation in a training course in a Higher Technical Institute Completion of a training course in a Higher Technical Institute The unit costs cover all eligible categories of costs, except for costs related to courses run by certified centres that are compulsory for obtaining the mandatory certifications provided by the provisions of the Ministry of infrastructure and transportation, in the areas Mobility of people and goods — conduction of the naval vehicle and Mobility of people and goods — management of equipment and onboard assembly Number of hours of participation in a training course in a Higher Technical Institute In addition, number of participants who have successfully completed an academic year of a training course in a Higher Technical Institute. Hourly rate 49,93 For 2-year courses per completed year: 4809,50 For 3-year courses per completed year: 3206,30 Monthly cost for a researcher with a fixed-term contract All categories of costs. Number of months spent on site or off campus by a researcher hired under the law n.240/2010 for a period of 36 months, and selected through a public competition in a state or private university in one of the regions that are beneficiaries of the intervention. A. Without periods of activity off campus or abroad for researchers for line of activity mobility EUR 4885,38 B. With periods of activity off campus or abroad for researchers for line of activity mobility and for researchers under line of activity attraction EUR 5496,05 Hourly rate for the following tranings: This hourly rate depends on the type of class (A, B or C) Hourly rate per student participating in the training all eligible costs (personnel costs, other direct and indirect costs), except for any allowance Cost per hour of training per student plus cost for one hour of training course differentiated by class TYPE OF CLASS HOURLY RATE PER COURSE HOURLY RATE PER STUDENT C 73,13 0,80 B 117,00 A 146,25 Hourly rate for the following individual and individualised trainings: all eligible costs (personnel costs, other direct and indirect costs), except for any allowance Number of training hours and number of participants 40,00 General training courses carried out at the beginning of all eligible costs (personnel costs, other direct and indirect costs), except for any allowance Number of participants in a general training course with a minimum duration of 30 hours 180,00 all eligible costs (personnel costs, other direct costs, indirect costs, allowances and insurance costs), excluding travel costs Number of days of effective stay abroad. 15,00 — daily allowance to participant for each day of effective stay abroad 30,00 — accomodation and meal contribution to participant for each day of effective stay abroad (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Friuli VG 2014IT05SFOP004 (8) POR Lazio 2014IT05SFOP005 (9) POR Liguria 2014IT05SFOP006 (10) POR Molise 2014IT16M2OP001 (11) POR Piemonte 2014IT05SFOP013 (12) POR Puglia 2014IT16M2OP002 (13) POR Sardegna 2014IT05SFOP021 (14) POR Sicilia 2014IT05SFOP014 (15) PO Trento 2014IT05SFOP018 (16) POR Umbria 2014IT05SFOP010 (17) POR Valle D’Aosta 2014IT05SFOP011 (18) PON SPAO 2014IT05SFOP002 (19) POR Toscana FSE 2014IT05SFOP015 (20) PON Inclusione 2014IT05SFOP001 (21) POR Lombardia FSE 2014IT05SFOP007 Pt_1_. 2. Measure 1.B of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Friuli VG 2014IT05SFOP004 (8) POR Lazio 2014IT05SFOP005 (9) POR Liguria 2014IT05SFOP006 (10) POR Molise 2014IT16M2OP001 (11) POR Piemonte 2014IT05SFOP013 (12) POR Puglia 2014IT16M2OP002 (13) POR Sardegna 2014IT05SFOP021 (14) POR Sicilia 2014IT05SFOP014 (15) PO Trento 2014IT05SFOP018 (16) POR Umbria 2014IT05SFOP010 (17) POR Valle D’Aosta 2014IT05SFOP011 (18) PON SPAO 2014IT05SFOP002 (19) POR Toscana FSE 2014IT05SFOP015 (20) PON Inclusione 2014IT05SFOP001 (21) POR Lombardia FSE 2014IT05SFOP007 Pt_2_. 2. Measure 1.C of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Lazio 2014IT05SFOP005 (7) POR Liguria 2014IT05SFOP006 (8) POR Molise 2014IT16M2OP001 (9) POR Puglia 2014IT16M2OP002 (10) POR Sardegna 2014IT05SFOP021 (11) POR Sicilia 2014IT05SFOP014 (12) POR Valle D’Aosta 2014IT05SFOP011 (13) PON SPAO 2014IT05SFOP002 (14) POR Toscana FSE 2014IT05SFOP015 (15) PON Inclusione 2014IT05SFOP001 (16) POR Lombardia FSE 2014IT05SFOP007 Pt_3_. 2. Measures 2.A, 2.B, 4.A, 4.C and 7.1 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (13) Training focused on integration in the labour market; (14) Reintegration in the schooling and training system for young people aged between 15 and 18; (15) Apprenticeship for qualification and professional diploma; (16) Apprenticeship for higher training and research; (17) Training for self-employment and self-entrepreneurship (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Friuli VG 2014IT05SFOP004 (8) POR Lazio 2014IT05SFOP005 (9) POR Liguria 2014IT05SFOP006 (10) POR Molise 2014IT16M2OP001 (11) POR Piemonte 2014IT05SFOP013 (12) POR Puglia 2014IT16M2OP002 (13) POR Sardegna 2014IT05SFOP021 (14) POR Sicilia 2014IT05SFOP014 (15) PO Trento 2014IT05SFOP018 (16) POR Umbria 2014IT05SFOP010 (17) POR Valle D’Aosta 2014IT05SFOP011 (18) PON SPAO 2014IT05SFOP002 (19) POR Toscana FSE 2014IT05SFOP015 (20) PON Inclusione 2014IT05SFOP001 (21) POR Lombardia 2014IT05SFOP007 Pt_4_. 2. Measure 3 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001)and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Friuli VG 2014IT05SFOP004 (8) POR Lazio 2014IT05SFOP005 (9) POR Liguria 2014IT05SFOP006 (10) POR Molise 2014IT16M2OP001 (11) POR Piemonte 2014IT05SFOP013 (12) POR Puglia 2014IT16M2OP002 (13) POR Sardegna 2014IT05SFOP021 (14) POR Sicilia 2014IT05SFOP014 (15) PO Trento 2014IT05SFOP018 (16) POR Umbria 2014IT05SFOP010 (17) POR Valle D’Aosta 2014IT05SFOP011 (18) PON SPAO 2014IT05SFOP002 (19) POR Lombardia 2014IT05SFOP007 (20) PON Inclusione 2014IT05SFOP001 Pt_5_. 2. Measure 5 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Friuli VG 2014IT05SFOP004 (8) POR Liguria 2014IT05SFOP006 (9) POR Molise 2014IT16M2OP001 (10) POR Piemonte 2014IT05SFOP013 (11) POR Puglia 2014IT16M2OP002 (12) POR Sardegna 2014IT05SFOP021 (13) POR Sicilia 2014IT05SFOP014 (14) PO Trento 2014IT05SFOP018 (15) POR Umbria 2014IT05SFOP010 (16) POR Valle D’Aosta 2014IT05SFOP011 (17) PON SPAO 2014IT05SFOP002 (18) POR Lombardia 2014IT05SFOP007 (19) PON Inclusione 2014IT05SFOP001 Pt_6_. 2. Measure 5 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Molise 2014IT16M2OP001 (8) POR Piemonte 2014IT05SFOP013 (9) POR Umbria 2014IT05SFOP010 (10) POR Valle D’Aosta 2014IT05SFOP011 (11) PON SPAO 2014IT05SFOP002 (12) POR Lombardia 2014IT05SFOP007 (13) PON Inclusione 2014IT05SFOP001 Pt_7_. 2. Measure 6 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) —POR Friuli VG 2014IT05SFOP004 (8) POR Lazio 2014IT05SFOP005 (9) POR Molise 2014IT16M2OP001 (10) POR Sardegna 2014IT05SFOP021 (11) POR Sicilia 2014IT05SFOP014 (12) PO Trento 2014IT05SFOP018 (13) POR Umbria 2014IT05SFOP010 (14) POR Valle D’Aosta 2014IT05SFOP011 (15) PON SPAO 2014IT05SFOP002 (16) POR Toscana FSE 2014IT05SFOP015 (17) —POR Lombardia 2014IT05SFOP007 (18) PON Inclusione 2014IT05SFOP001 Pt_8_. 2. Measure 7.1 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Liguria 2014IT05SFOP006 (7) POR Molise 2014IT16M2OP001 (8) POR Puglia 2014IT16M2OP002 (9) POR Sardegna 2014IT05SFOP021 (10) POR Sicilia 2014IT05SFOP014 (11) PO Trento 2014IT05SFOP018 (12) POR Umbria 2014IT05SFOP010 (13) POR Valle D’Aosta 2014IT05SFOP011 (14) PON SPAO 2014IT05SFOP002 (15) POR Toscana FSE 2014IT05SFOP015 (16) POR Lombardia 2014IT05SFOP007 (17) PON Inclusione 2014IT05SFOP001 Pt_9_. 2. Measure 8 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (a) Employment contracts following professional interregional mobility or professional transnational mobility; (b) Job interview under professional transnational mobility (26) Professional interregional mobility as per the amounts for more than 600 hours set out in point 3.4. (27) Professional transnational mobility for interview purposes as per the amounts set out in point 3.6. (28) Professional transnational mobility as per the amounts set out in point 3.7. (1) PON Ricerca 2014 IT16M20P005 (2) POR Basilicata FSE 2014IT05SFOP016 (3) POR Campania FSE 2014IT05SFOP020 (4) POR Puglia FESR FSE 2014IT16M2OP002 (5) POR Calabria FESR FSE 2014IT16M2OP006 (6) POR Abruzzo FSE 2014IT05SFOP009 (7) POR Sardegna FSE 2014IT05SFOP021 (8) POR Molise FESR FSE 2014IT16M2OP001 (9) POR Friuli Venezia Giulia FSE 2014IT05SFOP004 (10) POR Liguria FSE 2014IT05SFOP006 (11) POR Lombardia FSE 2014IT05SFOP007 (12) POR Valle D’Aosta FSE 2014IT05SFOP011 (13) POR Toscana FSE 2014IT05SFOP015 (14) PA Bolzano FSE 2014IT05SFOP017 (15) POR Sicilia FSE 2014IT05SFOP014 (16) POR Umbria FSE 2014IT05SFOP010 (17) POR Emilia Romagna FSE 2014IT05SFOP003 (18) PA Trento 2014IT05SFOP018 (10) Operations increasing the number of Industrial PhD positions under the following Operational Programmes: (11) Adult training under OP Education 2014IT05M20P001 (12) Activities related to Citizenship and the Rule of Law under OP Education 2014IT05M20P001 Pt_13_. 2. Classroom training under OP Education 2014IT05M20P001 Pt_14_. 2. Language training in context of transnational mobility under OP Education 2014IT05M20P001 Pt_15_. 2. Internships under OP Education 2014IT05M20P001 Pt_16_. 2. Language training and internships in the context of transnational mobility under OP Education 2014IT05M20P001 (1) 2014IT05SFOP016 (POR FSE Basilicata) (2) 2014IT16M2OP006 (POR FSE/FESR Calabria) (3) 2014IT05SFOP020 (POR FSE Campania) (4) 2014IT16M2OP002 (POR FSE/FESR Puglia) (5) 2014IT05SFOP014 (POR FSE Sicilia) (6) 2014IT05SFOP009 (POR FSE Abruzzo) (7) 2014IT16M2OP001 (POR FSE Molise) (8) 2014IT05SFOP021 (POR FSE Sardegna) (9) 2014IT05SFOP017 (POR FSE Bolzano) (10) 2014IT05SFOP003 (POR FSE Emilia-Romagna) (11) 2014IT05SFOP004 (POR FSE Friuli-Venezia Giulia) (12) 2014IT05SFOP005 (POR FSE Lazio) (13) 2014IT05SFOP006 (POR FSE Liguria) (14) 2014IT05SFOP007 (POR FSE Lombardia) (15) 2014IT05SFOP008 (POR FSE Marche) (16) 2014IT05SFOP013 (POR FSE Piemonte) (17) 2014IT05SFOP015 (POR FSE Toscana) (18) 2014IT05SFOP010 (POR FSE Umbria) (19) 2014IT05SFOP011 (POR FSE Valle d”Aosta) (20) 2014IT05SFOP012 (POR FSE Veneto) Pt_17_. 2. Training in Higher Technical Institutes under the following OPs: (1) 2014IT05SFOP011 (POR FSE Valle d’Aosta) (2) 2014IT05SFOP020 (POR FSE Campania) (3) 2014IT05SFOP004 (POR FSE Friuli-Venezia Giulia) (18) Mobility programmes for researchers under the OP 2014IT16M20P005 - 2014-2020 Research and Innovation Operating Programme, Axis I Human Capital, Action I.2. Mobility programmes for researchers and similar operations under: (19) Group training under measures 2.C, 5.bis, 6.bis, 8 of NOP YEI 2014IT05M9OP001 and for similar operations (including different target groups) carried out under NOP SAEP 2014IT05SFOP002 (39) Employment and training; (40) Linguistic training for voluntary civilian service in the EU; (41) Linguistic training for Professional transnational mobility; (42) Linguistic training for Traineeships in transnational mobility (20) Individual and individualised training as foreseen under measures 2.A, 2.B, 2.C, 4.A, 4.C of NOP YEI 2014IT05M9OP001 and for similar operations (including different target groups) carried out under NOP SAEP 2014IT05SFOP002. (44) Training focused on integration in the labour market; (45) Reintegration in the schooling and training system for young people between 15 and 18 years old; (46) Employment and training; (47) Apprenticeship for qualification and professional diploma; (48) Apprenticeship for higher training and research. (21) General training activities under measures 5.bis, 6.bis and 8 of NOP YEI 2014IT05M9OP001 and for similar operations (including different target groups) carried out under NOP SAEP 2014IT05SFOP002. (50) extra-curricular internships in transnational mobility; (51) voluntary civilian service in the EU; (52) transnational professional mobility projects. (22) Voluntary civilian service as foreseen under measure 6.bis of NOP YEI 2014IT05M9OP001 and for similar operations (including different target groups) carried out under NOP SAEP 2014IT05SFOP002 (54) Daily allowance for each day of effective stay abroad (55) Accomodation and meal contribution for each day of effective stay abroad
1.
1. Measure 1.B of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Friuli VG 2014IT05SFOP004 (8) POR Lazio 2014IT05SFOP005 (9) POR Liguria 2014IT05SFOP006 (10) POR Molise 2014IT16M2OP001 (11) POR Piemonte 2014IT05SFOP013 (12) POR Puglia 2014IT16M2OP002 (13) POR Sardegna 2014IT05SFOP021 (14) POR Sicilia 2014IT05SFOP014 (15) PO Trento 2014IT05SFOP018 (16) POR Umbria 2014IT05SFOP010 (17) POR Valle D’Aosta 2014IT05SFOP011 (18) PON SPAO 2014IT05SFOP002 (19) POR Toscana FSE 2014IT05SFOP015 (20) PON Inclusione 2014IT05SFOP001 (21) POR Lombardia FSE 2014IT05SFOP007
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Lazio 2014IT05SFOP005
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D’Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
PON Inclusione 2014IT05SFOP001
POR Lombardia FSE 2014IT05SFOP007
2. Measure 1.C of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Friuli VG 2014IT05SFOP004 (8) POR Lazio 2014IT05SFOP005 (9) POR Liguria 2014IT05SFOP006 (10) POR Molise 2014IT16M2OP001 (11) POR Piemonte 2014IT05SFOP013 (12) POR Puglia 2014IT16M2OP002 (13) POR Sardegna 2014IT05SFOP021 (14) POR Sicilia 2014IT05SFOP014 (15) PO Trento 2014IT05SFOP018 (16) POR Umbria 2014IT05SFOP010 (17) POR Valle D’Aosta 2014IT05SFOP011 (18) PON SPAO 2014IT05SFOP002 (19) POR Toscana FSE 2014IT05SFOP015 (20) PON Inclusione 2014IT05SFOP001 (21) POR Lombardia FSE 2014IT05SFOP007
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Lazio 2014IT05SFOP005
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D’Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
PON Inclusione 2014IT05SFOP001
POR Lombardia FSE 2014IT05SFOP007
3. Measures 2.A, 2.B, 4.A, 4.C and 7.1 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Lazio 2014IT05SFOP005 (7) POR Liguria 2014IT05SFOP006 (8) POR Molise 2014IT16M2OP001 (9) POR Puglia 2014IT16M2OP002 (10) POR Sardegna 2014IT05SFOP021 (11) POR Sicilia 2014IT05SFOP014 (12) POR Valle D’Aosta 2014IT05SFOP011 (13) PON SPAO 2014IT05SFOP002 (14) POR Toscana FSE 2014IT05SFOP015 (15) PON Inclusione 2014IT05SFOP001 (16) POR Lombardia FSE 2014IT05SFOP007
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Lazio 2014IT05SFOP005
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
POR Valle D’Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
PON Inclusione 2014IT05SFOP001
POR Lombardia FSE 2014IT05SFOP007
Training focused on integration in the labour market;
Reintegration in the schooling and training system for young people aged between 15 and 18;
Apprenticeship for qualification and professional diploma;
Apprenticeship for higher training and research;
Training for self-employment and self-entrepreneurship
4. Measure 3 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001)and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Friuli VG 2014IT05SFOP004 (8) POR Lazio 2014IT05SFOP005 (9) POR Liguria 2014IT05SFOP006 (10) POR Molise 2014IT16M2OP001 (11) POR Piemonte 2014IT05SFOP013 (12) POR Puglia 2014IT16M2OP002 (13) POR Sardegna 2014IT05SFOP021 (14) POR Sicilia 2014IT05SFOP014 (15) PO Trento 2014IT05SFOP018 (16) POR Umbria 2014IT05SFOP010 (17) POR Valle D’Aosta 2014IT05SFOP011 (18) PON SPAO 2014IT05SFOP002 (19) POR Toscana FSE 2014IT05SFOP015 (20) PON Inclusione 2014IT05SFOP001 (21) POR Lombardia 2014IT05SFOP007
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Lazio 2014IT05SFOP005
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D’Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
PON Inclusione 2014IT05SFOP001
POR Lombardia 2014IT05SFOP007
5. Measure 5 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Friuli VG 2014IT05SFOP004 (8) POR Lazio 2014IT05SFOP005 (9) POR Liguria 2014IT05SFOP006 (10) POR Molise 2014IT16M2OP001 (11) POR Piemonte 2014IT05SFOP013 (12) POR Puglia 2014IT16M2OP002 (13) POR Sardegna 2014IT05SFOP021 (14) POR Sicilia 2014IT05SFOP014 (15) PO Trento 2014IT05SFOP018 (16) POR Umbria 2014IT05SFOP010 (17) POR Valle D’Aosta 2014IT05SFOP011 (18) PON SPAO 2014IT05SFOP002 (19) POR Lombardia 2014IT05SFOP007 (20) PON Inclusione 2014IT05SFOP001
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Lazio 2014IT05SFOP005
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D’Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Lombardia 2014IT05SFOP007
PON Inclusione 2014IT05SFOP001
6. Measure 5 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Friuli VG 2014IT05SFOP004 (8) POR Liguria 2014IT05SFOP006 (9) POR Molise 2014IT16M2OP001 (10) POR Piemonte 2014IT05SFOP013 (11) POR Puglia 2014IT16M2OP002 (12) POR Sardegna 2014IT05SFOP021 (13) POR Sicilia 2014IT05SFOP014 (14) PO Trento 2014IT05SFOP018 (15) POR Umbria 2014IT05SFOP010 (16) POR Valle D’Aosta 2014IT05SFOP011 (17) PON SPAO 2014IT05SFOP002 (18) POR Lombardia 2014IT05SFOP007 (19) PON Inclusione 2014IT05SFOP001
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D’Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Lombardia 2014IT05SFOP007
PON Inclusione 2014IT05SFOP001
7. Measure 6 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) POR Molise 2014IT16M2OP001 (8) POR Piemonte 2014IT05SFOP013 (9) POR Umbria 2014IT05SFOP010 (10) POR Valle D’Aosta 2014IT05SFOP011 (11) PON SPAO 2014IT05SFOP002 (12) POR Lombardia 2014IT05SFOP007 (13) PON Inclusione 2014IT05SFOP001
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Umbria 2014IT05SFOP010
POR Valle D’Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Lombardia 2014IT05SFOP007
PON Inclusione 2014IT05SFOP001
8. Measure 7.1 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Emilia Romagna 2014IT05SFOP003 (7) —POR Friuli VG 2014IT05SFOP004 (8) POR Lazio 2014IT05SFOP005 (9) POR Molise 2014IT16M2OP001 (10) POR Sardegna 2014IT05SFOP021 (11) POR Sicilia 2014IT05SFOP014 (12) PO Trento 2014IT05SFOP018 (13) POR Umbria 2014IT05SFOP010 (14) POR Valle D’Aosta 2014IT05SFOP011 (15) PON SPAO 2014IT05SFOP002 (16) POR Toscana FSE 2014IT05SFOP015 (17) —POR Lombardia 2014IT05SFOP007 (18) PON Inclusione 2014IT05SFOP001
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
—POR Friuli VG 2014IT05SFOP004
POR Lazio 2014IT05SFOP005
POR Molise 2014IT16M2OP001
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D’Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
—POR Lombardia 2014IT05SFOP007
PON Inclusione 2014IT05SFOP001
9. Measure 8 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under: (1) POR Abruzzo 2014IT05SFOP009 (2) POR Basilicata 2014IT05SFOP016 (3) PO Bolzano 2014IT05SFOP017 (4) POR Calabria 2014IT16M2OP006 (5) POR Campania 2014IT05SFOP020 (6) POR Liguria 2014IT05SFOP006 (7) POR Molise 2014IT16M2OP001 (8) POR Puglia 2014IT16M2OP002 (9) POR Sardegna 2014IT05SFOP021 (10) POR Sicilia 2014IT05SFOP014 (11) PO Trento 2014IT05SFOP018 (12) POR Umbria 2014IT05SFOP010 (13) POR Valle D’Aosta 2014IT05SFOP011 (14) PON SPAO 2014IT05SFOP002 (15) POR Toscana FSE 2014IT05SFOP015 (16) POR Lombardia 2014IT05SFOP007 (17) PON Inclusione 2014IT05SFOP001
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D’Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
POR Lombardia 2014IT05SFOP007
PON Inclusione 2014IT05SFOP001
A.
Employment contracts following professional interregional mobility or professional transnational mobility;
B.
Job interview under professional transnational mobility
Professional interregional mobility as per the amounts for more than 600 hours set out in point 3.4.
Professional transnational mobility for interview purposes as per the amounts set out in point 3.6.
Professional transnational mobility as per the amounts set out in point 3.7.
10. Operations increasing the number of Industrial PhD positions under the following Operational Programmes: (1) PON Ricerca 2014 IT16M20P005 (2) POR Basilicata FSE 2014IT05SFOP016 (3) POR Campania FSE 2014IT05SFOP020 (4) POR Puglia FESR FSE 2014IT16M2OP002 (5) POR Calabria FESR FSE 2014IT16M2OP006 (6) POR Abruzzo FSE 2014IT05SFOP009 (7) POR Sardegna FSE 2014IT05SFOP021 (8) POR Molise FESR FSE 2014IT16M2OP001 (9) POR Friuli Venezia Giulia FSE 2014IT05SFOP004 (10) POR Liguria FSE 2014IT05SFOP006 (11) POR Lombardia FSE 2014IT05SFOP007 (12) POR Valle D’Aosta FSE 2014IT05SFOP011 (13) POR Toscana FSE 2014IT05SFOP015 (14) PA Bolzano FSE 2014IT05SFOP017 (15) POR Sicilia FSE 2014IT05SFOP014 (16) POR Umbria FSE 2014IT05SFOP010 (17) POR Emilia Romagna FSE 2014IT05SFOP003 (18) PA Trento 2014IT05SFOP018
PON Ricerca 2014 IT16M20P005
POR Basilicata FSE 2014IT05SFOP016
POR Campania FSE 2014IT05SFOP020
POR Puglia FESR FSE 2014IT16M2OP002
POR Calabria FESR FSE 2014IT16M2OP006
POR Abruzzo FSE 2014IT05SFOP009
POR Sardegna FSE 2014IT05SFOP021
POR Molise FESR FSE 2014IT16M2OP001
POR Friuli Venezia Giulia FSE 2014IT05SFOP004
POR Liguria FSE 2014IT05SFOP006
POR Lombardia FSE 2014IT05SFOP007
POR Valle D’Aosta FSE 2014IT05SFOP011
POR Toscana FSE 2014IT05SFOP015
PA Bolzano FSE 2014IT05SFOP017
POR Sicilia FSE 2014IT05SFOP014
POR Umbria FSE 2014IT05SFOP010
POR Emilia Romagna FSE 2014IT05SFOP003
PA Trento 2014IT05SFOP018
11. Adult training under OP Education 2014IT05M20P001
12. Activities related to Citizenship and the Rule of Law under OP Education 2014IT05M20P001
13. Classroom training under OP Education 2014IT05M20P001
14. Language training in context of transnational mobility under OP Education 2014IT05M20P001
15. Internships under OP Education 2014IT05M20P001
16. Language training and internships in the context of transnational mobility under OP Education 2014IT05M20P001
17. Training in Higher Technical Institutes under the following OPs: (1) 2014IT05SFOP016 (POR FSE Basilicata) (2) 2014IT16M2OP006 (POR FSE/FESR Calabria) (3) 2014IT05SFOP020 (POR FSE Campania) (4) 2014IT16M2OP002 (POR FSE/FESR Puglia) (5) 2014IT05SFOP014 (POR FSE Sicilia) (6) 2014IT05SFOP009 (POR FSE Abruzzo) (7) 2014IT16M2OP001 (POR FSE Molise) (8) 2014IT05SFOP021 (POR FSE Sardegna) (9) 2014IT05SFOP017 (POR FSE Bolzano) (10) 2014IT05SFOP003 (POR FSE Emilia-Romagna) (11) 2014IT05SFOP004 (POR FSE Friuli-Venezia Giulia) (12) 2014IT05SFOP005 (POR FSE Lazio) (13) 2014IT05SFOP006 (POR FSE Liguria) (14) 2014IT05SFOP007 (POR FSE Lombardia) (15) 2014IT05SFOP008 (POR FSE Marche) (16) 2014IT05SFOP013 (POR FSE Piemonte) (17) 2014IT05SFOP015 (POR FSE Toscana) (18) 2014IT05SFOP010 (POR FSE Umbria) (19) 2014IT05SFOP011 (POR FSE Valle d”Aosta) (20) 2014IT05SFOP012 (POR FSE Veneto)
2014IT05SFOP016 (POR FSE Basilicata)
2014IT16M2OP006 (POR FSE/FESR Calabria)
2014IT05SFOP020 (POR FSE Campania)
2014IT16M2OP002 (POR FSE/FESR Puglia)
2014IT05SFOP014 (POR FSE Sicilia)
2014IT05SFOP009 (POR FSE Abruzzo)
2014IT16M2OP001 (POR FSE Molise)
2014IT05SFOP021 (POR FSE Sardegna)
2014IT05SFOP017 (POR FSE Bolzano)
2014IT05SFOP003 (POR FSE Emilia-Romagna)
2014IT05SFOP004 (POR FSE Friuli-Venezia Giulia)
2014IT05SFOP005 (POR FSE Lazio)
2014IT05SFOP006 (POR FSE Liguria)
2014IT05SFOP007 (POR FSE Lombardia)
2014IT05SFOP008 (POR FSE Marche)
2014IT05SFOP013 (POR FSE Piemonte)
2014IT05SFOP015 (POR FSE Toscana)
2014IT05SFOP010 (POR FSE Umbria)
2014IT05SFOP011 (POR FSE Valle d”Aosta)
2014IT05SFOP012 (POR FSE Veneto)
18. Mobility programmes for researchers under the OP 2014IT16M20P005 - 2014-2020 Research and Innovation Operating Programme, Axis I Human Capital, Action I.2. Mobility programmes for researchers and similar operations under: (1) 2014IT05SFOP011 (POR FSE Valle d’Aosta) (2) 2014IT05SFOP020 (POR FSE Campania) (3) 2014IT05SFOP004 (POR FSE Friuli-Venezia Giulia)
2014IT05SFOP011 (POR FSE Valle d’Aosta)
2014IT05SFOP020 (POR FSE Campania)
2014IT05SFOP004 (POR FSE Friuli-Venezia Giulia)
19. Group training under measures 2.C, 5.bis, 6.bis, 8 of NOP YEI 2014IT05M9OP001 and for similar operations (including different target groups) carried out under NOP SAEP 2014IT05SFOP002
Employment and training;
Linguistic training for voluntary civilian service in the EU;
Linguistic training for Professional transnational mobility;
Linguistic training for Traineeships in transnational mobility
20. Individual and individualised training as foreseen under measures 2.A, 2.B, 2.C, 4.A, 4.C of NOP YEI 2014IT05M9OP001 and for similar operations (including different target groups) carried out under NOP SAEP 2014IT05SFOP002.
Training focused on integration in the labour market;
Reintegration in the schooling and training system for young people between 15 and 18 years old;
Employment and training;
Apprenticeship for qualification and professional diploma;
Apprenticeship for higher training and research.
21. General training activities under measures 5.bis, 6.bis and 8 of NOP YEI 2014IT05M9OP001 and for similar operations (including different target groups) carried out under NOP SAEP 2014IT05SFOP002.
extra-curricular internships in transnational mobility;
voluntary civilian service in the EU;
transnational professional mobility projects.
22. Voluntary civilian service as foreseen under measure 6.bis of NOP YEI 2014IT05M9OP001 and for similar operations (including different target groups) carried out under NOP SAEP 2014IT05SFOP002
Daily allowance for each day of effective stay abroad
Accomodation and meal contribution for each day of effective stay abroad
2. Adjustment of amounts UCnew = UCold + Variation where Variation = UCold – (UCold * Outputnew/Outputold) (a) For standard scales of unit costs 1-9 and 19-20, the amounts may be adjusted where the FOI index (consumer price index for blue and white collar worker households, excluding tobacco products) shows a monetary revaluation equal to or exceeding 5 %. In particular, in a given year y, the adjustment is made if in a period y+t the difference between the benchmarking coefficients shown by the FOI index for such years is equal to or higher than 5 %. The base year applied — and on the basis of which the amounts were adjusted — is 2014. Where this rate is equal to or higher than 5 %, each unit cost may be adjusted accordingly. (b) For standard scale of unit costs 10, the rate may be adjusted by replacing the montly scholarship and/or social security contributions in the calculation method that consists of monthly scholarship plus social security contributions plus an amount for all other costs. Updated data can be found in amendments to the Ministerial Decree of 18.6.2008 (which defines the total gross annual amount of PhD scholarships) and biannual adjustment of the rate of social security contributions (Circular letter No 13 of 29/01/2016 of the Director-General of INPS, the National Institute for Social Security). (c) For standard scales of unit costs 11-15, which are based on the historical average number of certificates (output) awarded per module, the rate may be adjusted at the end of each financial year (31/12) following an assessment by the Managing Authority of the implementation of the operations related to each of the unit costs. Where such an assessment shows a divergence in the average number of certificates awarded per module for each type of training as compared to the average number used as the basis for calculating the existing unit cost, then a new unit cost will be calculated according to the following formula: (d) For standard scales of unit costs 17, the rates will be reviewed every four years and if, taking 2017 as the reference year, there is an increase of more than 5 % an adjustment will be made by ISTAT based on the FOI consumer price index (consumer price index for blue and white collar worker households, excluding tobacco products). (e) For standard scales of unit costs 18, the rates may be adjusted following amendments of the current legislation (which includes Law n.240/2010, the Presidential Decree n.232/2011, the Law n.232/2016 (Budget Law 2017), Law n.448/1998 Misure di finanza pubblica per la stabilizzazione e lo sviluppo, Law n.335/1995, Legislative Decree n.446/1997, and the Presidential Decree n.1032/1973.) as well as changes of the social security contribution rates. (f) The amounts for unit costs 21 and 22 may be adapted following amendments to the legislative provisions of Legislative Decree 77/2002, Directorial Determination (DD) of 19 December 2007 and D.D. n. 348 of 18 May 2016 of the Presidency of the Council of Ministers — Department of Youth and Civilian Service Grp. 31. Interregional travel costs (in EUR) Region of origin Travel costs Destination region Valle d’Aosta PA Bolzano PA Trento Liguria Piemonte Lombardia Veneto Friuli Venezia Giulia Emilia-Romagna Toscana Marche Abruzzo Umbria Lazio Campania Molise Basilicata Puglia Calabria Sicilia Sardegna Abruzzo 269,30 211,17 198,50 148,63 231,83 232,74 201,95 226,34 167,99 68,60 58,98 0,00 23,32 25,81 125,43 45,79 83,99 93,05 164,82 165,16 182,46 Basilicata 271,11 236,02 227,31 236,81 294,55 239,98 259,23 264,89 201,50 176,59 97,35 83,99 142,75 67,92 33,96 31,24 0,00 55,47 71,43 114,33 224,18 Calabria 369,32 285,04 273,72 242,02 351,32 340,51 304,28 304,39 270,32 238,63 243,15 164,82 178,18 139,01 90,33 85,58 71,43 69,05 0,00 75,62 280,55 Campania 253,00 271,68 259,06 113,20 246,78 221,87 165,84 302,24 178,86 160,74 169,86 125,43 151,01 99,62 0,00 21,28 33,96 89,20 90,33 113,20 190,22 Emilia-Romagna 146,48 81,50 74,71 38,26 129,05 92,82 63,39 55,47 0,00 54,34 62,26 167,99 52,07 131,31 178,86 160,52 201,50 140,37 270,32 292,06 188,94 Friuli Venezia Giulia 129,05 103,24 82,30 120,22 175,52 99,62 37,36 0,00 55,47 70,18 163,01 226,34 162,50 113,20 302,24 218,87 264,89 241,12 304,39 325,00 279,13 Lazio 230,31 172,06 160,74 129,05 210,55 201,50 165,27 113,20 131,31 99,62 70,18 25,81 54,34 0,00 99,62 29,21 67,92 113,20 139,01 138,10 156,65 Liguria 53,66 113,94 105,11 0,00 36,22 49,81 106,41 120,22 38,26 67,47 118,07 148,63 75,50 129,05 113,20 152,03 236,81 250,17 242,02 231,61 224,15 Lombardia 59,37 97,35 76,47 49,81 67,92 0,00 69,05 99,62 92,82 113,20 108,67 232,74 84,90 201,50 221,87 223,91 239,98 179,99 340,51 335,07 179,51 Marche 200,25 84,90 76,98 118,07 119,99 108,67 70,18 163,01 62,26 108,11 0,00 58,98 43,92 70,18 169,86 75,96 97,35 107,54 243,15 216,21 251,20 Molise 259,51 196,06 194,31 152,03 232,97 223,91 194,48 218,87 160,52 126,56 75,96 45,79 106,75 29,21 21,28 0,00 31,24 70,30 85,58 140,48 185,85 PA Bolzano 118,58 0,00 36,22 113,94 151,35 97,35 96,22 103,24 81,50 110,94 84,90 67,92 127,01 172,06 271,68 196,06 236,02 138,10 285,04 310,17 273,47 PA Trento 112,24 36,22 0,00 105,11 147,22 76,47 19,02 82,30 74,71 99,62 76,98 198,50 120,44 160,74 259,06 194,31 227,31 132,44 273,72 308,24 247,26 Piemonte 17,43 151,35 147,22 36,22 0,00 67,92 103,01 175,52 129,05 147,16 119,99 231,83 181,74 210,55 246,78 232,97 294,55 191,31 351,32 273,60 187,92 Puglia 275,59 138,10 132,44 250,17 191,31 179,99 164,71 241,12 140,37 212,82 107,54 93,05 156,78 113,20 89,20 70,30 55,47 0,00 69,05 147,61 279,42 Sardegna 205,36 273,47 247,26 224,15 187,92 179,51 248,56 279,13 188,94 189,41 251,20 182,46 210,98 156,65 190,22 185,85 224,18 279,42 280,55 185,82 0,00 Sicilia 350,35 310,17 308,24 231,61 273,60 335,07 303,38 325,00 292,06 273,94 216,21 165,16 189,50 138,10 113,20 140,48 114,33 147,61 75,62 0,00 185,82 Toscana 169,12 110,94 99,62 67,47 147,16 113,20 95,09 70,18 54,34 0,00 108,11 68,60 36,22 99,62 160,74 126,56 176,59 212,82 238,63 273,94 189,41 Umbria 199,18 127,01 120,44 75,50 181,74 84,90 125,14 162,50 52,07 36,22 43,92 23,32 0,00 54,34 151,01 106,75 142,75 156,78 178,18 189,50 210,98 Valle d’Aosta 0,00 118,58 112,24 53,66 17,43 59,37 155,03 129,05 146,48 169,12 200,25 269,30 199,18 230,31 253,00 259,51 271,11 275,59 369,32 350,35 205,36 Veneto 155,03 96,22 19,02 106,41 103,01 69,05 0,00 37,36 63,39 95,09 70,18 201,95 125,14 165,27 165,84 194,48 259,23 164,71 304,28 303,38 248,56 Grp. 32. Interregional accommodation costs (for more than 600 hours) (in EUR) Region of origin ACCOMMODATION COSTS Destination region Valle d’Aosta PA Bolzano PA Trento Liguria Piemonte Lombardia Veneto Friuli Venezia Giulia Emilia-Romagna Toscana Marche Abruzzo Umbria Lazio Campania Molise Basilicata Puglia Calabria Sicilia Sardegna Abruzzo 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Basilicata 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Calabria 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Campania 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Emilia-Romagna 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Friuli Venezia Giulia 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Lazio 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Liguria 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Lombardia 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Marche 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Molise 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 PA Bolzano 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 PA Trento 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Piemonte 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Puglia 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Sardegna 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Sicilia 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Toscana 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Umbria 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Valle d’Aosta 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Veneto 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Grp. 33. Interregional subsistence costs (for more than 600 hours) (in EUR) Region of origin MEAL COSTS Destination region Valle d’Aosta PA Bolzano PA Trento Liguria Piemonte Lombardia Veneto Friuli Venezia Giulia Emilia-Romagna Toscana Marche Abruzzo Umbria Lazio Campania Molise Basilicata Puglia Calabria Sicilia Sardegna Abruzzo 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Basilicata 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Calabria 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Campania 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Emilia-Romagna 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Friuli Venezia Giulia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Lazio 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Liguria 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Lombardia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Marche 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Molise 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 PA Bolzano 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 PA Trento 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Piemonte 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Puglia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Sardegna 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Sicilia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Toscana 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Umbria 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Valle d’Aosta 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Veneto 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Grp. 34. Interregional allowances for traineeships (in EUR) No. of training hours Abruzzo Basilicata Calabria Campania Emilia Romagna Friuli Venezia Giulia Lazio Liguria Lombardia Marche Molise PA Bolzano PA Trento Piemonte Puglia Sardegna Sicilia Toscana Umbria Valle d’Aosta Veneto Region where the training is taking place Valle d’Aosta 160 611,70 613,51 711,72 595,40 488,88 471,45 572,71 396,06 401,77 542,65 601,91 460,98 454,64 359,83 617,99 547,76 692,75 511,52 541,58 - 497,43 161-200 613,84 615,65 713,86 597,54 491,02 473,59 574,85 398,20 403,91 544,79 604,05 463,12 456,78 361,97 620,13 549,90 694,89 513,66 543,72 - 499,57 201-249 699,44 701,25 799,46 683,14 576,62 559,19 660,45 483,80 489,51 630,39 689,65 548,72 542,38 447,57 705,73 635,50 780,49 599,26 629,32 - 585,17 250-300 804,30 806,11 904,32 788,00 681,48 664,05 765,31 588,66 594,37 735,25 794,51 653,58 647,24 552,43 810,59 740,36 885,35 704,12 734,18 - 690,03 301-600 913,44 915,25 1.013,46 897,14 790,62 773,19 874,45 697,80 703,51 844,39 903,65 762,72 756,38 661,57 919,73 849,50 994,49 813,26 843,32 - 799,17 > 600 1555,44 1557,25 1655,46 1539,14 1432,62 1415,19 1516,45 1339,80 1345,51 1486,39 1545,65 1404,72 1398,38 1303,57 1561,73 1491,50 1636,49 1455,26 1485,32 - 1441,17 Bolzano 160 585,59 610,44 659,45 646,09 455,92 477,65 546,48 488,35 471,77 459,31 570,48 - 410,64 525,76 512,52 647,88 684,58 485,35 501,42 492,99 470,63 161-200 587,93 612,78 661,79 648,43 458,26 479,99 548,82 490,69 474,11 461,65 572,82 - 412,98 528,10 514,86 650,22 686,92 487,69 503,76 495,33 472,97 201-249 681,53 706,38 755,39 742,04 551,86 573,60 642,42 584,29 567,71 555,26 666,42 - 506,58 621,71 608,46 743,83 780,53 581,29 597,37 588,93 566,58 250-300 796,20 821,04 870,06 856,70 666,53 688,26 757,09 698,96 682,37 669,92 781,08 - 621,25 736,37 723,13 858,49 895,19 695,96 712,03 703,60 681,24 301-600 915,54 940,39 989,40 976,05 785,87 807,60 876,43 818,30 801,72 789,27 900,43 - 740,59 855,71 842,47 977,83 1.014,53 815,30 831,38 822,94 800,59 > 600 1617,57 1642,41 1691,43 1678,07 1487,90 1509,63 1578,46 1520,33 1503,74 1491,29 1602,45 - 1442,62 1557,74 1544,50 1679,86 1716,56 1517,33 1533,40 1524,97 1502,61 Trento 160 493,91 522,71 569,13 554,47 370,12 377,71 456,15 400,52 371,88 372,38 489,72 331,63 - 442,63 427,85 542,67 603,65 395,02 415,85 407,65 314,43 161-200 495,75 524,56 570,97 556,31 371,97 379,55 458,00 402,36 373,72 374,23 491,56 333,48 - 444,47 429,70 544,52 605,50 396,87 417,70 409,49 316,27 201-249 569,60 598,41 644,82 630,17 445,82 453,40 531,85 476,21 447,57 448,08 565,42 407,33 - 518,32 503,55 618,37 679,35 470,72 491,55 483,35 390,12 250-300 660,07 688,88 735,29 720,63 536,29 543,87 622,32 566,68 538,04 538,55 655,88 497,80 - 608,79 594,02 708,84 769,82 561,19 582,02 573,81 480,59 301-600 754,23 783,04 829,46 814,80 630,45 638,03 716,48 660,84 632,20 632,71 750,05 591,96 - 702,95 688,18 803,00 863,98 655,35 676,18 667,98 574,76 > 600 1308,13 1336,93 1383,35 1368,69 1184,34 1191,93 1270,37 1214,74 1186,10 1186,61 1303,94 1145,85 - 1256,85 1242,07 1356,89 1417,87 1209,25 1230,07 1221,87 1128,65 Liguria 160 454,43 542,61 547,82 419,00 344,06 426,02 434,85 - 355,61 423,87 457,83 419,74 410,91 342,02 555,97 529,95 537,41 373,27 381,30 359,46 412,21 161-200 456,34 544,52 549,73 420,91 345,97 427,93 436,76 - 357,52 425,78 459,74 421,65 412,82 343,93 557,88 531,86 539,32 375,18 383,21 361,37 414,12 201-249 532,79 620,97 626,18 497,36 422,42 504,38 513,21 - 433,97 502,23 536,19 498,10 489,27 420,38 634,33 608,31 615,77 451,63 459,66 437,82 490,57 250-300 626,44 714,63 719,83 591,01 516,07 598,03 606,86 - 527,62 595,88 629,84 591,75 582,92 514,04 727,98 701,96 709,42 545,28 553,32 531,47 584,22 301-600 723,92 812,10 817,31 688,48 613,55 695,50 704,33 - 625,09 693,35 727,31 689,22 680,39 611,51 825,46 799,43 806,89 642,75 650,79 628,94 681,69 > 600 1297,29 1385,47 1390,68 1261,86 1186,92 1268,88 1277,71 - 1198,47 1266,73 1300,69 1262,59 1253,76 1184,88 1398,83 1372,81 1380,27 1216,13 1224,16 1202,32 1255,07 Piemonte 160 555,86 618,58 675,35 570,81 453,08 499,55 534,58 360,26 391,95 444,02 557,00 475,38 471,25 - 515,34 511,95 597,64 471,19 505,77 341,46 427,04 161-200 557,89 620,60 677,37 572,83 455,10 501,57 536,61 362,28 393,98 446,05 559,02 477,40 473,27 - 517,36 513,98 599,66 473,22 507,80 343,49 429,07 201-249 638,90 701,61 758,38 653,84 536,11 582,58 617,62 443,29 474,98 527,06 640,03 558,41 554,28 - 598,37 594,99 680,67 554,22 588,81 424,50 510,08 250-300 738,13 800,85 857,61 753,07 635,35 681,82 716,85 542,52 574,22 626,29 739,26 657,65 653,52 - 697,61 694,22 779,90 653,46 688,04 523,73 609,31 301-600 841,42 904,13 960,90 856,36 738,63 785,10 820,14 645,81 677,50 729,58 842,55 760,93 756,80 - 800,89 797,51 883,19 756,74 791,33 627,02 712,60 > 600 1448,98 1511,69 1568,46 1463,92 1346,19 1392,66 1427,69 1253,37 1285,06 1337,13 1450,11 1368,49 1364,36 - 1408,45 1405,07 1490,75 1364,30 1398,88 1234,57 1320,15 Lombardia 160 693,90 701,15 801,67 683,03 553,99 560,78 662,66 510,97 - 569,83 685,07 558,51 537,63 529,08 641,15 640,67 796,23 574,36 546,06 520,54 530,21 161-200 696,78 704,03 804,55 685,92 556,87 563,66 665,54 513,85 - 572,72 687,95 561,40 540,51 531,96 644,03 643,56 799,12 577,24 548,94 523,42 533,10 201-249 812,07 819,32 919,84 801,21 672,16 678,95 780,83 629,14 - 688,01 803,24 676,69 655,80 647,26 759,32 758,85 914,41 692,54 664,24 638,71 648,39 250-300 953,31 960,55 1061,07 942,44 813,39 820,18 922,06 770,37 - 829,24 944,48 817,92 797,03 788,49 900,55 900,08 1055,64 833,77 805,47 779,94 789,62 301-600 1100,30 1107,55 1208,07 1089,43 960,39 967,18 1069,06 917,37 - 976,23 1091,47 964,91 944,03 935,48 1047,55 1047,07 1202,63 980,76 952,46 926,94 936,61 > 600 1964,98 1972,23 2072,75 1954,11 1825,07 1831,86 1933,74 1782,05 - 1840,91 1956,15 1829,59 1808,71 1800,16 1912,23 1911,75 2067,31 1845,44 1817,14 1791,61 1801,29 Veneto 160 499,08 556,36 601,42 462,97 360,53 334,49 462,41 403,54 366,19 367,32 491,61 393,36 316,15 400,15 461,84 545,70 600,51 392,22 422,28 452,16 - 161-200 500,94 558,22 603,27 464,83 362,38 336,35 464,26 405,40 368,04 369,18 493,47 395,21 318,01 402,00 463,70 547,56 602,37 394,08 424,13 454,02 - 201-249 575,22 632,50 677,56 539,11 436,67 410,63 538,55 479,68 442,33 443,46 567,75 469,50 392,29 476,29 537,98 621,84 676,65 468,36 498,42 528,30 - 250-300 666,22 723,50 768,56 630,11 527,67 501,63 629,55 570,68 533,33 534,46 658,75 560,49 483,29 567,29 628,98 712,84 767,65 559,36 589,42 619,30 - 301-600 760,93 818,21 863,27 724,82 622,38 596,34 724,26 665,39 628,04 629,17 753,46 655,21 578,00 662,00 723,69 807,55 862,36 654,07 684,13 714,01 - > 600 1318,06 1375,34 1420,39 1281,95 1179,51 1153,47 1281,39 1222,52 1185,17 1186,30 1310,59 1212,33 1135,13 1219,13 1280,82 1364,68 1419,49 1211,20 1241,26 1271,14 - Friuli Venezia Giulia 160 577,72 616,26 655,77 653,62 406,84 - 464,57 471,59 450,99 514,38 570,24 454,61 433,67 526,89 592,49 630,50 676,37 421,56 513,87 480,42 388,73 161-200 579,91 618,46 657,96 655,81 409,04 - 466,77 473,79 453,18 516,58 572,44 456,81 435,86 529,08 594,68 632,70 678,57 423,75 516,07 482,62 390,92 201-249 667,75 706,30 745,81 743,66 496,88 - 554,61 561,63 541,03 604,42 660,28 544,65 523,71 616,93 682,53 720,54 766,41 511,60 603,91 570,46 478,77 250-300 775,36 813,91 853,41 851,26 604,49 - 662,22 669,24 648,63 712,03 767,89 652,26 631,32 724,54 790,13 828,15 874,02 619,20 711,52 678,07 586,37 301-600 887,36 925,91 965,41 963,26 716,49 - 774,22 781,24 760,63 824,03 879,89 764,26 743,31 836,54 902,13 940,15 986,02 731,20 823,52 790,07 698,37 > 600 1546,18 1584,73 1624,24 1622,09 1375,31 - 1433,04 1440,06 1419,46 1482,85 1538,71 1423,08 1402,14 1495,36 1560,96 1598,97 1644,84 1390,03 1482,34 1448,89 1357,20 No. of training hours Abruzzo Basilicata Calabria Campania EmiliaRomagna FriuliVeneziaGiulia Lazio Liguria Lombardia Marche Molise PABolzano PATrento Piemonte Puglia Sardegna Sicilia Toscana Umbria Valled’Aosta Veneto Region where the training is taking place Emilia Romagna 160 562,62 596,13 664,95 573,49 - 450,10 525,95 432,89 487,46 456,89 555,15 476,14 469,35 523,68 535,00 583,58 686,69 448,97 446,71 541,11 458,03 161-200 565,09 598,60 667,42 575,96 - 452,57 528,41 435,36 489,92 459,36 557,62 478,60 471,81 526,15 537,47 586,04 689,16 451,44 449,17 543,58 460,49 201-249 663,75 697,25 766,08 674,61 - 551,23 627,07 534,02 588,58 558,02 656,28 577,26 570,47 624,81 636,13 684,70 787,81 550,09 547,83 642,24 559,15 250-300 784,60 818,11 886,94 795,47 - 672,08 747,93 654,88 709,44 678,87 777,13 698,12 691,33 745,66 756,98 805,56 908,67 670,95 668,69 763,10 680,01 301-600 910,39 943,90 1012,73 921,26 - 797,87 873,72 780,67 835,23 804,66 902,92 823,91 817,12 871,45 882,77 931,35 1034,46 796,74 794,48 888,88 805,80 > 600 1650,33 1683,84 1752,66 1661,20 - 1537,81 1613,65 1520,60 1575,16 1544,60 1642,86 1563,84 1557,05 1611,39 1622,71 1671,28 1774,40 1536,68 1534,41 1628,82 1545,73 Toscana 160 448,73 556,73 618,76 540,88 434,47 450,32 479,75 447,60 493,34 488,24 506,69 491,07 479,75 527,30 592,95 569,54 654,08 - 416,36 549,26 475,22 161-200 451,11 559,10 621,14 543,26 436,85 452,70 482,13 449,98 495,71 490,62 509,07 493,45 482,13 529,67 595,33 571,92 656,46 - 418,74 551,63 477,60 201-249 546,14 654,14 716,17 638,29 531,88 547,73 577,16 545,01 590,75 585,65 604,10 588,48 577,16 624,71 690,36 666,95 751,49 - 513,77 646,67 572,63 250-300 662,56 770,55 832,59 754,71 648,30 664,15 693,58 661,43 707,16 702,07 720,52 704,90 693,58 741,12 806,78 783,37 867,91 - 630,19 763,08 689,05 301-600 783,73 891,72 953,76 875,87 769,47 785,31 814,75 782,60 828,33 823,24 841,69 826,07 814,75 862,29 927,95 904,54 989,07 - 751,35 884,25 810,22 > 600 1496,48 1604,48 1666,51 1588,63 1482,22 1498,07 1527,50 1495,35 1541,08 1535,99 1554,44 1538,82 1527,50 1575,04 1640,70 1617,29 1701,83 - 1464,11 1597,01 1522,97 Marche 160 347,07 385,44 531,24 457,95 350,35 451,10 358,27 406,16 396,76 - 364,05 372,99 365,07 408,08 395,63 539,29 504,30 396,20 332,01 488,34 358,27 161-200 348,87 387,24 533,04 459,75 352,15 452,90 360,07 407,96 398,56 - 365,85 374,79 366,87 409,88 397,43 541,09 506,10 398,00 333,81 490,14 360,07 201-249 420,89 459,27 605,07 531,77 424,17 524,92 432,10 479,98 470,59 - 437,87 446,81 438,89 481,91 469,45 613,12 578,13 470,02 405,83 562,16 432,10 250-300 509,12 547,49 693,29 620,00 512,40 613,15 520,32 568,21 558,81 - 526,10 535,04 527,12 570,13 557,68 701,34 666,35 558,25 494,06 650,39 520,32 301-600 600,95 639,32 785,12 711,83 604,23 704,98 612,15 660,04 650,64 - 617,93 626,87 618,95 661,96 649,51 793,17 758,18 650,08 585,89 742,22 612,15 > 600 1141,12 1179,49 1325,29 1251,99 1144,40 1245,15 1152,32 1200,21 1190,81 - 1158,10 1167,04 1159,11 1202,13 1189,68 1333,34 1298,35 1190,24 1126,06 1282,39 1152,32 Abruzzo 160 - 353,35 434,18 394,78 437,35 495,70 295,17 417,99 502,10 328,34 315,15 337,28 467,86 501,19 362,41 451,81 434,52 337,96 292,68 538,66 471,31 161-200 - 355,04 435,86 396,47 439,03 497,39 296,85 419,67 503,78 330,02 316,83 338,96 469,54 502,88 364,09 453,50 436,20 339,64 294,36 540,35 472,99 201-249 - 422,38 503,20 463,81 506,37 564,73 364,19 487,01 571,12 397,36 384,17 406,30 536,88 570,22 431,43 520,84 503,54 406,98 361,70 607,69 540,33 250-300 - 504,87 585,69 546,30 588,86 647,22 446,68 569,51 653,61 479,85 466,66 488,79 619,37 652,71 513,92 603,33 586,03 489,47 444,19 690,18 622,82 301-600 - 590,73 671,55 632,16 674,72 733,08 532,54 655,36 739,47 565,71 552,52 574,65 705,23 738,57 599,78 689,19 671,89 575,33 530,05 776,03 708,68 > 600 - 1095,77 1176,60 1137,21 1179,77 1238,12 1037,59 1160,41 1244,52 1070,76 1057,57 1079,70 1210,28 1243,61 1104,83 1194,24 1176,94 1080,38 1035,10 1281,08 1213,73 Umbria 160 361,45 480,87 516,31 489,14 390,20 500,63 392,46 413,63 423,03 382,05 444,88 465,14 458,57 519,87 494,91 549,11 527,63 374,35 - 537,30 463,27 161-200 363,56 482,99 518,42 491,25 392,31 502,74 394,58 415,75 425,14 384,16 446,99 467,25 460,69 521,98 497,02 551,22 529,74 376,47 - 539,42 465,38 201-249 448,09 567,52 602,95 575,78 476,85 587,27 479,11 500,28 509,67 468,70 531,52 551,78 545,22 606,52 581,56 635,76 614,27 461,00 - 623,95 549,92 250-300 551,65 671,07 706,50 679,34 580,40 690,82 582,66 603,83 613,23 572,25 635,07 655,34 648,77 710,07 685,11 739,31 717,82 564,55 - 727,50 653,47 301-600 659,42 778,85 814,28 787,11 688,18 798,60 690,44 711,61 721,00 680,03 742,85 763,12 756,55 817,85 792,89 847,09 825,60 672,33 - 835,28 761,25 > 600 1293,42 1412,84 1448,27 1421,11 1322,17 1432,59 1324,43 1345,60 1355,00 1314,02 1376,84 1397,11 1390,54 1451,84 1426,88 1481,08 1459,59 1306,32 - 1469,27 1395,24 Lazio 160 512,01 554,12 625,21 585,81 617,51 599,40 - 615,25 687,69 556,38 515,40 658,26 646,94 696,75 599,40 642,84 624,30 585,81 540,53 716,50 651,47 161-200 515,05 557,16 628,25 588,85 620,55 602,44 - 618,28 690,73 559,42 518,44 661,30 649,98 699,79 602,44 645,88 627,34 588,85 543,57 719,54 654,51 201-249 636,60 678,71 749,80 710,40 742,10 723,99 - 739,83 812,28 680,97 639,99 782,85 771,53 821,34 723,99 767,43 748,89 710,40 665,12 841,09 776,06 250-300 785,49 827,60 898,69 859,30 891,00 872,88 - 888,73 961,18 829,87 788,89 931,75 920,43 970,24 872,88 916,33 897,79 859,30 814,02 989,99 924,96 301-600 940,47 982,58 1053,67 1014,27 1045,97 1027,86 - 1043,71 1116,15 984,84 943,86 1086,72 1075,40 1125,21 1027,86 1071,31 1052,76 1014,27 968,99 1144,96 1079,93 > 600 1852,09 1894,20 1965,29 1925,89 1957,59 1939,48 - 1955,33 2027,77 1896,46 1855,48 1998,34 1987,02 2036,83 1939,48 1982,93 1964,38 1925,89 1880,61 2056,58 1991,55 Campania 160 452,64 361,17 417,55 - 506,07 629,46 426,83 440,41 549,08 497,07 348,49 598,89 586,27 573,99 416,41 517,43 440,41 487,96 478,22 580,21 493,05 161-200 454,68 363,22 419,59 - 508,11 631,50 428,87 442,46 551,13 499,11 350,54 600,94 588,32 576,03 418,46 519,48 442,46 490,00 480,27 582,26 495,10 201-249 536,49 445,02 501,39 - 589,92 713,30 510,68 524,26 632,93 580,92 432,34 682,74 670,12 657,84 500,26 601,28 524,26 571,80 562,07 664,06 576,90 250-300 636,69 545,23 601,60 - 690,13 813,51 610,89 624,47 733,14 681,13 532,55 782,95 770,33 758,05 600,47 701,49 624,47 672,01 662,28 764,27 677,11 301-600 740,99 649,53 705,90 - 794,42 917,81 715,18 728,77 837,44 785,42 636,85 887,25 874,63 862,34 704,77 805,79 728,77 776,31 766,58 868,57 781,41 > 600 1354,52 1263,05 1319,43 - 1407,95 1531,34 1328,71 1342,29 1450,96 1398,95 1250,37 1500,77 1488,15 1475,87 1318,29 1419,31 1342,29 1389,84 1380,10 1482,09 1394,93 Molise 160 354,06 339,51 393,85 329,55 468,79 527,14 337,48 460,30 532,18 384,23 - 504,33 502,58 541,24 378,57 494,12 448,75 434,83 415,02 567,78 502,75 161-200 355,99 341,44 395,78 331,48 470,71 529,07 339,40 462,22 534,11 386,15 - 506,26 504,50 543,16 380,49 496,05 450,68 436,75 416,94 569,71 504,67 201-249 433,05 418,51 472,84 408,55 547,78 606,14 416,47 539,29 611,17 463,22 - 583,33 581,57 620,23 457,56 573,12 527,75 513,82 494,01 646,78 581,74 250-300 527,46 512,92 567,25 502,95 642,19 700,54 510,88 633,70 705,58 557,63 - 677,73 675,98 714,64 551,97 667,52 622,15 608,23 588,42 741,18 676,15 301-600 625,72 611,18 665,51 601,21 740,45 798,81 609,14 731,96 803,84 655,89 - 776,00 774,24 812,90 650,23 765,78 720,41 706,49 686,68 839,44 774,41 > 600 1203,73 1189,18 1243,52 1179,22 1318,46 1376,81 1187,14 1309,97 1381,85 1233,90 - 1354,00 1352,25 1390,90 1228,24 1343,79 1298,42 1284,50 1264,69 1417,45 1352,42 No. of training hours Abruzzo Basilicata Calabria Campania EmiliaRomagna FriuliVeneziaGiulia Lazio Liguria Lombardia Marche Molise PABolzano PATrento Piemonte Puglia Sardegna Sicilia Toscana Umbria Valled’Aosta Veneto Region where the training is taking place Basilicata 160 320,95 - 308,39 270,92 438,46 501,85 304,88 473,77 476,94 334,31 268,20 472,98 464,27 531,51 292,43 461,14 351,29 413,55 379,71 508,07 496,19 161-200 322,44 - 309,87 272,40 439,94 503,33 306,36 475,26 478,43 335,79 269,68 474,46 465,75 532,99 293,91 462,62 352,77 415,03 381,19 509,56 497,67 201-249 381,68 - 369,11 331,64 499,18 562,57 365,60 534,50 537,67 395,03 328,92 533,70 524,99 592,23 353,15 521,86 412,01 474,27 440,43 568,80 556,91 250-300 454,25 - 441,68 404,21 571,75 635,14 438,17 607,07 610,23 467,60 401,49 606,27 597,56 664,80 425,72 594,43 484,58 546,84 513,00 641,36 629,48 301-600 529,78 - 517,21 479,74 647,28 710,67 513,70 682,60 685,77 543,13 477,02 681,80 673,09 740,33 501,25 669,96 560,11 622,37 588,53 716,90 705,01 > 600 974,08 - 961,51 924,04 1091,58 1154,97 958,00 1126,90 1130,07 987,43 921,33 1126,10 1117,39 1184,63 945,55 1114,26 1004,41 1066,67 1032,83 1161,20 1149,31 Puglia 160 372,30 334,71 348,30 368,45 419,61 520,36 392,45 529,42 459,23 386,79 349,54 417,35 411,69 470,55 - 558,67 426,86 492,06 436,03 554,83 443,95 161-200 374,04 336,46 350,04 370,19 421,36 522,11 394,19 531,16 460,98 388,53 351,29 419,09 413,43 472,30 - 560,41 428,60 493,81 437,77 556,58 445,70 201-249 443,85 406,27 419,85 440,00 491,17 591,92 464,00 600,97 530,79 458,34 421,10 488,91 483,25 542,11 - 630,22 498,41 563,62 507,58 626,39 515,51 250-300 529,37 491,79 505,37 525,52 576,69 677,44 549,52 686,49 616,31 543,86 506,62 574,42 568,76 627,63 - 715,74 583,93 649,14 593,10 711,91 601,03 301-600 618,38 580,80 594,38 614,53 665,70 766,45 638,53 775,50 705,32 632,87 595,63 663,43 657,77 716,64 - 804,75 672,94 738,15 682,11 800,92 690,04 > 600 1141,97 1104,38 1117,97 1138,12 1189,28 1290,03 1162,11 1299,09 1228,90 1156,45 1119,21 1187,02 1181,36 1240,22 - 1328,34 1196,53 1261,73 1205,70 1324,50 1213,62 Calabria 160 447,87 354,48 - 373,38 553,37 587,45 422,06 525,07 623,56 526,20 368,63 568,09 556,77 634,37 352,10 563,61 358,67 521,68 461,23 652,37 587,33 161-200 449,64 356,25 - 375,15 555,14 589,22 423,83 526,84 625,33 527,97 370,40 569,86 558,54 636,14 353,87 565,38 360,44 523,45 463,00 654,14 589,10 201-249 520,40 427,01 - 445,92 625,90 659,98 494,59 597,60 696,09 598,74 441,16 640,62 629,30 706,90 424,64 636,14 431,20 594,21 533,76 724,90 659,86 250-300 607,09 513,70 - 532,60 712,59 746,66 581,28 684,29 782,77 685,42 527,85 727,31 715,99 793,58 511,32 722,82 517,89 680,89 620,44 811,58 746,55 301-600 697,31 603,92 - 622,82 802,81 836,88 671,50 774,51 873,00 775,64 618,07 817,53 806,21 883,81 601,54 813,04 608,11 771,12 710,67 901,81 836,77 > 600 1228,03 1134,64 - 1153,54 1333,53 1367,61 1202,22 1305,23 1403,72 1306,36 1148,79 1348,25 1336,93 1414,53 1132,26 1343,77 1138,83 1301,84 1241,39 1432,53 1367,49 Sicilia 160 523,88 473,06 434,34 471,93 650,78 683,72 496,83 590,33 693,80 574,94 499,21 668,89 666,97 632,33 506,34 544,54 - 632,67 548,22 709,08 662,10 161-200 526,13 475,30 436,59 474,17 653,02 685,96 499,07 592,57 696,04 577,18 501,45 671,14 669,21 634,57 508,58 546,79 - 634,91 550,46 711,32 664,34 201-249 615,81 564,98 526,27 563,85 742,70 775,65 588,75 682,26 785,72 666,86 591,13 760,82 758,89 724,25 598,26 636,47 - 724,59 640,15 801,00 754,02 250-300 725,67 674,84 636,13 673,71 852,56 885,51 698,61 792,12 895,58 776,72 700,99 870,68 868,75 834,11 708,12 746,33 - 834,45 750,01 910,86 863,88 301-600 840,01 789,18 750,47 788,05 966,91 999,85 812,96 906,46 1009,92 891,06 815,33 985,02 983,10 948,46 822,46 860,67 - 948,80 864,35 1025,21 978,23 > 600 1512,62 1461,79 1423,08 1460,66 1639,52 1672,46 1485,57 1579,07 1682,53 1563,67 1487,94 1657,63 1655,71 1621,07 1495,08 1533,28 - 1621,41 1536,96 1697,82 1650,84 Sardegna 160 410,58 452,31 508,68 418,35 417,07 507,25 384,77 452,27 407,64 479,33 413,98 501,59 475,39 416,05 507,55 - 413,94 417,53 439,11 433,48 476,69 161-200 412,01 453,73 510,10 419,77 418,49 508,68 386,20 453,70 409,06 480,75 415,40 503,02 476,81 417,47 508,97 - 415,37 418,96 440,53 434,91 478,11 201-249 469,04 510,76 567,14 476,80 475,52 565,71 443,23 510,73 466,09 537,78 472,43 560,05 533,84 474,50 566,00 - 472,40 475,99 497,56 491,94 535,15 250-300 538,90 580,63 637,00 546,67 545,39 635,57 513,09 580,59 535,96 607,65 542,30 629,91 603,71 544,37 635,87 - 542,26 545,85 567,43 561,80 605,01 301-600 611,61 653,34 709,71 619,38 618,10 708,29 585,80 653,31 608,67 680,36 615,01 702,63 676,42 617,08 708,58 - 614,98 618,56 640,14 634,51 677,72 > 600 1039,35 1081,07 1137,45 1047,11 1045,83 1136,02 1013,54 1081,04 1036,40 1108,09 1042,74 1130,36 1104,15 1044,81 1136,31 - 1042,71 1046,30 1067,87 1062,25 1105,46 Grp. 35. Allowances for traineeships under transnational mobility (in EUR) Country Months SA MA GA 1 2 3 4 5 6 Austria 1617 2312 3094 4082 4732 5382 162,5 650,2 22,733 Belgium 1501 2183 2841 3719 4305 4890 151,0 585,3 21,575 Bulgaria 990 1413 1831 2583 2980 3377 99,2 396,7 13,97 Cyprus 1342 1854 2499 3316 3957 4495 134,5 538,2 18,94 Czechia 1365 1876 2522 3369 4018 4564 136,5 546,17 19,51 Germany 1477 1477 2751 3749 4344 4939 148,7 594,67 21,24 Denmark 1973 2840 3707 5080,5 5889 6698 202,1 808,5 28,88 Estonia 1504 2226 2949 3765 4366 4968 150,3 601,33 21,48 Spain 1552 2199 2860 3894 4514 5133 154,8 619,17 22,11 Finland 1806 2587 3351 4537 5260 5982 180,6 722,5 25,80 France 1771 2533 3295 4451 5162 5873 177,8 711 25,39 United Kingdom 1972 2820 3668 4950 5737 6525 196,9 787,67 28,13 Hungary 1255 1790 2324 3223 3727 4231 126,1 504,33 18,01 Greece 1402 2000 2598 3674 4251 4828 144,2 576,83 20,60 Ireland 1788 2559 3330 4493 5210 5927 179,3 717,3 25,62 Iceland 1614 2312 3011 4062 4710 5358 162 648 23,14 Liechenstein 1978 2817 3656 4968 5758 6547 197,4 789,5 28,20 Lithuania 1145 1639 2133 2912 3420 3882 115,6 462,3 16,51 Luxembourg 1501 2148 2794 3802 4406 5010 151 604 21,57 Latvia 1204 1721 2238 3104 3589 4074 121,2 484,8 17,32 Malta 1315 1883 2452 3362 3891 4420 132,3 529 18,89 Netherlands 1597 2350 3058 4144 4805 5466 165,3 661,2 23,61 Norway 2129 3035 3942 5341 6189 7036 211,9 847,7 30,27 Poland 1232 1758 2284 3174 3669 4165 123,9 495,5 17,70 Portugal 1371 1959 2548 3492 4041 4591 137,4 549,5 19,63 Romania 1056 1507 1958 2745 3170 3596 106,3 425,3 15,19 Sweden 1771 2533 3288 4452 5161 5871 177,3 709,3 25,33 Slovenia 1363 1945 2526 3465 4011 4556 136,3 545,3 19,48 Slovakia 1293 1850 2408 3308 3827 4346 129,8 519,2 18,54 Turkey 1194 1706 2218 3071 3552 4033 120,3 481 17,18 Switzerland 1879 2579 3279 4670 5370 6070 175,0 700,0 25,00 Croatia 1157 1589 2021 2953 3385 3817 108 432 15,43 Grp. 36. Allowances for interview(s) Place or country of destination Distance (KM) Amount (EUR) Travel and accommodation Daily subsistence allowance (DSA) Any EU-28 or Iceland and Norway 0-50 0 50/day (> 12 hours) 25/½ day (> 6 - 12 hours) Max 3 days > 50-250 100 > 250-500 250 > 500 350 Grp. 37. Allowance to move to another Member State (work placement) Country of Destination Amount (EUR) Austria 1025 Belgium 970 Bulgaria 635 Croatia 675 Cyprus 835 Czechia 750 Denmark 1270 Estonia 750 Finland 1090 France 1045 Germany 940 Greece 910 Hungary 655 Iceland 945 Ireland 1015 Italy 995 Latvia 675 Lithuania 675 Luxembourg 970 Malta 825 Netherlands 950 Norway 1270 Poland 655 Portugal 825 Romania 635 Slovakia 740 Slovenia 825 Spain 890 Sweden 1090 United Kingdom 1060 Grp. 38. Daily accommodation costs (in EUR) Student daily allowances Staff daily allowances Country Group Country (Day 1-day 14) (Day 15-Day 60) (Day 1-day 14) (Day 15-Day 60) Group A United Kingdom 90 63 128 90 Group B Denmark 86 60 128 90 Group C Netherlands 83 58 128 90 Sweden 83 58 128 90 Group D Cyprus 77 54 112 78 Finland 77 54 112 78 Luxembourg 77 54 112 78 Group E Austria 74 52 112 78 Belgium 74 52 112 78 Bulgaria 74 52 112 78 Czechia 74 52 112 78 Group F Greece 70 49 112 78 Hungary 70 49 112 78 Switzerland 70 49 112 78 Liechtenstein 70 49 112 78 Norway 70 49 112 78 Poland 70 49 112 78 Romania 70 49 112 78 Turkey 70 49 112 78 Group G Germany 67 47 96 67 Spain 67 47 96 67 Latvia 67 47 96 67 North Macedonia 67 47 96 67 Malta 67 47 96 67 Slovakia 67 47 96 67 Group H Croatia 58 41 80 56 Estonia 58 41 80 56 Lithuania 58 41 80 56 Slovenia 58 41 80 56 Group I France 80 56 112 78 Ireland 80 56 128 90 Iceland 80 56 112 78 Group L Portugal 64 45 96 67
2.
(a) For standard scales of unit costs 1-9 and 19-20, the amounts may be adjusted where the FOI index (consumer price index for blue and white collar worker households, excluding tobacco products) shows a monetary revaluation equal to or exceeding 5 %. In particular, in a given year y, the adjustment is made if in a period y+t the difference between the benchmarking coefficients shown by the FOI index for such years is equal to or higher than 5 %. The base year applied — and on the basis of which the amounts were adjusted — is 2014. Where this rate is equal to or higher than 5 %, each unit cost may be adjusted accordingly.
(b) For standard scale of unit costs 10, the rate may be adjusted by replacing the montly scholarship and/or social security contributions in the calculation method that consists of monthly scholarship plus social security contributions plus an amount for all other costs. Updated data can be found in amendments to the Ministerial Decree of 18.6.2008 (which defines the total gross annual amount of PhD scholarships) and biannual adjustment of the rate of social security contributions (Circular letter No 13 of 29/01/2016 of the Director-General of INPS, the National Institute for Social Security).
(c) For standard scales of unit costs 11-15, which are based on the historical average number of certificates (output) awarded per module, the rate may be adjusted at the end of each financial year (31/12) following an assessment by the Managing Authority of the implementation of the operations related to each of the unit costs. Where such an assessment shows a divergence in the average number of certificates awarded per module for each type of training as compared to the average number used as the basis for calculating the existing unit cost, then a new unit cost will be calculated according to the following formula:
(d) For standard scales of unit costs 17, the rates will be reviewed every four years and if, taking 2017 as the reference year, there is an increase of more than 5 % an adjustment will be made by ISTAT based on the FOI consumer price index (consumer price index for blue and white collar worker households, excluding tobacco products).
(e) For standard scales of unit costs 18, the rates may be adjusted following amendments of the current legislation (which includes Law n.240/2010, the Presidential Decree n.232/2011, the Law n.232/2016 (Budget Law 2017), Law n.448/1998 Misure di finanza pubblica per la stabilizzazione e lo sviluppo, Law n.335/1995, Legislative Decree n.446/1997, and the Presidential Decree n.1032/1973.) as well as changes of the social security contribution rates.
(f) The amounts for unit costs 21 and 22 may be adapted following amendments to the legislative provisions of Legislative Decree 77/2002, Directorial Determination (DD) of 19 December 2007 and D.D. n. 348 of 18 May 2016 of the Presidency of the Council of Ministers — Department of Youth and Civilian Service
3.1 Interregional travel costs (in EUR) Region of origin Travel costs Destination region Valle d’Aosta PA Bolzano PA Trento Liguria Piemonte Lombardia Veneto Friuli Venezia Giulia Emilia-Romagna Toscana Marche Abruzzo Umbria Lazio Campania Molise Basilicata Puglia Calabria Sicilia Sardegna Abruzzo 269,30 211,17 198,50 148,63 231,83 232,74 201,95 226,34 167,99 68,60 58,98 0,00 23,32 25,81 125,43 45,79 83,99 93,05 164,82 165,16 182,46 Basilicata 271,11 236,02 227,31 236,81 294,55 239,98 259,23 264,89 201,50 176,59 97,35 83,99 142,75 67,92 33,96 31,24 0,00 55,47 71,43 114,33 224,18 Calabria 369,32 285,04 273,72 242,02 351,32 340,51 304,28 304,39 270,32 238,63 243,15 164,82 178,18 139,01 90,33 85,58 71,43 69,05 0,00 75,62 280,55 Campania 253,00 271,68 259,06 113,20 246,78 221,87 165,84 302,24 178,86 160,74 169,86 125,43 151,01 99,62 0,00 21,28 33,96 89,20 90,33 113,20 190,22 Emilia-Romagna 146,48 81,50 74,71 38,26 129,05 92,82 63,39 55,47 0,00 54,34 62,26 167,99 52,07 131,31 178,86 160,52 201,50 140,37 270,32 292,06 188,94 Friuli Venezia Giulia 129,05 103,24 82,30 120,22 175,52 99,62 37,36 0,00 55,47 70,18 163,01 226,34 162,50 113,20 302,24 218,87 264,89 241,12 304,39 325,00 279,13 Lazio 230,31 172,06 160,74 129,05 210,55 201,50 165,27 113,20 131,31 99,62 70,18 25,81 54,34 0,00 99,62 29,21 67,92 113,20 139,01 138,10 156,65 Liguria 53,66 113,94 105,11 0,00 36,22 49,81 106,41 120,22 38,26 67,47 118,07 148,63 75,50 129,05 113,20 152,03 236,81 250,17 242,02 231,61 224,15 Lombardia 59,37 97,35 76,47 49,81 67,92 0,00 69,05 99,62 92,82 113,20 108,67 232,74 84,90 201,50 221,87 223,91 239,98 179,99 340,51 335,07 179,51 Marche 200,25 84,90 76,98 118,07 119,99 108,67 70,18 163,01 62,26 108,11 0,00 58,98 43,92 70,18 169,86 75,96 97,35 107,54 243,15 216,21 251,20 Molise 259,51 196,06 194,31 152,03 232,97 223,91 194,48 218,87 160,52 126,56 75,96 45,79 106,75 29,21 21,28 0,00 31,24 70,30 85,58 140,48 185,85 PA Bolzano 118,58 0,00 36,22 113,94 151,35 97,35 96,22 103,24 81,50 110,94 84,90 67,92 127,01 172,06 271,68 196,06 236,02 138,10 285,04 310,17 273,47 PA Trento 112,24 36,22 0,00 105,11 147,22 76,47 19,02 82,30 74,71 99,62 76,98 198,50 120,44 160,74 259,06 194,31 227,31 132,44 273,72 308,24 247,26 Piemonte 17,43 151,35 147,22 36,22 0,00 67,92 103,01 175,52 129,05 147,16 119,99 231,83 181,74 210,55 246,78 232,97 294,55 191,31 351,32 273,60 187,92 Puglia 275,59 138,10 132,44 250,17 191,31 179,99 164,71 241,12 140,37 212,82 107,54 93,05 156,78 113,20 89,20 70,30 55,47 0,00 69,05 147,61 279,42 Sardegna 205,36 273,47 247,26 224,15 187,92 179,51 248,56 279,13 188,94 189,41 251,20 182,46 210,98 156,65 190,22 185,85 224,18 279,42 280,55 185,82 0,00 Sicilia 350,35 310,17 308,24 231,61 273,60 335,07 303,38 325,00 292,06 273,94 216,21 165,16 189,50 138,10 113,20 140,48 114,33 147,61 75,62 0,00 185,82 Toscana 169,12 110,94 99,62 67,47 147,16 113,20 95,09 70,18 54,34 0,00 108,11 68,60 36,22 99,62 160,74 126,56 176,59 212,82 238,63 273,94 189,41 Umbria 199,18 127,01 120,44 75,50 181,74 84,90 125,14 162,50 52,07 36,22 43,92 23,32 0,00 54,34 151,01 106,75 142,75 156,78 178,18 189,50 210,98 Valle d’Aosta 0,00 118,58 112,24 53,66 17,43 59,37 155,03 129,05 146,48 169,12 200,25 269,30 199,18 230,31 253,00 259,51 271,11 275,59 369,32 350,35 205,36 Veneto 155,03 96,22 19,02 106,41 103,01 69,05 0,00 37,36 63,39 95,09 70,18 201,95 125,14 165,27 165,84 194,48 259,23 164,71 304,28 303,38 248,56
3.2 Interregional accommodation costs (for more than 600 hours) (in EUR) Region of origin ACCOMMODATION COSTS Destination region Valle d’Aosta PA Bolzano PA Trento Liguria Piemonte Lombardia Veneto Friuli Venezia Giulia Emilia-Romagna Toscana Marche Abruzzo Umbria Lazio Campania Molise Basilicata Puglia Calabria Sicilia Sardegna Abruzzo 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Basilicata 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Calabria 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Campania 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Emilia-Romagna 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Friuli Venezia Giulia 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Lazio 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Liguria 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Lombardia 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Marche 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Molise 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 PA Bolzano 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 PA Trento 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Piemonte 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Puglia 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Sardegna 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Sicilia 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Toscana 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Umbria 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Valle d’Aosta 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Veneto 803,84 1153,94 788,70 741,25 695,62 1229,98 700,07 703,65 967,41 1227,68 601,19 578,51 628,23 1229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62
3.3 Interregional subsistence costs (for more than 600 hours) (in EUR) Region of origin MEAL COSTS Destination region Valle d’Aosta PA Bolzano PA Trento Liguria Piemonte Lombardia Veneto Friuli Venezia Giulia Emilia-Romagna Toscana Marche Abruzzo Umbria Lazio Campania Molise Basilicata Puglia Calabria Sicilia Sardegna Abruzzo 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Basilicata 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Calabria 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Campania 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Emilia-Romagna 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Friuli Venezia Giulia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Lazio 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Liguria 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Lombardia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Marche 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Molise 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 PA Bolzano 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 PA Trento 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Piemonte 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Puglia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Sardegna 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Sicilia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Toscana 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Umbria 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Valle d’Aosta 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Veneto 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27
3.4 Interregional allowances for traineeships (in EUR) No. of training hours Abruzzo Basilicata Calabria Campania Emilia Romagna Friuli Venezia Giulia Lazio Liguria Lombardia Marche Molise PA Bolzano PA Trento Piemonte Puglia Sardegna Sicilia Toscana Umbria Valle d’Aosta Veneto Region where the training is taking place Valle d’Aosta 160 611,70 613,51 711,72 595,40 488,88 471,45 572,71 396,06 401,77 542,65 601,91 460,98 454,64 359,83 617,99 547,76 692,75 511,52 541,58 - 497,43 161-200 613,84 615,65 713,86 597,54 491,02 473,59 574,85 398,20 403,91 544,79 604,05 463,12 456,78 361,97 620,13 549,90 694,89 513,66 543,72 - 499,57 201-249 699,44 701,25 799,46 683,14 576,62 559,19 660,45 483,80 489,51 630,39 689,65 548,72 542,38 447,57 705,73 635,50 780,49 599,26 629,32 - 585,17 250-300 804,30 806,11 904,32 788,00 681,48 664,05 765,31 588,66 594,37 735,25 794,51 653,58 647,24 552,43 810,59 740,36 885,35 704,12 734,18 - 690,03 301-600 913,44 915,25 1.013,46 897,14 790,62 773,19 874,45 697,80 703,51 844,39 903,65 762,72 756,38 661,57 919,73 849,50 994,49 813,26 843,32 - 799,17 > 600 1555,44 1557,25 1655,46 1539,14 1432,62 1415,19 1516,45 1339,80 1345,51 1486,39 1545,65 1404,72 1398,38 1303,57 1561,73 1491,50 1636,49 1455,26 1485,32 - 1441,17 Bolzano 160 585,59 610,44 659,45 646,09 455,92 477,65 546,48 488,35 471,77 459,31 570,48 - 410,64 525,76 512,52 647,88 684,58 485,35 501,42 492,99 470,63 161-200 587,93 612,78 661,79 648,43 458,26 479,99 548,82 490,69 474,11 461,65 572,82 - 412,98 528,10 514,86 650,22 686,92 487,69 503,76 495,33 472,97 201-249 681,53 706,38 755,39 742,04 551,86 573,60 642,42 584,29 567,71 555,26 666,42 - 506,58 621,71 608,46 743,83 780,53 581,29 597,37 588,93 566,58 250-300 796,20 821,04 870,06 856,70 666,53 688,26 757,09 698,96 682,37 669,92 781,08 - 621,25 736,37 723,13 858,49 895,19 695,96 712,03 703,60 681,24 301-600 915,54 940,39 989,40 976,05 785,87 807,60 876,43 818,30 801,72 789,27 900,43 - 740,59 855,71 842,47 977,83 1.014,53 815,30 831,38 822,94 800,59 > 600 1617,57 1642,41 1691,43 1678,07 1487,90 1509,63 1578,46 1520,33 1503,74 1491,29 1602,45 - 1442,62 1557,74 1544,50 1679,86 1716,56 1517,33 1533,40 1524,97 1502,61 Trento 160 493,91 522,71 569,13 554,47 370,12 377,71 456,15 400,52 371,88 372,38 489,72 331,63 - 442,63 427,85 542,67 603,65 395,02 415,85 407,65 314,43 161-200 495,75 524,56 570,97 556,31 371,97 379,55 458,00 402,36 373,72 374,23 491,56 333,48 - 444,47 429,70 544,52 605,50 396,87 417,70 409,49 316,27 201-249 569,60 598,41 644,82 630,17 445,82 453,40 531,85 476,21 447,57 448,08 565,42 407,33 - 518,32 503,55 618,37 679,35 470,72 491,55 483,35 390,12 250-300 660,07 688,88 735,29 720,63 536,29 543,87 622,32 566,68 538,04 538,55 655,88 497,80 - 608,79 594,02 708,84 769,82 561,19 582,02 573,81 480,59 301-600 754,23 783,04 829,46 814,80 630,45 638,03 716,48 660,84 632,20 632,71 750,05 591,96 - 702,95 688,18 803,00 863,98 655,35 676,18 667,98 574,76 > 600 1308,13 1336,93 1383,35 1368,69 1184,34 1191,93 1270,37 1214,74 1186,10 1186,61 1303,94 1145,85 - 1256,85 1242,07 1356,89 1417,87 1209,25 1230,07 1221,87 1128,65 Liguria 160 454,43 542,61 547,82 419,00 344,06 426,02 434,85 - 355,61 423,87 457,83 419,74 410,91 342,02 555,97 529,95 537,41 373,27 381,30 359,46 412,21 161-200 456,34 544,52 549,73 420,91 345,97 427,93 436,76 - 357,52 425,78 459,74 421,65 412,82 343,93 557,88 531,86 539,32 375,18 383,21 361,37 414,12 201-249 532,79 620,97 626,18 497,36 422,42 504,38 513,21 - 433,97 502,23 536,19 498,10 489,27 420,38 634,33 608,31 615,77 451,63 459,66 437,82 490,57 250-300 626,44 714,63 719,83 591,01 516,07 598,03 606,86 - 527,62 595,88 629,84 591,75 582,92 514,04 727,98 701,96 709,42 545,28 553,32 531,47 584,22 301-600 723,92 812,10 817,31 688,48 613,55 695,50 704,33 - 625,09 693,35 727,31 689,22 680,39 611,51 825,46 799,43 806,89 642,75 650,79 628,94 681,69 > 600 1297,29 1385,47 1390,68 1261,86 1186,92 1268,88 1277,71 - 1198,47 1266,73 1300,69 1262,59 1253,76 1184,88 1398,83 1372,81 1380,27 1216,13 1224,16 1202,32 1255,07 Piemonte 160 555,86 618,58 675,35 570,81 453,08 499,55 534,58 360,26 391,95 444,02 557,00 475,38 471,25 - 515,34 511,95 597,64 471,19 505,77 341,46 427,04 161-200 557,89 620,60 677,37 572,83 455,10 501,57 536,61 362,28 393,98 446,05 559,02 477,40 473,27 - 517,36 513,98 599,66 473,22 507,80 343,49 429,07 201-249 638,90 701,61 758,38 653,84 536,11 582,58 617,62 443,29 474,98 527,06 640,03 558,41 554,28 - 598,37 594,99 680,67 554,22 588,81 424,50 510,08 250-300 738,13 800,85 857,61 753,07 635,35 681,82 716,85 542,52 574,22 626,29 739,26 657,65 653,52 - 697,61 694,22 779,90 653,46 688,04 523,73 609,31 301-600 841,42 904,13 960,90 856,36 738,63 785,10 820,14 645,81 677,50 729,58 842,55 760,93 756,80 - 800,89 797,51 883,19 756,74 791,33 627,02 712,60 > 600 1448,98 1511,69 1568,46 1463,92 1346,19 1392,66 1427,69 1253,37 1285,06 1337,13 1450,11 1368,49 1364,36 - 1408,45 1405,07 1490,75 1364,30 1398,88 1234,57 1320,15 Lombardia 160 693,90 701,15 801,67 683,03 553,99 560,78 662,66 510,97 - 569,83 685,07 558,51 537,63 529,08 641,15 640,67 796,23 574,36 546,06 520,54 530,21 161-200 696,78 704,03 804,55 685,92 556,87 563,66 665,54 513,85 - 572,72 687,95 561,40 540,51 531,96 644,03 643,56 799,12 577,24 548,94 523,42 533,10 201-249 812,07 819,32 919,84 801,21 672,16 678,95 780,83 629,14 - 688,01 803,24 676,69 655,80 647,26 759,32 758,85 914,41 692,54 664,24 638,71 648,39 250-300 953,31 960,55 1061,07 942,44 813,39 820,18 922,06 770,37 - 829,24 944,48 817,92 797,03 788,49 900,55 900,08 1055,64 833,77 805,47 779,94 789,62 301-600 1100,30 1107,55 1208,07 1089,43 960,39 967,18 1069,06 917,37 - 976,23 1091,47 964,91 944,03 935,48 1047,55 1047,07 1202,63 980,76 952,46 926,94 936,61 > 600 1964,98 1972,23 2072,75 1954,11 1825,07 1831,86 1933,74 1782,05 - 1840,91 1956,15 1829,59 1808,71 1800,16 1912,23 1911,75 2067,31 1845,44 1817,14 1791,61 1801,29 Veneto 160 499,08 556,36 601,42 462,97 360,53 334,49 462,41 403,54 366,19 367,32 491,61 393,36 316,15 400,15 461,84 545,70 600,51 392,22 422,28 452,16 - 161-200 500,94 558,22 603,27 464,83 362,38 336,35 464,26 405,40 368,04 369,18 493,47 395,21 318,01 402,00 463,70 547,56 602,37 394,08 424,13 454,02 - 201-249 575,22 632,50 677,56 539,11 436,67 410,63 538,55 479,68 442,33 443,46 567,75 469,50 392,29 476,29 537,98 621,84 676,65 468,36 498,42 528,30 - 250-300 666,22 723,50 768,56 630,11 527,67 501,63 629,55 570,68 533,33 534,46 658,75 560,49 483,29 567,29 628,98 712,84 767,65 559,36 589,42 619,30 - 301-600 760,93 818,21 863,27 724,82 622,38 596,34 724,26 665,39 628,04 629,17 753,46 655,21 578,00 662,00 723,69 807,55 862,36 654,07 684,13 714,01 - > 600 1318,06 1375,34 1420,39 1281,95 1179,51 1153,47 1281,39 1222,52 1185,17 1186,30 1310,59 1212,33 1135,13 1219,13 1280,82 1364,68 1419,49 1211,20 1241,26 1271,14 - Friuli Venezia Giulia 160 577,72 616,26 655,77 653,62 406,84 - 464,57 471,59 450,99 514,38 570,24 454,61 433,67 526,89 592,49 630,50 676,37 421,56 513,87 480,42 388,73 161-200 579,91 618,46 657,96 655,81 409,04 - 466,77 473,79 453,18 516,58 572,44 456,81 435,86 529,08 594,68 632,70 678,57 423,75 516,07 482,62 390,92 201-249 667,75 706,30 745,81 743,66 496,88 - 554,61 561,63 541,03 604,42 660,28 544,65 523,71 616,93 682,53 720,54 766,41 511,60 603,91 570,46 478,77 250-300 775,36 813,91 853,41 851,26 604,49 - 662,22 669,24 648,63 712,03 767,89 652,26 631,32 724,54 790,13 828,15 874,02 619,20 711,52 678,07 586,37 301-600 887,36 925,91 965,41 963,26 716,49 - 774,22 781,24 760,63 824,03 879,89 764,26 743,31 836,54 902,13 940,15 986,02 731,20 823,52 790,07 698,37 > 600 1546,18 1584,73 1624,24 1622,09 1375,31 - 1433,04 1440,06 1419,46 1482,85 1538,71 1423,08 1402,14 1495,36 1560,96 1598,97 1644,84 1390,03 1482,34 1448,89 1357,20 No. of training hours Abruzzo Basilicata Calabria Campania EmiliaRomagna FriuliVeneziaGiulia Lazio Liguria Lombardia Marche Molise PABolzano PATrento Piemonte Puglia Sardegna Sicilia Toscana Umbria Valled’Aosta Veneto Region where the training is taking place Emilia Romagna 160 562,62 596,13 664,95 573,49 - 450,10 525,95 432,89 487,46 456,89 555,15 476,14 469,35 523,68 535,00 583,58 686,69 448,97 446,71 541,11 458,03 161-200 565,09 598,60 667,42 575,96 - 452,57 528,41 435,36 489,92 459,36 557,62 478,60 471,81 526,15 537,47 586,04 689,16 451,44 449,17 543,58 460,49 201-249 663,75 697,25 766,08 674,61 - 551,23 627,07 534,02 588,58 558,02 656,28 577,26 570,47 624,81 636,13 684,70 787,81 550,09 547,83 642,24 559,15 250-300 784,60 818,11 886,94 795,47 - 672,08 747,93 654,88 709,44 678,87 777,13 698,12 691,33 745,66 756,98 805,56 908,67 670,95 668,69 763,10 680,01 301-600 910,39 943,90 1012,73 921,26 - 797,87 873,72 780,67 835,23 804,66 902,92 823,91 817,12 871,45 882,77 931,35 1034,46 796,74 794,48 888,88 805,80 > 600 1650,33 1683,84 1752,66 1661,20 - 1537,81 1613,65 1520,60 1575,16 1544,60 1642,86 1563,84 1557,05 1611,39 1622,71 1671,28 1774,40 1536,68 1534,41 1628,82 1545,73 Toscana 160 448,73 556,73 618,76 540,88 434,47 450,32 479,75 447,60 493,34 488,24 506,69 491,07 479,75 527,30 592,95 569,54 654,08 - 416,36 549,26 475,22 161-200 451,11 559,10 621,14 543,26 436,85 452,70 482,13 449,98 495,71 490,62 509,07 493,45 482,13 529,67 595,33 571,92 656,46 - 418,74 551,63 477,60 201-249 546,14 654,14 716,17 638,29 531,88 547,73 577,16 545,01 590,75 585,65 604,10 588,48 577,16 624,71 690,36 666,95 751,49 - 513,77 646,67 572,63 250-300 662,56 770,55 832,59 754,71 648,30 664,15 693,58 661,43 707,16 702,07 720,52 704,90 693,58 741,12 806,78 783,37 867,91 - 630,19 763,08 689,05 301-600 783,73 891,72 953,76 875,87 769,47 785,31 814,75 782,60 828,33 823,24 841,69 826,07 814,75 862,29 927,95 904,54 989,07 - 751,35 884,25 810,22 > 600 1496,48 1604,48 1666,51 1588,63 1482,22 1498,07 1527,50 1495,35 1541,08 1535,99 1554,44 1538,82 1527,50 1575,04 1640,70 1617,29 1701,83 - 1464,11 1597,01 1522,97 Marche 160 347,07 385,44 531,24 457,95 350,35 451,10 358,27 406,16 396,76 - 364,05 372,99 365,07 408,08 395,63 539,29 504,30 396,20 332,01 488,34 358,27 161-200 348,87 387,24 533,04 459,75 352,15 452,90 360,07 407,96 398,56 - 365,85 374,79 366,87 409,88 397,43 541,09 506,10 398,00 333,81 490,14 360,07 201-249 420,89 459,27 605,07 531,77 424,17 524,92 432,10 479,98 470,59 - 437,87 446,81 438,89 481,91 469,45 613,12 578,13 470,02 405,83 562,16 432,10 250-300 509,12 547,49 693,29 620,00 512,40 613,15 520,32 568,21 558,81 - 526,10 535,04 527,12 570,13 557,68 701,34 666,35 558,25 494,06 650,39 520,32 301-600 600,95 639,32 785,12 711,83 604,23 704,98 612,15 660,04 650,64 - 617,93 626,87 618,95 661,96 649,51 793,17 758,18 650,08 585,89 742,22 612,15 > 600 1141,12 1179,49 1325,29 1251,99 1144,40 1245,15 1152,32 1200,21 1190,81 - 1158,10 1167,04 1159,11 1202,13 1189,68 1333,34 1298,35 1190,24 1126,06 1282,39 1152,32 Abruzzo 160 - 353,35 434,18 394,78 437,35 495,70 295,17 417,99 502,10 328,34 315,15 337,28 467,86 501,19 362,41 451,81 434,52 337,96 292,68 538,66 471,31 161-200 - 355,04 435,86 396,47 439,03 497,39 296,85 419,67 503,78 330,02 316,83 338,96 469,54 502,88 364,09 453,50 436,20 339,64 294,36 540,35 472,99 201-249 - 422,38 503,20 463,81 506,37 564,73 364,19 487,01 571,12 397,36 384,17 406,30 536,88 570,22 431,43 520,84 503,54 406,98 361,70 607,69 540,33 250-300 - 504,87 585,69 546,30 588,86 647,22 446,68 569,51 653,61 479,85 466,66 488,79 619,37 652,71 513,92 603,33 586,03 489,47 444,19 690,18 622,82 301-600 - 590,73 671,55 632,16 674,72 733,08 532,54 655,36 739,47 565,71 552,52 574,65 705,23 738,57 599,78 689,19 671,89 575,33 530,05 776,03 708,68 > 600 - 1095,77 1176,60 1137,21 1179,77 1238,12 1037,59 1160,41 1244,52 1070,76 1057,57 1079,70 1210,28 1243,61 1104,83 1194,24 1176,94 1080,38 1035,10 1281,08 1213,73 Umbria 160 361,45 480,87 516,31 489,14 390,20 500,63 392,46 413,63 423,03 382,05 444,88 465,14 458,57 519,87 494,91 549,11 527,63 374,35 - 537,30 463,27 161-200 363,56 482,99 518,42 491,25 392,31 502,74 394,58 415,75 425,14 384,16 446,99 467,25 460,69 521,98 497,02 551,22 529,74 376,47 - 539,42 465,38 201-249 448,09 567,52 602,95 575,78 476,85 587,27 479,11 500,28 509,67 468,70 531,52 551,78 545,22 606,52 581,56 635,76 614,27 461,00 - 623,95 549,92 250-300 551,65 671,07 706,50 679,34 580,40 690,82 582,66 603,83 613,23 572,25 635,07 655,34 648,77 710,07 685,11 739,31 717,82 564,55 - 727,50 653,47 301-600 659,42 778,85 814,28 787,11 688,18 798,60 690,44 711,61 721,00 680,03 742,85 763,12 756,55 817,85 792,89 847,09 825,60 672,33 - 835,28 761,25 > 600 1293,42 1412,84 1448,27 1421,11 1322,17 1432,59 1324,43 1345,60 1355,00 1314,02 1376,84 1397,11 1390,54 1451,84 1426,88 1481,08 1459,59 1306,32 - 1469,27 1395,24 Lazio 160 512,01 554,12 625,21 585,81 617,51 599,40 - 615,25 687,69 556,38 515,40 658,26 646,94 696,75 599,40 642,84 624,30 585,81 540,53 716,50 651,47 161-200 515,05 557,16 628,25 588,85 620,55 602,44 - 618,28 690,73 559,42 518,44 661,30 649,98 699,79 602,44 645,88 627,34 588,85 543,57 719,54 654,51 201-249 636,60 678,71 749,80 710,40 742,10 723,99 - 739,83 812,28 680,97 639,99 782,85 771,53 821,34 723,99 767,43 748,89 710,40 665,12 841,09 776,06 250-300 785,49 827,60 898,69 859,30 891,00 872,88 - 888,73 961,18 829,87 788,89 931,75 920,43 970,24 872,88 916,33 897,79 859,30 814,02 989,99 924,96 301-600 940,47 982,58 1053,67 1014,27 1045,97 1027,86 - 1043,71 1116,15 984,84 943,86 1086,72 1075,40 1125,21 1027,86 1071,31 1052,76 1014,27 968,99 1144,96 1079,93 > 600 1852,09 1894,20 1965,29 1925,89 1957,59 1939,48 - 1955,33 2027,77 1896,46 1855,48 1998,34 1987,02 2036,83 1939,48 1982,93 1964,38 1925,89 1880,61 2056,58 1991,55 Campania 160 452,64 361,17 417,55 - 506,07 629,46 426,83 440,41 549,08 497,07 348,49 598,89 586,27 573,99 416,41 517,43 440,41 487,96 478,22 580,21 493,05 161-200 454,68 363,22 419,59 - 508,11 631,50 428,87 442,46 551,13 499,11 350,54 600,94 588,32 576,03 418,46 519,48 442,46 490,00 480,27 582,26 495,10 201-249 536,49 445,02 501,39 - 589,92 713,30 510,68 524,26 632,93 580,92 432,34 682,74 670,12 657,84 500,26 601,28 524,26 571,80 562,07 664,06 576,90 250-300 636,69 545,23 601,60 - 690,13 813,51 610,89 624,47 733,14 681,13 532,55 782,95 770,33 758,05 600,47 701,49 624,47 672,01 662,28 764,27 677,11 301-600 740,99 649,53 705,90 - 794,42 917,81 715,18 728,77 837,44 785,42 636,85 887,25 874,63 862,34 704,77 805,79 728,77 776,31 766,58 868,57 781,41 > 600 1354,52 1263,05 1319,43 - 1407,95 1531,34 1328,71 1342,29 1450,96 1398,95 1250,37 1500,77 1488,15 1475,87 1318,29 1419,31 1342,29 1389,84 1380,10 1482,09 1394,93 Molise 160 354,06 339,51 393,85 329,55 468,79 527,14 337,48 460,30 532,18 384,23 - 504,33 502,58 541,24 378,57 494,12 448,75 434,83 415,02 567,78 502,75 161-200 355,99 341,44 395,78 331,48 470,71 529,07 339,40 462,22 534,11 386,15 - 506,26 504,50 543,16 380,49 496,05 450,68 436,75 416,94 569,71 504,67 201-249 433,05 418,51 472,84 408,55 547,78 606,14 416,47 539,29 611,17 463,22 - 583,33 581,57 620,23 457,56 573,12 527,75 513,82 494,01 646,78 581,74 250-300 527,46 512,92 567,25 502,95 642,19 700,54 510,88 633,70 705,58 557,63 - 677,73 675,98 714,64 551,97 667,52 622,15 608,23 588,42 741,18 676,15 301-600 625,72 611,18 665,51 601,21 740,45 798,81 609,14 731,96 803,84 655,89 - 776,00 774,24 812,90 650,23 765,78 720,41 706,49 686,68 839,44 774,41 > 600 1203,73 1189,18 1243,52 1179,22 1318,46 1376,81 1187,14 1309,97 1381,85 1233,90 - 1354,00 1352,25 1390,90 1228,24 1343,79 1298,42 1284,50 1264,69 1417,45 1352,42 No. of training hours Abruzzo Basilicata Calabria Campania EmiliaRomagna FriuliVeneziaGiulia Lazio Liguria Lombardia Marche Molise PABolzano PATrento Piemonte Puglia Sardegna Sicilia Toscana Umbria Valled’Aosta Veneto Region where the training is taking place Basilicata 160 320,95 - 308,39 270,92 438,46 501,85 304,88 473,77 476,94 334,31 268,20 472,98 464,27 531,51 292,43 461,14 351,29 413,55 379,71 508,07 496,19 161-200 322,44 - 309,87 272,40 439,94 503,33 306,36 475,26 478,43 335,79 269,68 474,46 465,75 532,99 293,91 462,62 352,77 415,03 381,19 509,56 497,67 201-249 381,68 - 369,11 331,64 499,18 562,57 365,60 534,50 537,67 395,03 328,92 533,70 524,99 592,23 353,15 521,86 412,01 474,27 440,43 568,80 556,91 250-300 454,25 - 441,68 404,21 571,75 635,14 438,17 607,07 610,23 467,60 401,49 606,27 597,56 664,80 425,72 594,43 484,58 546,84 513,00 641,36 629,48 301-600 529,78 - 517,21 479,74 647,28 710,67 513,70 682,60 685,77 543,13 477,02 681,80 673,09 740,33 501,25 669,96 560,11 622,37 588,53 716,90 705,01 > 600 974,08 - 961,51 924,04 1091,58 1154,97 958,00 1126,90 1130,07 987,43 921,33 1126,10 1117,39 1184,63 945,55 1114,26 1004,41 1066,67 1032,83 1161,20 1149,31 Puglia 160 372,30 334,71 348,30 368,45 419,61 520,36 392,45 529,42 459,23 386,79 349,54 417,35 411,69 470,55 - 558,67 426,86 492,06 436,03 554,83 443,95 161-200 374,04 336,46 350,04 370,19 421,36 522,11 394,19 531,16 460,98 388,53 351,29 419,09 413,43 472,30 - 560,41 428,60 493,81 437,77 556,58 445,70 201-249 443,85 406,27 419,85 440,00 491,17 591,92 464,00 600,97 530,79 458,34 421,10 488,91 483,25 542,11 - 630,22 498,41 563,62 507,58 626,39 515,51 250-300 529,37 491,79 505,37 525,52 576,69 677,44 549,52 686,49 616,31 543,86 506,62 574,42 568,76 627,63 - 715,74 583,93 649,14 593,10 711,91 601,03 301-600 618,38 580,80 594,38 614,53 665,70 766,45 638,53 775,50 705,32 632,87 595,63 663,43 657,77 716,64 - 804,75 672,94 738,15 682,11 800,92 690,04 > 600 1141,97 1104,38 1117,97 1138,12 1189,28 1290,03 1162,11 1299,09 1228,90 1156,45 1119,21 1187,02 1181,36 1240,22 - 1328,34 1196,53 1261,73 1205,70 1324,50 1213,62 Calabria 160 447,87 354,48 - 373,38 553,37 587,45 422,06 525,07 623,56 526,20 368,63 568,09 556,77 634,37 352,10 563,61 358,67 521,68 461,23 652,37 587,33 161-200 449,64 356,25 - 375,15 555,14 589,22 423,83 526,84 625,33 527,97 370,40 569,86 558,54 636,14 353,87 565,38 360,44 523,45 463,00 654,14 589,10 201-249 520,40 427,01 - 445,92 625,90 659,98 494,59 597,60 696,09 598,74 441,16 640,62 629,30 706,90 424,64 636,14 431,20 594,21 533,76 724,90 659,86 250-300 607,09 513,70 - 532,60 712,59 746,66 581,28 684,29 782,77 685,42 527,85 727,31 715,99 793,58 511,32 722,82 517,89 680,89 620,44 811,58 746,55 301-600 697,31 603,92 - 622,82 802,81 836,88 671,50 774,51 873,00 775,64 618,07 817,53 806,21 883,81 601,54 813,04 608,11 771,12 710,67 901,81 836,77 > 600 1228,03 1134,64 - 1153,54 1333,53 1367,61 1202,22 1305,23 1403,72 1306,36 1148,79 1348,25 1336,93 1414,53 1132,26 1343,77 1138,83 1301,84 1241,39 1432,53 1367,49 Sicilia 160 523,88 473,06 434,34 471,93 650,78 683,72 496,83 590,33 693,80 574,94 499,21 668,89 666,97 632,33 506,34 544,54 - 632,67 548,22 709,08 662,10 161-200 526,13 475,30 436,59 474,17 653,02 685,96 499,07 592,57 696,04 577,18 501,45 671,14 669,21 634,57 508,58 546,79 - 634,91 550,46 711,32 664,34 201-249 615,81 564,98 526,27 563,85 742,70 775,65 588,75 682,26 785,72 666,86 591,13 760,82 758,89 724,25 598,26 636,47 - 724,59 640,15 801,00 754,02 250-300 725,67 674,84 636,13 673,71 852,56 885,51 698,61 792,12 895,58 776,72 700,99 870,68 868,75 834,11 708,12 746,33 - 834,45 750,01 910,86 863,88 301-600 840,01 789,18 750,47 788,05 966,91 999,85 812,96 906,46 1009,92 891,06 815,33 985,02 983,10 948,46 822,46 860,67 - 948,80 864,35 1025,21 978,23 > 600 1512,62 1461,79 1423,08 1460,66 1639,52 1672,46 1485,57 1579,07 1682,53 1563,67 1487,94 1657,63 1655,71 1621,07 1495,08 1533,28 - 1621,41 1536,96 1697,82 1650,84 Sardegna 160 410,58 452,31 508,68 418,35 417,07 507,25 384,77 452,27 407,64 479,33 413,98 501,59 475,39 416,05 507,55 - 413,94 417,53 439,11 433,48 476,69 161-200 412,01 453,73 510,10 419,77 418,49 508,68 386,20 453,70 409,06 480,75 415,40 503,02 476,81 417,47 508,97 - 415,37 418,96 440,53 434,91 478,11 201-249 469,04 510,76 567,14 476,80 475,52 565,71 443,23 510,73 466,09 537,78 472,43 560,05 533,84 474,50 566,00 - 472,40 475,99 497,56 491,94 535,15 250-300 538,90 580,63 637,00 546,67 545,39 635,57 513,09 580,59 535,96 607,65 542,30 629,91 603,71 544,37 635,87 - 542,26 545,85 567,43 561,80 605,01 301-600 611,61 653,34 709,71 619,38 618,10 708,29 585,80 653,31 608,67 680,36 615,01 702,63 676,42 617,08 708,58 - 614,98 618,56 640,14 634,51 677,72 > 600 1039,35 1081,07 1137,45 1047,11 1045,83 1136,02 1013,54 1081,04 1036,40 1108,09 1042,74 1130,36 1104,15 1044,81 1136,31 - 1042,71 1046,30 1067,87 1062,25 1105,46
3.5 Allowances for traineeships under transnational mobility (in EUR) Country Months SA MA GA 1 2 3 4 5 6 Austria 1617 2312 3094 4082 4732 5382 162,5 650,2 22,733 Belgium 1501 2183 2841 3719 4305 4890 151,0 585,3 21,575 Bulgaria 990 1413 1831 2583 2980 3377 99,2 396,7 13,97 Cyprus 1342 1854 2499 3316 3957 4495 134,5 538,2 18,94 Czechia 1365 1876 2522 3369 4018 4564 136,5 546,17 19,51 Germany 1477 1477 2751 3749 4344 4939 148,7 594,67 21,24 Denmark 1973 2840 3707 5080,5 5889 6698 202,1 808,5 28,88 Estonia 1504 2226 2949 3765 4366 4968 150,3 601,33 21,48 Spain 1552 2199 2860 3894 4514 5133 154,8 619,17 22,11 Finland 1806 2587 3351 4537 5260 5982 180,6 722,5 25,80 France 1771 2533 3295 4451 5162 5873 177,8 711 25,39 United Kingdom 1972 2820 3668 4950 5737 6525 196,9 787,67 28,13 Hungary 1255 1790 2324 3223 3727 4231 126,1 504,33 18,01 Greece 1402 2000 2598 3674 4251 4828 144,2 576,83 20,60 Ireland 1788 2559 3330 4493 5210 5927 179,3 717,3 25,62 Iceland 1614 2312 3011 4062 4710 5358 162 648 23,14 Liechenstein 1978 2817 3656 4968 5758 6547 197,4 789,5 28,20 Lithuania 1145 1639 2133 2912 3420 3882 115,6 462,3 16,51 Luxembourg 1501 2148 2794 3802 4406 5010 151 604 21,57 Latvia 1204 1721 2238 3104 3589 4074 121,2 484,8 17,32 Malta 1315 1883 2452 3362 3891 4420 132,3 529 18,89 Netherlands 1597 2350 3058 4144 4805 5466 165,3 661,2 23,61 Norway 2129 3035 3942 5341 6189 7036 211,9 847,7 30,27 Poland 1232 1758 2284 3174 3669 4165 123,9 495,5 17,70 Portugal 1371 1959 2548 3492 4041 4591 137,4 549,5 19,63 Romania 1056 1507 1958 2745 3170 3596 106,3 425,3 15,19 Sweden 1771 2533 3288 4452 5161 5871 177,3 709,3 25,33 Slovenia 1363 1945 2526 3465 4011 4556 136,3 545,3 19,48 Slovakia 1293 1850 2408 3308 3827 4346 129,8 519,2 18,54 Turkey 1194 1706 2218 3071 3552 4033 120,3 481 17,18 Switzerland 1879 2579 3279 4670 5370 6070 175,0 700,0 25,00 Croatia 1157 1589 2021 2953 3385 3817 108 432 15,43
3.6 Allowances for interview(s) Place or country of destination Distance (KM) Amount (EUR) Travel and accommodation Daily subsistence allowance (DSA) Any EU-28 or Iceland and Norway 0-50 0 50/day (> 12 hours) 25/½ day (> 6 - 12 hours) Max 3 days > 50-250 100 > 250-500 250 > 500 350
3.7 Allowance to move to another Member State (work placement) Country of Destination Amount (EUR) Austria 1025 Belgium 970 Bulgaria 635 Croatia 675 Cyprus 835 Czechia 750 Denmark 1270 Estonia 750 Finland 1090 France 1045 Germany 940 Greece 910 Hungary 655 Iceland 945 Ireland 1015 Italy 995 Latvia 675 Lithuania 675 Luxembourg 970 Malta 825 Netherlands 950 Norway 1270 Poland 655 Portugal 825 Romania 635 Slovakia 740 Slovenia 825 Spain 890 Sweden 1090 United Kingdom 1060
3.8 Daily accommodation costs (in EUR) Student daily allowances Staff daily allowances Country Group Country (Day 1-day 14) (Day 15-Day 60) (Day 1-day 14) (Day 15-Day 60) Group A United Kingdom 90 63 128 90 Group B Denmark 86 60 128 90 Group C Netherlands 83 58 128 90 Sweden 83 58 128 90 Group D Cyprus 77 54 112 78 Finland 77 54 112 78 Luxembourg 77 54 112 78 Group E Austria 74 52 112 78 Belgium 74 52 112 78 Bulgaria 74 52 112 78 Czechia 74 52 112 78 Group F Greece 70 49 112 78 Hungary 70 49 112 78 Switzerland 70 49 112 78 Liechtenstein 70 49 112 78 Norway 70 49 112 78 Poland 70 49 112 78 Romania 70 49 112 78 Turkey 70 49 112 78 Group G Germany 67 47 96 67 Spain 67 47 96 67 Latvia 67 47 96 67 North Macedonia 67 47 96 67 Malta 67 47 96 67 Slovakia 67 47 96 67 Group H Croatia 58 41 80 56 Estonia 58 41 80 56 Lithuania 58 41 80 56 Slovenia 58 41 80 56 Group I France 80 56 112 78 Ireland 80 56 128 90 Iceland 80 56 112 78 Group L Portugal 64 45 96 67
ANNEX V
Pt_1_. 2. Professional development of employees in foreign language skills under Priority Axes 2, 3 and 4 of the Operational Programme Human Resources (2014SK05M0OP001) Pt_2_. 2. European Computer Driving Licence (ECDL certification under Priority Axes 1, 2 and 3 of Operational Programme Human Resources (2014SK05M0OP001) Pt_3_. 2. Inclusion in kindergartens, elementary and secondary schools under Priority Axis 1 Education and 5 Integration of marginalised Roma communities of Operational Programme Human Resources (2014SK05M0OP001) (4) Inclusion in kindergartens, elementary and secondary schools under Priority Axis 1 Education and 5 Integration of marginalised Roma communities of Operational Programme Human Resources (2014SK05M0OP001) (5) Integration of pupils in kindergartens and schools under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001) (6) Training of teaching and specialised staff under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001) (7) Training of prospective teachers of higher education facilities under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001) (8) Teaching clubs under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001) (9) Teaching of additional school classes under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001) Pt_1_. 3. One hour of teaching of an additional school class by a primary school teacher Pt_2_. 3. One hour of teaching of an additional school class by a secondary school teacher Pt_1_. 4. Number of hours of teaching of additional school classes by a primary school teacher Pt_2_. 4. Number of hours of teaching of additional school classes by a secondary school teacher Pt_1_. 5. 12,45 Pt_2_. 5. 13,20 Grp. 1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) 45-minute period of foreign language training per employee All eligible costs of the operation, including direct costs of providing training. Number of completed 45-minute periods of foreign language training per employee. 8,53 ECDL certification All eligible costs of the operation, including direct cost of sitting examination and issuing certificate Number of ECDL certificates awarded, differentiated by profile and module Certificate Name Price ECDL Profile - 1 Base/Standard exam 31,50 ECDL Profile - 2 Base/Standard exams 59,00 ECDL Profile - 3 Base/Standard exams 76,50 ECDL Profile - 4 Base/Standard exams 92,00 ECDL Profile - 5 Base/Standard exams 111,50 ECDL Profile - 6 Base/Standard exams 127,00 ECDL Profile - 7 Base/Standard exams 142,50 ECDL Profile - 8 Base/Standard exams 163,00 ECDL Profile - 1 Advanced exam 39,10 ECDL Profile - 2 Advanced exams 74,30 ECDL Profile - 3 Advanced exams 99,40 ECDL Profile - 4 Advanced exams 122,50 Occupation of newly created or existing ESF funded posts in inclusive teams Direct wage costs Indirect costs Number of months during which a newly created or existing ESF funded post in an inclusive team is occupied. School psychologist – 1353 per month Special pedagogue/social pedagogue – 1559 per month Occupation of newly created or existing ESF funded posts for pedagogical assistants Direct wage costs Indirect costs Number of months during which a newly created or existing ESF funded post for a pedagogical assistant is occupied 1115 per month Occupation of a newly created or existing ESF funded teacher’s assistant post Direct wage costs Indirect costs Number of months during which a newly created or existing ESF funded post of teachers assistant is occupied 1062 per month One hour of participation in training for teaching and specialised staff Direct wage costs of the trainer and wages of the participant. Indirect Costs Number of completed hours per participant in training for teaching and specialised staff Group of 20 participants: 10,10 per completed hour per participant Group of 12 participants: 10,65 per completed hour per participant. One hour of analysis by a training teacher of a student’s direct teaching activity unit (school class) or direct education activity (school facility). Direct wage costs. Materials and administrative costs. Number of hours of direct analysis by a training teacher of students’ direct teaching activity unit (school class) or direct education activity (school facility). 9,66 per hour One hour of participation by teaching staff in a teaching club Direct wage costs. Indirect costs. Number of hours of participation by teaching staff in a teaching club 11,20 Direct wage costs and indirect costs. Grp. 2. Adjustment of amounts The amount for unit cost 3 and 4 may be adjusted in order to reflect the change of salaries for school psychologists, special pedagogues and social pedagogues established at national level in accordance with law No 553/2003 on remuneration of some categories of employees carrying out with in public interest, its amendments and its implementing acts. The amount for unit cost 5 may be adjusted in line with changes to the normative allowance for teacher’s assistants established in accordance with §9a section 3 of Governmental Regulation (EC) No 630/2008 of the Slovak Republic, laying down the details of the breakdown of funds from the state budget for schools and school facilities. The amount for unit cost 7 may be adjusted in line with changes to the guidelines for allocation of subsidies from the state budget to public higher education institutions, in accordance with Act No 131/2002 on higher education institutions. The amount for unit costs 8 and 9 may be adjusted by replacing the initial direct wage costs in the calculation method that consists of direct wage costs and a flat rate for indirect costs. Adjustments will be based on change of salaries for primary and secondary school teachers established at national level in accordance with §28 section 1 of Act No 553/2003 on remuneration of some employees working in public interest.
ANNEX VII Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Slovakia
1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) 45-minute period of foreign language training per employee All eligible costs of the operation, including direct costs of providing training. Number of completed 45-minute periods of foreign language training per employee. 8,53 ECDL certification All eligible costs of the operation, including direct cost of sitting examination and issuing certificate Number of ECDL certificates awarded, differentiated by profile and module Certificate Name Price ECDL Profile - 1 Base/Standard exam 31,50 ECDL Profile - 2 Base/Standard exams 59,00 ECDL Profile - 3 Base/Standard exams 76,50 ECDL Profile - 4 Base/Standard exams 92,00 ECDL Profile - 5 Base/Standard exams 111,50 ECDL Profile - 6 Base/Standard exams 127,00 ECDL Profile - 7 Base/Standard exams 142,50 ECDL Profile - 8 Base/Standard exams 163,00 ECDL Profile - 1 Advanced exam 39,10 ECDL Profile - 2 Advanced exams 74,30 ECDL Profile - 3 Advanced exams 99,40 ECDL Profile - 4 Advanced exams 122,50 Occupation of newly created or existing ESF funded posts in inclusive teams Direct wage costs Indirect costs Number of months during which a newly created or existing ESF funded post in an inclusive team is occupied. School psychologist – 1353 per month Special pedagogue/social pedagogue – 1559 per month Occupation of newly created or existing ESF funded posts for pedagogical assistants Direct wage costs Indirect costs Number of months during which a newly created or existing ESF funded post for a pedagogical assistant is occupied 1115 per month Occupation of a newly created or existing ESF funded teacher’s assistant post Direct wage costs Indirect costs Number of months during which a newly created or existing ESF funded post of teachers assistant is occupied 1062 per month One hour of participation in training for teaching and specialised staff Direct wage costs of the trainer and wages of the participant. Indirect Costs Number of completed hours per participant in training for teaching and specialised staff Group of 20 participants: 10,10 per completed hour per participant Group of 12 participants: 10,65 per completed hour per participant. One hour of analysis by a training teacher of a student’s direct teaching activity unit (school class) or direct education activity (school facility). Direct wage costs. Materials and administrative costs. Number of hours of direct analysis by a training teacher of students’ direct teaching activity unit (school class) or direct education activity (school facility). 9,66 per hour One hour of participation by teaching staff in a teaching club Direct wage costs. Indirect costs. Number of hours of participation by teaching staff in a teaching club 11,20 Direct wage costs and indirect costs. Pt_1_. 2. Professional development of employees in foreign language skills under Priority Axes 2, 3 and 4 of the Operational Programme Human Resources (2014SK05M0OP001) Pt_2_. 2. European Computer Driving Licence (ECDL certification under Priority Axes 1, 2 and 3 of Operational Programme Human Resources (2014SK05M0OP001) Pt_3_. 2. Inclusion in kindergartens, elementary and secondary schools under Priority Axis 1 Education and 5 Integration of marginalised Roma communities of Operational Programme Human Resources (2014SK05M0OP001) (4) Inclusion in kindergartens, elementary and secondary schools under Priority Axis 1 Education and 5 Integration of marginalised Roma communities of Operational Programme Human Resources (2014SK05M0OP001) (5) Integration of pupils in kindergartens and schools under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001) (6) Training of teaching and specialised staff under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001) (7) Training of prospective teachers of higher education facilities under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001) (8) Teaching clubs under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001) (9) Teaching of additional school classes under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001) Pt_1_. 3. One hour of teaching of an additional school class by a primary school teacher Pt_2_. 3. One hour of teaching of an additional school class by a secondary school teacher Pt_1_. 4. Number of hours of teaching of additional school classes by a primary school teacher Pt_2_. 4. Number of hours of teaching of additional school classes by a secondary school teacher Pt_1_. 5. 12,45 Pt_2_. 5. 13,20
1.
1. Professional development of employees in foreign language skills under Priority Axes 2, 3 and 4 of the Operational Programme Human Resources (2014SK05M0OP001)
2. European Computer Driving Licence (ECDL certification under Priority Axes 1, 2 and 3 of Operational Programme Human Resources (2014SK05M0OP001)
3. Inclusion in kindergartens, elementary and secondary schools under Priority Axis 1 Education and 5 Integration of marginalised Roma communities of Operational Programme Human Resources (2014SK05M0OP001)
4. Inclusion in kindergartens, elementary and secondary schools under Priority Axis 1 Education and 5 Integration of marginalised Roma communities of Operational Programme Human Resources (2014SK05M0OP001)
5. Integration of pupils in kindergartens and schools under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001)
6. Training of teaching and specialised staff under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001)
7. Training of prospective teachers of higher education facilities under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001)
8. Teaching clubs under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001)
9. Teaching of additional school classes under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001)
1. One hour of teaching of an additional school class by a primary school teacher
2. One hour of teaching of an additional school class by a secondary school teacher
1. Number of hours of teaching of additional school classes by a primary school teacher
2. Number of hours of teaching of additional school classes by a secondary school teacher
1. 12,45
2. 13,20
2. Adjustment of amounts The amount for unit cost 3 and 4 may be adjusted in order to reflect the change of salaries for school psychologists, special pedagogues and social pedagogues established at national level in accordance with law No 553/2003 on remuneration of some categories of employees carrying out with in public interest, its amendments and its implementing acts. The amount for unit cost 5 may be adjusted in line with changes to the normative allowance for teacher’s assistants established in accordance with §9a section 3 of Governmental Regulation (EC) No 630/2008 of the Slovak Republic, laying down the details of the breakdown of funds from the state budget for schools and school facilities. The amount for unit cost 7 may be adjusted in line with changes to the guidelines for allocation of subsidies from the state budget to public higher education institutions, in accordance with Act No 131/2002 on higher education institutions. The amount for unit costs 8 and 9 may be adjusted by replacing the initial direct wage costs in the calculation method that consists of direct wage costs and a flat rate for indirect costs. Adjustments will be based on change of salaries for primary and secondary school teachers established at national level in accordance with §28 section 1 of Act No 553/2003 on remuneration of some employees working in public interest.
ANNEX VI
(1) Reintegration activities for detainees in the sector Prison Services Priority Axis 1 OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion (2) Reintegration activities for detainees in forensic care (Forzo) Priority Axis 1 OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion (3) Reintegration activities for juvenile offenders and youth in institutions placed under supervision based on a court judgment under civil law Priority Axis 1 OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion (4) Job coach activities for Young Disabled Persons OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion (5) Operations promoting and improving the connection between PrO and VSO students and the labour market or further vocational education. OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion Grp. 1. Definition of standard scales of unit costs Type of operations Indicators name Category of costs Measurement unit for the indicators Amounts (in EUR) Calendar days of participation of a detainee during the period of intervention, in the sector Prison Services (GW). All eligible costs (personnel costs, other direct and indirect costs). Number of calendar days of participation of a detainee in the period of intervention 14,50 Calendar days of participation of a detainee during the period of intervention in the sector forensic care (Forzo) All eligible costs (personnel costs, other direct and indirect costs). Number of calendar days of participation of a detainee in the period of intervention. 21,00 Calendar days of participation of a juvenile offender and a young person during the period of intervention in the sector Juvenile offenders and youth in custodial institutions under civil law (JI) All eligible costs (personnel costs, other direct and indirect costs). Number of calendar days of participation of a juvenile offender and a young person in the period of intervention. 26,50 Provision of job coach activities for Young Disabled Persons who receive benefits from the Employee Insurance Agency (UWV to secure and maintain paid employment in the open labour market) All eligible costs. Number of hours of jobcoaching assigned to a participant. 55,05 Provision of additional labour market guidance to students enrolled in a PrO or VSO school. All eligible costs of the operation. Number of PrO or VSO students per school year receiving additional labour market guidance. 1720,00 Grp. 2. Adjustment of amounts The amounts of unit costs set out for types of operation 1-3 and 5 will be adjusted yearly in line with the Dutch consumer price index (CPI): https://www.cbs.nl/nl-nl/conversie/uitgelicht/de-consumentenprijsindex. Index figures can be found on CBS Statline. The first indexation for types of operations 1-3 will be calculated in 2017, for types of operation 5 in 2020. The baseline year for the amounts of unit costs set out in this annex is 2015. (CPI 2015 = 100). Every year (N), as from 2017, the amounts will be indexed by applying the CPI of the year N-1 with the year 2015 as baseline. The following formula will be used for calculating the amounts of unit costs to be applied in a given year: Unit cost amounts in year N = Unit cost amounts included in this annex * CPI in year N-1 (with baseline 2015 = 100)/100 The amounts of unit costs set out for types of operation unit cost 4 will be adjusted when the rules and regulations about job coaching change according to the Dutch law. The set percentage of 60 % which forms the basisin the calculation of the hourly amount, to take into account that the assigned number of hours are not always used, will be recalculated every two 2 years in the same way the present calculations have been made with baseline year 2018. If the average differs more than 2 percent of the total number of hours the new percentage will be applied as the new average. Grp. 3. Definition of lump sum Type of operations Indicator name Category of costs Measurement unit for the indicator Amounts (in EUR) Technical Assistance Priority axis 4 2014NL05SFOP001 New total expenditure included in a payment application (i.e. total eligible expenditure included in a payment application which has not yet been taken into account for calculating an installment of EUR 100000). All elgible costs. Installments of EUR 100000 of new total expenditure included in a payment application submitted to the European Commission until the maximum amount budgeted under the technical assistance priority axis is reached. 5690 Grp. 4. Adjustments of amounts Not applicable.
ANNEX IX Conditions for reimbursement of expenditure on the basis of unit costs and lump sums to the Netherlands
1. Definition of standard scales of unit costs Type of operations Indicators name Category of costs Measurement unit for the indicators Amounts (in EUR) Calendar days of participation of a detainee during the period of intervention, in the sector Prison Services (GW). All eligible costs (personnel costs, other direct and indirect costs). Number of calendar days of participation of a detainee in the period of intervention 14,50 Calendar days of participation of a detainee during the period of intervention in the sector forensic care (Forzo) All eligible costs (personnel costs, other direct and indirect costs). Number of calendar days of participation of a detainee in the period of intervention. 21,00 Calendar days of participation of a juvenile offender and a young person during the period of intervention in the sector Juvenile offenders and youth in custodial institutions under civil law (JI) All eligible costs (personnel costs, other direct and indirect costs). Number of calendar days of participation of a juvenile offender and a young person in the period of intervention. 26,50 Provision of job coach activities for Young Disabled Persons who receive benefits from the Employee Insurance Agency (UWV to secure and maintain paid employment in the open labour market) All eligible costs. Number of hours of jobcoaching assigned to a participant. 55,05 Provision of additional labour market guidance to students enrolled in a PrO or VSO school. All eligible costs of the operation. Number of PrO or VSO students per school year receiving additional labour market guidance. 1720,00 (1) Reintegration activities for detainees in the sector Prison Services Priority Axis 1 OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion (2) Reintegration activities for detainees in forensic care (Forzo) Priority Axis 1 OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion (3) Reintegration activities for juvenile offenders and youth in institutions placed under supervision based on a court judgment under civil law Priority Axis 1 OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion (4) Job coach activities for Young Disabled Persons OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion (5) Operations promoting and improving the connection between PrO and VSO students and the labour market or further vocational education. OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion
1.
1. Reintegration activities for detainees in the sector Prison Services Priority Axis 1 OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion
2. Reintegration activities for detainees in forensic care (Forzo) Priority Axis 1 OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion
3. Reintegration activities for juvenile offenders and youth in institutions placed under supervision based on a court judgment under civil law Priority Axis 1 OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion
4. Job coach activities for Young Disabled Persons OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion
5. Operations promoting and improving the connection between PrO and VSO students and the labour market or further vocational education. OP 2014NL05SFOP001 Investment priority: 9i — Active inclusion
2. Adjustment of amounts The amounts of unit costs set out for types of operation 1-3 and 5 will be adjusted yearly in line with the Dutch consumer price index (CPI): https://www.cbs.nl/nl-nl/conversie/uitgelicht/de-consumentenprijsindex. Index figures can be found on CBS Statline. The first indexation for types of operations 1-3 will be calculated in 2017, for types of operation 5 in 2020. The baseline year for the amounts of unit costs set out in this annex is 2015. (CPI 2015 = 100). Every year (N), as from 2017, the amounts will be indexed by applying the CPI of the year N-1 with the year 2015 as baseline. The following formula will be used for calculating the amounts of unit costs to be applied in a given year: Unit cost amounts in year N = Unit cost amounts included in this annex * CPI in year N-1 (with baseline 2015 = 100)/100 The amounts of unit costs set out for types of operation unit cost 4 will be adjusted when the rules and regulations about job coaching change according to the Dutch law. The set percentage of 60 % which forms the basisin the calculation of the hourly amount, to take into account that the assigned number of hours are not always used, will be recalculated every two 2 years in the same way the present calculations have been made with baseline year 2018. If the average differs more than 2 percent of the total number of hours the new percentage will be applied as the new average.
3. Definition of lump sum Type of operations Indicator name Category of costs Measurement unit for the indicator Amounts (in EUR) Technical Assistance Priority axis 4 2014NL05SFOP001 New total expenditure included in a payment application (i.e. total eligible expenditure included in a payment application which has not yet been taken into account for calculating an installment of EUR 100000). All elgible costs. Installments of EUR 100000 of new total expenditure included in a payment application submitted to the European Commission until the maximum amount budgeted under the technical assistance priority axis is reached. 5690
4. Adjustments of amounts Not applicable.
ANNEX VII
(1) Subsidies paid to employers for hiring specified categories of workers under Priority Axes 1. 2. 3. 4 and 5 of the Human Capital Operational Programme (2014RO05M9OP001) (2) Vocational training under priority axes 1, 2, 3, 4, 5 and 6 of the Human Capital Operational Programme (2014RO05M9OP001). (a) 1324 per month for level 2 qualification (b) 2224 per month for level 3 qualification (c) 4101 per month for level 4 qualification (3) Financial support for employers that employ persons in an apprenticeship program under priority axes 1, 2 and 3 of the Human Capital Operational Programme (2014RO05M9OP001). (7) 12 months — for qualification level 2 (8) 24 months — for qualification level 3 (9) 36 months — for qualification level 4 (4) Financial support for employers that employ persons in an internship program under priority axes 1, 2 and 3 of the Human Capital Operational Programme (2014RO05M9OP001). (5) Provision of meals for children in crèches Priority Axis 6 Education and competencies of the Human Capital Operational Programme (2014RO05M9OP001). Grp. 1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in LEI) Monthly subsidy paid to an employer for each person employed on an open-ended contract. All costs related to the employment subsidy Number of months in employment 900 per month for up to 12 months for every employer who hires on an open ended contract for a minimum period of 18 months a graduate of an education institution. an unemployed over 45 years old. a long term unemployed. a young NEET. unemployed who are single parents of mono-parental families 900 lei/month for up to 18 months paid for every employer who hires a person with disabilities (except those hired under legal obligation) on an open ended contract for a minimum period of 18 months. 900 lei/month for up to 5 years for employers who hire with full-time contracts unemployed persons who within 5 years from the date of employment fulfil the conditions for requiring partial early retirement pension or old age pension A participant obtaining a professional qualification (level 2,3 or 4). All costs related to the training — including indirect costs — excluding participant related costs, such us transportation, accommodation, meals, subsidies, as well as the project management costs. Number of month per person obtaining a professional qualification certificate (level 2, 3 or 4) Monthly financial support paid to an employer for each person enrolled in a paid apprenticeship. All costs related to the apprentiship subsidy Number of months in employment 1125 per month per apprentice for a maximum period of: Monthly financial support paid to an employer for each person with tertiary education enrolled in an internship programme All costs related to the internship subsidy Number of months in employment 1350 per month per tertiary education intern for a maximum period of 6 months. Daily meal cost for a child (0-3y) in early childhood care services for which a EU-level unit cost has been paid All costs related to the provision of daily meals. Number of days of crèche service (care services) per supported child (0-3 years old) 12 per child per day Grp. 2. Adjustment of amounts The amounts for unit cost 1 may be adjusted by any amendment of the rates set out by law no. 76/2002 on the unemployment insurance system and employment stimulation. Such changes will take effect on the same date as the revisions to the above-mentioned law come into force. The amout for unit cost 2 will be changed automatically taking into account the inflation rate for each year based on the RO National Statistical Institute inflation index. For example, the rate may be adjusted on 1 January each year, following the adoption of the present document, by multiplying the RO National Institute for Statistics rate of inflation for Romania, where the rate for 2015 should be taken as a baseline of 100. The amounts for unit costs 3 and 4 may be adjusted by any amendment of the rates set out by law no. 76/2002 on the unemployment insurance system and employment stimulation, including its subsequent amendments and law no. 279/2005 regarding apprenticeship programmes at the work place, including its subsequent amendments, and law no. 335/2013 regarding internships programme for higher education graduates, including its subsequent amendments, such changes will take effect on the same date as the revisions to the above-mentioned law come into force. Changes in the total value of the unit costs set out here above will not apply to already announced calls. The amounts for unit cost 5 may be adjusted in line with changes in the Government Decision (GD) no 904/2014 for establishing thresholds for expenses related to the rights provided by the art 129 (1) of Law no 272/2004 on protection and promotion of child`s rights. Such changes will take effect on the same date as the revisions to the above-mentioned law come into force.
ANNEX XIII Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Romania
1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in LEI) Monthly subsidy paid to an employer for each person employed on an open-ended contract. All costs related to the employment subsidy Number of months in employment 900 per month for up to 12 months for every employer who hires on an open ended contract for a minimum period of 18 months a graduate of an education institution. an unemployed over 45 years old. a long term unemployed. a young NEET. unemployed who are single parents of mono-parental families 900 lei/month for up to 18 months paid for every employer who hires a person with disabilities (except those hired under legal obligation) on an open ended contract for a minimum period of 18 months. 900 lei/month for up to 5 years for employers who hire with full-time contracts unemployed persons who within 5 years from the date of employment fulfil the conditions for requiring partial early retirement pension or old age pension A participant obtaining a professional qualification (level 2,3 or 4). All costs related to the training — including indirect costs — excluding participant related costs, such us transportation, accommodation, meals, subsidies, as well as the project management costs. Number of month per person obtaining a professional qualification certificate (level 2, 3 or 4) Monthly financial support paid to an employer for each person enrolled in a paid apprenticeship. All costs related to the apprentiship subsidy Number of months in employment 1125 per month per apprentice for a maximum period of: Monthly financial support paid to an employer for each person with tertiary education enrolled in an internship programme All costs related to the internship subsidy Number of months in employment 1350 per month per tertiary education intern for a maximum period of 6 months. Daily meal cost for a child (0-3y) in early childhood care services for which a EU-level unit cost has been paid All costs related to the provision of daily meals. Number of days of crèche service (care services) per supported child (0-3 years old) 12 per child per day (1) Subsidies paid to employers for hiring specified categories of workers under Priority Axes 1. 2. 3. 4 and 5 of the Human Capital Operational Programme (2014RO05M9OP001) (2) Vocational training under priority axes 1, 2, 3, 4, 5 and 6 of the Human Capital Operational Programme (2014RO05M9OP001). (a) 1324 per month for level 2 qualification (b) 2224 per month for level 3 qualification (c) 4101 per month for level 4 qualification (3) Financial support for employers that employ persons in an apprenticeship program under priority axes 1, 2 and 3 of the Human Capital Operational Programme (2014RO05M9OP001). (7) 12 months — for qualification level 2 (8) 24 months — for qualification level 3 (9) 36 months — for qualification level 4 (4) Financial support for employers that employ persons in an internship program under priority axes 1, 2 and 3 of the Human Capital Operational Programme (2014RO05M9OP001). (5) Provision of meals for children in crèches Priority Axis 6 Education and competencies of the Human Capital Operational Programme (2014RO05M9OP001).
1.
1. Subsidies paid to employers for hiring specified categories of workers under Priority Axes 1. 2. 3. 4 and 5 of the Human Capital Operational Programme (2014RO05M9OP001)
2. Vocational training under priority axes 1, 2, 3, 4, 5 and 6 of the Human Capital Operational Programme (2014RO05M9OP001).
a)
1324 per month for level 2 qualification
b)
2224 per month for level 3 qualification
c)
4101 per month for level 4 qualification
3. Financial support for employers that employ persons in an apprenticeship program under priority axes 1, 2 and 3 of the Human Capital Operational Programme (2014RO05M9OP001).
12 months — for qualification level 2
24 months — for qualification level 3
36 months — for qualification level 4
4. Financial support for employers that employ persons in an internship program under priority axes 1, 2 and 3 of the Human Capital Operational Programme (2014RO05M9OP001).
5. Provision of meals for children in crèches Priority Axis 6 Education and competencies of the Human Capital Operational Programme (2014RO05M9OP001).
2. Adjustment of amounts The amounts for unit cost 1 may be adjusted by any amendment of the rates set out by law no. 76/2002 on the unemployment insurance system and employment stimulation. Such changes will take effect on the same date as the revisions to the above-mentioned law come into force. The amout for unit cost 2 will be changed automatically taking into account the inflation rate for each year based on the RO National Statistical Institute inflation index. For example, the rate may be adjusted on 1 January each year, following the adoption of the present document, by multiplying the RO National Institute for Statistics rate of inflation for Romania, where the rate for 2015 should be taken as a baseline of 100. The amounts for unit costs 3 and 4 may be adjusted by any amendment of the rates set out by law no. 76/2002 on the unemployment insurance system and employment stimulation, including its subsequent amendments and law no. 279/2005 regarding apprenticeship programmes at the work place, including its subsequent amendments, and law no. 335/2013 regarding internships programme for higher education graduates, including its subsequent amendments, such changes will take effect on the same date as the revisions to the above-mentioned law come into force. Changes in the total value of the unit costs set out here above will not apply to already announced calls. The amounts for unit cost 5 may be adjusted in line with changes in the Government Decision (GD) no 904/2014 for establishing thresholds for expenses related to the rights provided by the art 129 (1) of Law no 272/2004 on protection and promotion of child`s rights. Such changes will take effect on the same date as the revisions to the above-mentioned law come into force.
ANNEX VIII
(1) Formal education operations (from early childhood education to tertiary level including formal vocational education) in all ESF operational programmes. (2) Any operations concerning training of registered unemployed, job-seekers or inactive people, except types of operations for which other simplified cost options have been established in another annex to this Delegated Regulation. (3) the amounts mentioned in point 3.2 shall be multiplied by the index for the relevant regional Operational Programme mentioned in point 3.3; (4) where operational programmes cover more than one region, the amount to be reimbursed shall be in acordance with the region in which the operation or project is implemented The method used to calculate these amounts requires that where these amounts are claimed for a type of operation under an Operational Programme, the same amount is claimed for all similar types of operations under the same Operational Programme. Pt_3_. 2. Any operations concerning the provision of employment-related counselling services to registered unemployed, job-seekers or inactive people, except types of operations for which other simplified cost options have been established in another annex to this Delegated Regulation. Pt_1_. 2. Hourly rate for provision of counselling services Pt_2_. 2. Monthly rate for provision of counselling services Pt_3_. 3. Annual rate for provision of counselling services Pt_1_. 3. Number of hours of counselling services provided Pt_2_. 3. Number of months of counselling services provided Pt_3_. 4. Number of years of counselling services provided (12) the amounts mentioned in points 3.2 shall be multiplied by the index for the relevant regional Operational Programme mentioned in point 3.3; (13) where operational programmes cover more than one region, the amount to be reimbursed shall be in acordance with the region in which the operation or project is implemented. The method used to calculate these amounts requires that where these amounts are claimed for a type of operation under an Operational Programme, the same amount is claimed for all similar types of operations under the same Operational Programme. Pt_4_. 2. Any operations concerning the provision of training to employed persons, except types of operations for which other simplified cost options have been established in another annex to this Delegated Regulation. Pt_1_. 4. Hourly rate of training provided to employed persons Pt_2_. 4. Hourly rate of salary paid to an employee while on a training course. Pt_1_. 5. Number of completed hours of training to employed persons per participant. Pt_2_. 5. Number of hours of salary paid to employees while on a training course. (19) the amounts mentioned in point 3.2 shall be multiplied by the index for the relevant regional Operational Programme mentioned in point 3.3; (20) where operational programmes cover more than one region, the amount to be reimbursed shall be in acordance with the region in which the operation or project is implemented. The method used to calculate these amounts requires that where these amounts are claimed for a type of operation under an Operational Programme, the same amount is claimed for all similar types of operations under the same Operational Programme. Grp. 1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Participants in an academic year of formal education. All eligible costs directly related to providing core goods and services of education. Number of participants with verified attendance in an academic year of formal education, differentiated by ISCED classification. See point 3.1 The amounts are for full-time participation in an academic year. In case of part-time participation the amount shall be established on the basis of a pro rata reflecting the participation of the student. In case the course lasts less than one academic year, the amount shall be established on the basis of a pro rata reflecting the duration of the course. For vocational and educational training (upper secondary level and non-tertiary post-secondary level), in case of courses with a reduced share of time spent in a formal education institute as compared to the courses reported for data collection during the reference year, the amount shall be proportionally reduced reflecting the time spent in the education institute. Participants who have successfully completed a training course. All eligible costs of the operation. Number of participants who have successfully completed a training course. See point 3.2.1 For those Member States listed in point 3.3: All eligible costs of the operation, except allowances paid to participants See points 3.2.2, 3.2.3 and 3.2.4 below For those Member States listed in point 3.3: All eligible costs of the operation. Where the salary of the employee while on a training course is not an eligible cost, only unit cost 1 shall be reimbursed. Where the salary of the employee while on training is considered as an eligible cost, the combined amount from unit costs 1 and 2 may be reimbursed. See points 3.2.5 and 3.2.6 below For those Member States listed in point 3.3: Grp. 2. Adjustment of Amounts. N/A Grp. 31. Amounts per participation in formal education (in EUR) AT BE BG CY CZ DE EE EL ES FI* FR HU HR* Early childhood education ED0 6794 n/a 1492 2078 2059 6308 3023 n/a 3451 8740 5495 2451* 2198 Early childhood educational development ED01 6874 n/a n/a 397 n/a 10100 n/a n/a 3075 14701 n/a 2457 n/a Pre-primary education ED02 6778 6284 1492 2544 2059 6308 n/a 2976 3577 7355 5495 n/a 2716 Primary education ED1 8851 7938 963 6898 2205 6476 3339 3198 4035 7387 5031 1772 4592 Primary and lower secondary education (levels 1 and 2) ED1_2 10411 8579 1072 7301 2804 7398 3401 3371 4410 8827 5905 1708 2181 Lower secondary education ED2 11981 10015 1203 7860 3680 8011 3538 3972 5066 11756 6977 1643 n/a Lower secondary education — general ED24 11981 n/a 1232 8138 3687 8011 3358 3728 5135 11756 7026 1612 n/a Lower secondary education — vocational ED25 n/a n/a n/a n/a 2240 n/a 3581 n/a n/a n/a n/a 5086 n/a Upper secondary education ED3 11596 10328 1085 8406 3414 8085 3348 3578 5660* 6980 9256 2708 1995 Upper secondary and post-secondary non-tertiary education (levels 3 and 4) ED3_4 10912 10328 1089 8406 3331 7193 3591 3015 5660 7644 9166 3024 1995 Upper secondary education — general ED34 9982 10033 1012 7842 3065 8358 3221 2997 4899 7140 9033 2314 n/a Upper secondary and post-secondary non-tertiary education – general (levels 34 and 44) ED34_44 9982 10033 1012 7847 2844 8286 3221 2997 4899 7140 9029 2314 n/a Upper secondary education — vocational ED35 12699 10535 1159 11057* 3538 7808 3536 5108 7318 6921 9658 4011 2826 Upper secondary and post-secondary non-tertiary education – vocational (levels 35 and 45) ED35_45 11477 10535 1166 11057 3521 6428 3978 3041 7318 7921 9424 3922 2826 Post-secondary non-tertiary education ED4 1573 n/a 2318 n/a 733 3895 5035 443 n/a n/a 5829 5057 n/a Post-secondary non-tertiary education ED44 n/a n/a n/a n/a 717 6670 n/a n/a n/a n/a 6667 n/a n/a Post-secondary non-tertiary education — vocational ED45 1573 n/a 2318 n/a 829 3737 5035 443 n/a n/a 5648 5057 n/a Short cycle tertiary education ED5 13152 9808 n/a 682 8132 6648 n/a n/a 5061 8850 8883 818 n/a Tertiary education (levels 5-8) ED5-8 9676 7990 935 3507 1986 5981 4036 927 3565 9235 6400 1645 3258 Tertiary education excluding short-cycle tertiary education (levels 6-8) ED6-8 9027 7923 3832 3894 1970 5981 4036 927 3197 9235 5632 1678* n/a IE* IT LV LT LU MT NL* PL PT RO SI SK SE UK* Early childhood education ED0 4957 3709 2622 2272 17392 4138 6153 1954 2689 1009 3827* 2189 13741* 4536 Early childhood educational development ED01 n/a n/a n/a 2184 n/a n/a n/a n/a n/a 1929 4733* n/a 15638* 2712 Pre-primary education ED02 4957 3709 2622 2290 17392 4138 6153 1954 2689 977 3458* 2189 13074* 4863 Primary education ED1 6523 5428 3062 2539 17433 4080 6861 2491 3828 701 4612* 2733 9609 8949 Primary and lower secondary education (levels 1 and 2) ED1_2 6767 5669 3070 2426 17119 5168 8070 2536 4262 983 4509 2625 9780 8550 Lower secondary education ED2 7467 6056 3250 3086 16595 7325 9831 2636 5001 1326 4274* 2522 9780 7819 Lower secondary education — general ED24 7467 5752 3285 2298 16595 7341 8523 2636 n/a 1326 4274* 2478 n/a 7713 Lower secondary education — vocational ED25 n/a 5762 3488 2044 n/a 4946 13302 n/a n/a n/a n/a 4155 n/a 8295 Upper secondary education ED3 7621 5950 3254 2309 15618 4954 7581 2468* 4475* 1367 3354 2554 10200 8162 Upper secondary and post-secondary non-tertiary education (levels 3 and 4) ED3_4 6394 5995* 3271 2281 15212 5001 7581 2319 4475 1260 3354 2570 10016 8162 Upper secondary education — general ED34 7621 5950 3234 2347 13391 4751 7892 2137 n/a 3084 3923* 2134 9245 8170 Upper secondary and post-secondary non-tertiary education — general (levels 34 and 44) ED34_44 7621 n/a 3234 2347 13391 4761 7892 2137 n/a 3084 3923* 2314 9131 8170 Upper secondary education — vocational ED35 n/a n/a 3285 2208 17031 6190 7422 2727* n/a 75 3727* 2789 11794* 8151 Upper secondary and post-secondary non-tertiary education — vocational (levels 35 and 45) ED35_45 3760 n/a 3317 2197 16315 5653 7422 2441* n/a 152 3727* 2798 10854 8515 Post-secondary non-tertiary education ED4 3760 n/a 3484 2186 1417 5263 5056 708 n/a 475 n/a 2930 5436* n/a Post-secondary non-tertiary education ED44 n/a n/a n/a n/a n/a 6178 n/a n/a n/a n/a n/a n/a 8954 n/a Post-secondary non-tertiary education — vocational ED45 3760 n/a 3484 2186 1417 5232 5056 708 n/a 475 n/a 2930 4592 n/a Short cycle tertiary education ED5 n/a 2713 2978 n/a 20512 6463 6358 9627 n/a n/a 1339* 2726 6392 637 Tertiary education (levels 5-8) ED5-8 5084 2334 1741 1631 26940 8994 6320 2287 1948* 1894 4638 2223 10410 2471 Tertiary education excluding short-cycle tertiary education (levels 6-8) ED6-8 6562 2332 1539 1631 27664 9450 6320 2285 1948* 1894 4638* 2223 10410 2471 Grp. 32. Amounts for training for the employed and unemployed, and employment services (in EUR) 3.2.1 Amount per participant demonstrating successful completion of a training course 3.2.2 Hourly rate for provision of employment services 3.2.3 Monthly rate for provision of employment services 3.2.4 Annual amount for provision of employment services 3.2.5 Hourly rate for training of employed persons 3.2.6 Hourly rate for salary of employed person Austria 2277 39 6723 80672 33,98 26,03 Belgium 3351 42 7010 84112 22,97 31,08 Bulgaria 596 3 543 6511 5,14 1,76 Cyprus 2696 29 5467 65604 18,85 10,94 Czechia 521 11 1988 23864 9,29 7,39 Germany 6959 42 7582 90992 36,03 23,11 Denmark 5803 55 9496 113956 39,67 32,02 Estonia 711 14 2498 29968 14,03 8,22 Greece 2064 21 3685 44222 17,72 11,56 Spain 2772 20 3508 42095 17,58 18,30 Finland 5885 45 7683 92204 38,39 27,69 France 6274 48 7297 87556 35,99 25,26 Croatia 689 10 1620 1 9440 10,52 5,90 Hungary 1818 10 1816 21790 15,67 5,02 Ireland 11119 36 6411 76920 31,79 27,20 Italy 3676 31 5438 65247 27,42 22,20 Lithuania 1359 8 1574 18878 7,43 3,71 Luxembourg 19302 34 5908 70890 29,87 23,30 Latvia 756 8 1385 16607 7,94 7,21 Malta 2256 13 2184 26212 16,49 8,41 Netherlands 5018 36 6474 77680 32,01 23,33 Poland 594 6 1051 12611 11,21 4,47 Portugal 994 21 3648 43784 8,33 10,63 Romania 583 8 1555 18656 0,27 2,56 Sweden 7303 48 8369 100430 58,02 32,67 Slovenia 854 22 4015 48185 18,90 7,61 Slovakia 424 7 1117 13411 11,13 12,52 United Kingdom 5863 25 4690 56286 36,07 15,16 Grp. 33. Index to be applied for the amounts for stated regional operations programmes. Belgium 1,00 France 1,00 Brussels Capital 1,26 Île de France 1,32 Flanders 0,97 Champagne-Ardenne 0,88 Wallonia 0,91 Picardie 0,91 Haute-Normandie 0,96 Germany 1,00 Centre 0,89 Baden-Württemberg 1,08 Basse-Normandie 0,86 Bayern 1,05 Bourgogne 0,87 Berlin 0,98 Nord — Pas-de-Calais 0,95 Brandenburg 0,82 Lorraine 0,90 Bremen 1,06 Alsace 0,97 Hamburg 1,21 Franche-Comté 0,89 Hessen 1,12 Pays de la Loire 0,90 Mecklenburg-Vorpommern 0,79 Bretagne 0,86 Niedersachsen 0,93 Poitou-Charentes 0,83 Nordrhein-Westfalen 1,02 Aquitaine 0,87 Rheinland-Pfalz 0,96 Midi-Pyrénées 0,91 Saarland 0,98 Limousin 0,84 Sachsen 0,81 Rhône-Alpes 0,97 Sachsen-Anhalt 0,82 Auvergne 0,86 Schleswig-Holstein 0,87 Languedoc-Roussillon 0,84 Thüringen 0,82 Provence-Alpes-Côte d’Azur 0,93 Corse 0,93 Greece 1,00 Guadeloupe 1,01 Anatoliki Makedonia, Thraki 0,81 Martinique 0,90 Kentriki Makedonia 0,88 Guyane 0,99 Dytiki Makedonia 1,12 La Réunion 0,83 Ipeiros 0,79 Mayotte 0,64 Thessalia 0,83 Ionia Nisia 0,82 Italy 1,00 Dytiki Ellada 0,81 Piemonte 1,04 Sterea Ellada 0,90 Valle d’Aosta 1,00 Peloponnisos 0,79 Liguria 1,01 Attiki 1,23 Lombardia 1,16 Voreio Aigaio 0,90 Provincia Autonoma di Bolzano/Bozen 1,15 Notio Aigaio 0,97 Provincia Autonoma di Trento 1,04 Kriti 0,83 Veneto 1,03 Friuli-Venezia Giulia 1,08 Spain 1,00 Emilia-Romagna 1,06 Galicia 0,88 Toscana 0,95 Principado de Asturias 0,98 Umbria 0,87 Cantabria 0,96 Marche 0,90 País Vasco 1,17 Lazio 1,07 Comunidad Foral de Navarra 1,07 Abruzzo 0,89 La Rioja 0,92 Molise 0,82 Aragón 0,98 Campania 0,84 Comunidad de Madrid 1,18 Puglia 0,82 Castilla y León 0,91 Basilicata 0,86 Castilla-la Mancha 0,88 Calabria 0,75 Extremadura 0,84 Sicilia 0,86 Cataluña 1,09 Sardegna 0,84 Comunidad Valenciana 0,91 Illes Balears 0,96 Portugal 1,00 Andalucía 0,87 Norte 0,86 Región de Murcia 0,84 Algarve 0,87 Ciudad Autónoma de Ceuta 1,07 Centro 0,84 Ciudad Autónoma de Melilla 1,04 Área Metropolitana de Lisboa 1,33 Canarias 0,91 Alentejo 0,91 Região Autónoma dos Açores 0,91 Poland 1,00 Região Autónoma da Madeira 0,95 Lódzkie 0,75 Mazowieckie 1,26 United Kingdom 1,00 Malopolskie 1,05 England 1,01 Slaskie 1,19 Wales 0,83 Lubelskie 0,60 Scotland 0,99 Podkarpackie 0,81 Northern Ireland 0,83 Swietokrzyskie 0,63 Podlaskie 0,73 Wielkopolskie 1,16 Zachodniopomorskie 1,06 Lubuskie 0,88 Dolnoslaskie 1,22 Kujawsko-Pomorskie 0,91 Warminsko-Mazurskie 0,83 Pomorskie 0,78
ANNEX XIV Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to all Member States specified.
1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Participants in an academic year of formal education. All eligible costs directly related to providing core goods and services of education. Number of participants with verified attendance in an academic year of formal education, differentiated by ISCED classification. See point 3.1 The amounts are for full-time participation in an academic year. In case of part-time participation the amount shall be established on the basis of a pro rata reflecting the participation of the student. In case the course lasts less than one academic year, the amount shall be established on the basis of a pro rata reflecting the duration of the course. For vocational and educational training (upper secondary level and non-tertiary post-secondary level), in case of courses with a reduced share of time spent in a formal education institute as compared to the courses reported for data collection during the reference year, the amount shall be proportionally reduced reflecting the time spent in the education institute. Participants who have successfully completed a training course. All eligible costs of the operation. Number of participants who have successfully completed a training course. See point 3.2.1 For those Member States listed in point 3.3: All eligible costs of the operation, except allowances paid to participants See points 3.2.2, 3.2.3 and 3.2.4 below For those Member States listed in point 3.3: All eligible costs of the operation. Where the salary of the employee while on a training course is not an eligible cost, only unit cost 1 shall be reimbursed. Where the salary of the employee while on training is considered as an eligible cost, the combined amount from unit costs 1 and 2 may be reimbursed. See points 3.2.5 and 3.2.6 below For those Member States listed in point 3.3: (1) Formal education operations (from early childhood education to tertiary level including formal vocational education) in all ESF operational programmes. (2) Any operations concerning training of registered unemployed, job-seekers or inactive people, except types of operations for which other simplified cost options have been established in another annex to this Delegated Regulation. (3) the amounts mentioned in point 3.2 shall be multiplied by the index for the relevant regional Operational Programme mentioned in point 3.3; (4) where operational programmes cover more than one region, the amount to be reimbursed shall be in acordance with the region in which the operation or project is implemented The method used to calculate these amounts requires that where these amounts are claimed for a type of operation under an Operational Programme, the same amount is claimed for all similar types of operations under the same Operational Programme. Pt_3_. 2. Any operations concerning the provision of employment-related counselling services to registered unemployed, job-seekers or inactive people, except types of operations for which other simplified cost options have been established in another annex to this Delegated Regulation. Pt_1_. 2. Hourly rate for provision of counselling services Pt_2_. 2. Monthly rate for provision of counselling services Pt_3_. 3. Annual rate for provision of counselling services Pt_1_. 3. Number of hours of counselling services provided Pt_2_. 3. Number of months of counselling services provided Pt_3_. 4. Number of years of counselling services provided (12) the amounts mentioned in points 3.2 shall be multiplied by the index for the relevant regional Operational Programme mentioned in point 3.3; (13) where operational programmes cover more than one region, the amount to be reimbursed shall be in acordance with the region in which the operation or project is implemented. The method used to calculate these amounts requires that where these amounts are claimed for a type of operation under an Operational Programme, the same amount is claimed for all similar types of operations under the same Operational Programme. Pt_4_. 2. Any operations concerning the provision of training to employed persons, except types of operations for which other simplified cost options have been established in another annex to this Delegated Regulation. Pt_1_. 4. Hourly rate of training provided to employed persons Pt_2_. 4. Hourly rate of salary paid to an employee while on a training course. Pt_1_. 5. Number of completed hours of training to employed persons per participant. Pt_2_. 5. Number of hours of salary paid to employees while on a training course. (19) the amounts mentioned in point 3.2 shall be multiplied by the index for the relevant regional Operational Programme mentioned in point 3.3; (20) where operational programmes cover more than one region, the amount to be reimbursed shall be in acordance with the region in which the operation or project is implemented. The method used to calculate these amounts requires that where these amounts are claimed for a type of operation under an Operational Programme, the same amount is claimed for all similar types of operations under the same Operational Programme.
1.
1. Formal education operations (from early childhood education to tertiary level including formal vocational education) in all ESF operational programmes.
2. Any operations concerning training of registered unemployed, job-seekers or inactive people, except types of operations for which other simplified cost options have been established in another annex to this Delegated Regulation.
the amounts mentioned in point 3.2 shall be multiplied by the index for the relevant regional Operational Programme mentioned in point 3.3;
where operational programmes cover more than one region, the amount to be reimbursed shall be in acordance with the region in which the operation or project is implemented The method used to calculate these amounts requires that where these amounts are claimed for a type of operation under an Operational Programme, the same amount is claimed for all similar types of operations under the same Operational Programme.
3. Any operations concerning the provision of employment-related counselling services to registered unemployed, job-seekers or inactive people, except types of operations for which other simplified cost options have been established in another annex to this Delegated Regulation.
1. Hourly rate for provision of counselling services
2. Monthly rate for provision of counselling services
3. Annual rate for provision of counselling services
1. Number of hours of counselling services provided
2. Number of months of counselling services provided
3. Number of years of counselling services provided
the amounts mentioned in points 3.2 shall be multiplied by the index for the relevant regional Operational Programme mentioned in point 3.3;
where operational programmes cover more than one region, the amount to be reimbursed shall be in acordance with the region in which the operation or project is implemented. The method used to calculate these amounts requires that where these amounts are claimed for a type of operation under an Operational Programme, the same amount is claimed for all similar types of operations under the same Operational Programme.
4. Any operations concerning the provision of training to employed persons, except types of operations for which other simplified cost options have been established in another annex to this Delegated Regulation.
1. Hourly rate of training provided to employed persons
2. Hourly rate of salary paid to an employee while on a training course.
1. Number of completed hours of training to employed persons per participant.
2. Number of hours of salary paid to employees while on a training course.
the amounts mentioned in point 3.2 shall be multiplied by the index for the relevant regional Operational Programme mentioned in point 3.3;
where operational programmes cover more than one region, the amount to be reimbursed shall be in acordance with the region in which the operation or project is implemented. The method used to calculate these amounts requires that where these amounts are claimed for a type of operation under an Operational Programme, the same amount is claimed for all similar types of operations under the same Operational Programme.
2. Adjustment of Amounts. N/A
3.1 Amounts per participation in formal education (in EUR) AT BE BG CY CZ DE EE EL ES FI* FR HU HR* Early childhood education ED0 6794 n/a 1492 2078 2059 6308 3023 n/a 3451 8740 5495 2451* 2198 Early childhood educational development ED01 6874 n/a n/a 397 n/a 10100 n/a n/a 3075 14701 n/a 2457 n/a Pre-primary education ED02 6778 6284 1492 2544 2059 6308 n/a 2976 3577 7355 5495 n/a 2716 Primary education ED1 8851 7938 963 6898 2205 6476 3339 3198 4035 7387 5031 1772 4592 Primary and lower secondary education (levels 1 and 2) ED1_2 10411 8579 1072 7301 2804 7398 3401 3371 4410 8827 5905 1708 2181 Lower secondary education ED2 11981 10015 1203 7860 3680 8011 3538 3972 5066 11756 6977 1643 n/a Lower secondary education — general ED24 11981 n/a 1232 8138 3687 8011 3358 3728 5135 11756 7026 1612 n/a Lower secondary education — vocational ED25 n/a n/a n/a n/a 2240 n/a 3581 n/a n/a n/a n/a 5086 n/a Upper secondary education ED3 11596 10328 1085 8406 3414 8085 3348 3578 5660* 6980 9256 2708 1995 Upper secondary and post-secondary non-tertiary education (levels 3 and 4) ED3_4 10912 10328 1089 8406 3331 7193 3591 3015 5660 7644 9166 3024 1995 Upper secondary education — general ED34 9982 10033 1012 7842 3065 8358 3221 2997 4899 7140 9033 2314 n/a Upper secondary and post-secondary non-tertiary education – general (levels 34 and 44) ED34_44 9982 10033 1012 7847 2844 8286 3221 2997 4899 7140 9029 2314 n/a Upper secondary education — vocational ED35 12699 10535 1159 11057* 3538 7808 3536 5108 7318 6921 9658 4011 2826 Upper secondary and post-secondary non-tertiary education – vocational (levels 35 and 45) ED35_45 11477 10535 1166 11057 3521 6428 3978 3041 7318 7921 9424 3922 2826 Post-secondary non-tertiary education ED4 1573 n/a 2318 n/a 733 3895 5035 443 n/a n/a 5829 5057 n/a Post-secondary non-tertiary education ED44 n/a n/a n/a n/a 717 6670 n/a n/a n/a n/a 6667 n/a n/a Post-secondary non-tertiary education — vocational ED45 1573 n/a 2318 n/a 829 3737 5035 443 n/a n/a 5648 5057 n/a Short cycle tertiary education ED5 13152 9808 n/a 682 8132 6648 n/a n/a 5061 8850 8883 818 n/a Tertiary education (levels 5-8) ED5-8 9676 7990 935 3507 1986 5981 4036 927 3565 9235 6400 1645 3258 Tertiary education excluding short-cycle tertiary education (levels 6-8) ED6-8 9027 7923 3832 3894 1970 5981 4036 927 3197 9235 5632 1678* n/a IE* IT LV LT LU MT NL* PL PT RO SI SK SE UK* Early childhood education ED0 4957 3709 2622 2272 17392 4138 6153 1954 2689 1009 3827* 2189 13741* 4536 Early childhood educational development ED01 n/a n/a n/a 2184 n/a n/a n/a n/a n/a 1929 4733* n/a 15638* 2712 Pre-primary education ED02 4957 3709 2622 2290 17392 4138 6153 1954 2689 977 3458* 2189 13074* 4863 Primary education ED1 6523 5428 3062 2539 17433 4080 6861 2491 3828 701 4612* 2733 9609 8949 Primary and lower secondary education (levels 1 and 2) ED1_2 6767 5669 3070 2426 17119 5168 8070 2536 4262 983 4509 2625 9780 8550 Lower secondary education ED2 7467 6056 3250 3086 16595 7325 9831 2636 5001 1326 4274* 2522 9780 7819 Lower secondary education — general ED24 7467 5752 3285 2298 16595 7341 8523 2636 n/a 1326 4274* 2478 n/a 7713 Lower secondary education — vocational ED25 n/a 5762 3488 2044 n/a 4946 13302 n/a n/a n/a n/a 4155 n/a 8295 Upper secondary education ED3 7621 5950 3254 2309 15618 4954 7581 2468* 4475* 1367 3354 2554 10200 8162 Upper secondary and post-secondary non-tertiary education (levels 3 and 4) ED3_4 6394 5995* 3271 2281 15212 5001 7581 2319 4475 1260 3354 2570 10016 8162 Upper secondary education — general ED34 7621 5950 3234 2347 13391 4751 7892 2137 n/a 3084 3923* 2134 9245 8170 Upper secondary and post-secondary non-tertiary education — general (levels 34 and 44) ED34_44 7621 n/a 3234 2347 13391 4761 7892 2137 n/a 3084 3923* 2314 9131 8170 Upper secondary education — vocational ED35 n/a n/a 3285 2208 17031 6190 7422 2727* n/a 75 3727* 2789 11794* 8151 Upper secondary and post-secondary non-tertiary education — vocational (levels 35 and 45) ED35_45 3760 n/a 3317 2197 16315 5653 7422 2441* n/a 152 3727* 2798 10854 8515 Post-secondary non-tertiary education ED4 3760 n/a 3484 2186 1417 5263 5056 708 n/a 475 n/a 2930 5436* n/a Post-secondary non-tertiary education ED44 n/a n/a n/a n/a n/a 6178 n/a n/a n/a n/a n/a n/a 8954 n/a Post-secondary non-tertiary education — vocational ED45 3760 n/a 3484 2186 1417 5232 5056 708 n/a 475 n/a 2930 4592 n/a Short cycle tertiary education ED5 n/a 2713 2978 n/a 20512 6463 6358 9627 n/a n/a 1339* 2726 6392 637 Tertiary education (levels 5-8) ED5-8 5084 2334 1741 1631 26940 8994 6320 2287 1948* 1894 4638 2223 10410 2471 Tertiary education excluding short-cycle tertiary education (levels 6-8) ED6-8 6562 2332 1539 1631 27664 9450 6320 2285 1948* 1894 4638* 2223 10410 2471
3.2 Amounts for training for the employed and unemployed, and employment services (in EUR) 3.2.1 Amount per participant demonstrating successful completion of a training course 3.2.2 Hourly rate for provision of employment services 3.2.3 Monthly rate for provision of employment services 3.2.4 Annual amount for provision of employment services 3.2.5 Hourly rate for training of employed persons 3.2.6 Hourly rate for salary of employed person Austria 2277 39 6723 80672 33,98 26,03 Belgium 3351 42 7010 84112 22,97 31,08 Bulgaria 596 3 543 6511 5,14 1,76 Cyprus 2696 29 5467 65604 18,85 10,94 Czechia 521 11 1988 23864 9,29 7,39 Germany 6959 42 7582 90992 36,03 23,11 Denmark 5803 55 9496 113956 39,67 32,02 Estonia 711 14 2498 29968 14,03 8,22 Greece 2064 21 3685 44222 17,72 11,56 Spain 2772 20 3508 42095 17,58 18,30 Finland 5885 45 7683 92204 38,39 27,69 France 6274 48 7297 87556 35,99 25,26 Croatia 689 10 1620 1 9440 10,52 5,90 Hungary 1818 10 1816 21790 15,67 5,02 Ireland 11119 36 6411 76920 31,79 27,20 Italy 3676 31 5438 65247 27,42 22,20 Lithuania 1359 8 1574 18878 7,43 3,71 Luxembourg 19302 34 5908 70890 29,87 23,30 Latvia 756 8 1385 16607 7,94 7,21 Malta 2256 13 2184 26212 16,49 8,41 Netherlands 5018 36 6474 77680 32,01 23,33 Poland 594 6 1051 12611 11,21 4,47 Portugal 994 21 3648 43784 8,33 10,63 Romania 583 8 1555 18656 0,27 2,56 Sweden 7303 48 8369 100430 58,02 32,67 Slovenia 854 22 4015 48185 18,90 7,61 Slovakia 424 7 1117 13411 11,13 12,52 United Kingdom 5863 25 4690 56286 36,07 15,16
3.3. Index to be applied for the amounts for stated regional operations programmes. Belgium 1,00 France 1,00 Brussels Capital 1,26 Île de France 1,32 Flanders 0,97 Champagne-Ardenne 0,88 Wallonia 0,91 Picardie 0,91 Haute-Normandie 0,96 Germany 1,00 Centre 0,89 Baden-Württemberg 1,08 Basse-Normandie 0,86 Bayern 1,05 Bourgogne 0,87 Berlin 0,98 Nord — Pas-de-Calais 0,95 Brandenburg 0,82 Lorraine 0,90 Bremen 1,06 Alsace 0,97 Hamburg 1,21 Franche-Comté 0,89 Hessen 1,12 Pays de la Loire 0,90 Mecklenburg-Vorpommern 0,79 Bretagne 0,86 Niedersachsen 0,93 Poitou-Charentes 0,83 Nordrhein-Westfalen 1,02 Aquitaine 0,87 Rheinland-Pfalz 0,96 Midi-Pyrénées 0,91 Saarland 0,98 Limousin 0,84 Sachsen 0,81 Rhône-Alpes 0,97 Sachsen-Anhalt 0,82 Auvergne 0,86 Schleswig-Holstein 0,87 Languedoc-Roussillon 0,84 Thüringen 0,82 Provence-Alpes-Côte d’Azur 0,93 Corse 0,93 Greece 1,00 Guadeloupe 1,01 Anatoliki Makedonia, Thraki 0,81 Martinique 0,90 Kentriki Makedonia 0,88 Guyane 0,99 Dytiki Makedonia 1,12 La Réunion 0,83 Ipeiros 0,79 Mayotte 0,64 Thessalia 0,83 Ionia Nisia 0,82 Italy 1,00 Dytiki Ellada 0,81 Piemonte 1,04 Sterea Ellada 0,90 Valle d’Aosta 1,00 Peloponnisos 0,79 Liguria 1,01 Attiki 1,23 Lombardia 1,16 Voreio Aigaio 0,90 Provincia Autonoma di Bolzano/Bozen 1,15 Notio Aigaio 0,97 Provincia Autonoma di Trento 1,04 Kriti 0,83 Veneto 1,03 Friuli-Venezia Giulia 1,08 Spain 1,00 Emilia-Romagna 1,06 Galicia 0,88 Toscana 0,95 Principado de Asturias 0,98 Umbria 0,87 Cantabria 0,96 Marche 0,90 País Vasco 1,17 Lazio 1,07 Comunidad Foral de Navarra 1,07 Abruzzo 0,89 La Rioja 0,92 Molise 0,82 Aragón 0,98 Campania 0,84 Comunidad de Madrid 1,18 Puglia 0,82 Castilla y León 0,91 Basilicata 0,86 Castilla-la Mancha 0,88 Calabria 0,75 Extremadura 0,84 Sicilia 0,86 Cataluña 1,09 Sardegna 0,84 Comunidad Valenciana 0,91 Illes Balears 0,96 Portugal 1,00 Andalucía 0,87 Norte 0,86 Región de Murcia 0,84 Algarve 0,87 Ciudad Autónoma de Ceuta 1,07 Centro 0,84 Ciudad Autónoma de Melilla 1,04 Área Metropolitana de Lisboa 1,33 Canarias 0,91 Alentejo 0,91 Região Autónoma dos Açores 0,91 Poland 1,00 Região Autónoma da Madeira 0,95 Lódzkie 0,75 Mazowieckie 1,26 United Kingdom 1,00 Malopolskie 1,05 England 1,01 Slaskie 1,19 Wales 0,83 Lubelskie 0,60 Scotland 0,99 Podkarpackie 0,81 Northern Ireland 0,83 Swietokrzyskie 0,63 Podlaskie 0,73 Wielkopolskie 1,16 Zachodniopomorskie 1,06 Lubuskie 0,88 Dolnoslaskie 1,22 Kujawsko-Pomorskie 0,91 Warminsko-Mazurskie 0,83 Pomorskie 0,78
ANNEX IX
(1) School and Social Inclusion Actions under Priority Axis 3 of Operational Programme Employment, Human Resources and Social Cohesion (CCI 2014CY05M9OP001). Pt_1_. 2. Rate for one period of 45 minutes for teachers hired on contract. (2) Daily rate for permanent and temporary teachers. Pt_1_. 3. Number of hours worked. Pt_2_. 2. Number of days worked. Pt_1_. 4. 21 per 45-minute period Pt_2_. 3. 300 per day Pt_2_. 4. Establishment and Functioning of a Central ADMINISTRATION of Welfare Benefits Service under Priority Axis 3 of Operational Programme Employment, Human Resources and Social Cohesion (CCI 2014CY05M9OP001). (3) Disability and functionality assessments under Priority Axis 3 of Operational Programme Employment, Human Resources and Social Cohesion (CCI 2014CY05M9OP001). Pt_1_. 5. Provision of a disability assessment. Pt_2_. 5. Provision of a disability and functionality assessment. Pt_1_. 6. Disability assessment:190 Pt_2_. 6. Disability and functionality assessment: 303 (4) Reform of the vocational education and training system under under Priority Axis 3 of Operational Programme Employment, Human Resources and Social Cohesion (CCI 2014CY05M9OP001). Pt_1_. 7. One day of work by a teacher Pt_2_. 7. One month of work by a teacher Pt_3_. 2. One hour of work by a teacher hired on contract Pt_4_. 2. One hour of work by a laboratory assistant hired on contract (5) One minute of work by a psychologist hired on contract Pt_1_. 8. Number of days of work by a teacher, differentiated by salary scale Pt_2_. 8. Number of months of work by a teacher Pt_3_. 3. Number of teaching hours (45min) of work by a teacher hired on contract Pt_4_. 3. Number of teaching hours (45min) of work by a laboratory assistant hired on contract Pt_5_. 2. Number of minutes of work by a psychologist hired on contract (25) 2) Pt_3_. 4. 34 Pt_4_. 4. 21 Pt_5_. 3. 0,63 Pt_5_. 4. Upgrading of human resources through the evaluation of the knowledge, skill and ability of candidates based on the System of Vocational Qualification (SVQ) under Priority Axis 4 — Skills Development of the labour force and improving the efficiency of Public Administration of Operational Programme Employment, Human Resources and Social Cohesion (CCI 2014CY05M9OP001). Pt_1_. 9. One month of work by permanent staff assigned on the project at a fixed proportion of time Pt_2_. 9. one hour of work by permanent staff assigned on the project at a variable proportion of time Pt_3_. 5. one hour of work of assessor on contract Pt_4_. 5. one day of work by in-house financial and technical staff hired on contract Pt_5_. 5. one day of work by in-house secretarial staff hired on contract Pt_1_. 10. Number of months worked by permanent staff assigned on the project depending on their respective salary scale. Pt_2_. 10. Number of hours worked by permanent staff on the project at a variable proportion of time Pt_3_. 6. Number of hours worked by assessors on contract Pt_4_. 6. Number of days worked by in-house financial and technical staff hired on contract Pt_5_. 6. Number of days worked by in-house secretarial staff hired on contract Pt_1_. 11. Permanent staff on fixed proportion of time Pt_2_. 11. Permanent staff on variable proportion of time Pt_3_. 7. Assessor on contract Pt_4_. 7. Financial and technical staff hired on contract Pt_5_. 7. Secretarial staff Grp. 1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) All eligible costs including direct staff costs. Monthly rate for permanent and temporary government employees. All eligible costs including direct staff costs. Number of months worked differentiated by salary scale. Salary Scales Α1 1794 A2 1857 A3 2007 A4 2154 A5 2606 A6 3037 A7 3404 A8 3733 A9 4365 A10 4912 A11 5823 A12 6475 A13 7120 All categories of eligible costs. Number of assessments carried out. All categories of eligible costs 1) A8 277 A9 330 A10 371 A11 440 A12 488 A8 4554 A9 5404 A10 6082 A11 7210 A12 8005 A13 8791 All categories of eligible costs Salary scale Unit Cost for work between 2016-2018 Unit cost for work as of 1/1/2019 A8 5550,33 5309,77 Α8 newcomer* / 4908,95 A10 7246,38 6944,83 A11 8615,51 8264,77 A13 10220,30 A8 38,72 37,04 56 56 98 98 63 63 Grp. 2. Adjustment of amounts The amounts for unit costs 5 may be adjusted in line with inflation.
ANNEX XV Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Cyprus
1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) All eligible costs including direct staff costs. Monthly rate for permanent and temporary government employees. All eligible costs including direct staff costs. Number of months worked differentiated by salary scale. Salary Scales Α1 1794 A2 1857 A3 2007 A4 2154 A5 2606 A6 3037 A7 3404 A8 3733 A9 4365 A10 4912 A11 5823 A12 6475 A13 7120 All categories of eligible costs. Number of assessments carried out. All categories of eligible costs 1) A8 277 A9 330 A10 371 A11 440 A12 488 A8 4554 A9 5404 A10 6082 A11 7210 A12 8005 A13 8791 All categories of eligible costs Salary scale Unit Cost for work between 2016-2018 Unit cost for work as of 1/1/2019 A8 5550,33 5309,77 Α8 newcomer* / 4908,95 A10 7246,38 6944,83 A11 8615,51 8264,77 A13 10220,30 A8 38,72 37,04 56 56 98 98 63 63 (1) School and Social Inclusion Actions under Priority Axis 3 of Operational Programme Employment, Human Resources and Social Cohesion (CCI 2014CY05M9OP001). Pt_1_. 2. Rate for one period of 45 minutes for teachers hired on contract. (2) Daily rate for permanent and temporary teachers. Pt_1_. 3. Number of hours worked. Pt_2_. 2. Number of days worked. Pt_1_. 4. 21 per 45-minute period Pt_2_. 3. 300 per day Pt_2_. 4. Establishment and Functioning of a Central ADMINISTRATION of Welfare Benefits Service under Priority Axis 3 of Operational Programme Employment, Human Resources and Social Cohesion (CCI 2014CY05M9OP001). (3) Disability and functionality assessments under Priority Axis 3 of Operational Programme Employment, Human Resources and Social Cohesion (CCI 2014CY05M9OP001). Pt_1_. 5. Provision of a disability assessment. Pt_2_. 5. Provision of a disability and functionality assessment. Pt_1_. 6. Disability assessment:190 Pt_2_. 6. Disability and functionality assessment: 303 (4) Reform of the vocational education and training system under under Priority Axis 3 of Operational Programme Employment, Human Resources and Social Cohesion (CCI 2014CY05M9OP001). Pt_1_. 7. One day of work by a teacher Pt_2_. 7. One month of work by a teacher Pt_3_. 2. One hour of work by a teacher hired on contract Pt_4_. 2. One hour of work by a laboratory assistant hired on contract (5) One minute of work by a psychologist hired on contract Pt_1_. 8. Number of days of work by a teacher, differentiated by salary scale Pt_2_. 8. Number of months of work by a teacher Pt_3_. 3. Number of teaching hours (45min) of work by a teacher hired on contract Pt_4_. 3. Number of teaching hours (45min) of work by a laboratory assistant hired on contract Pt_5_. 2. Number of minutes of work by a psychologist hired on contract (25) 2) Pt_3_. 4. 34 Pt_4_. 4. 21 Pt_5_. 3. 0,63 Pt_5_. 4. Upgrading of human resources through the evaluation of the knowledge, skill and ability of candidates based on the System of Vocational Qualification (SVQ) under Priority Axis 4 — Skills Development of the labour force and improving the efficiency of Public Administration of Operational Programme Employment, Human Resources and Social Cohesion (CCI 2014CY05M9OP001). Pt_1_. 9. One month of work by permanent staff assigned on the project at a fixed proportion of time Pt_2_. 9. one hour of work by permanent staff assigned on the project at a variable proportion of time Pt_3_. 5. one hour of work of assessor on contract Pt_4_. 5. one day of work by in-house financial and technical staff hired on contract Pt_5_. 5. one day of work by in-house secretarial staff hired on contract Pt_1_. 10. Number of months worked by permanent staff assigned on the project depending on their respective salary scale. Pt_2_. 10. Number of hours worked by permanent staff on the project at a variable proportion of time Pt_3_. 6. Number of hours worked by assessors on contract Pt_4_. 6. Number of days worked by in-house financial and technical staff hired on contract Pt_5_. 6. Number of days worked by in-house secretarial staff hired on contract Pt_1_. 11. Permanent staff on fixed proportion of time Pt_2_. 11. Permanent staff on variable proportion of time Pt_3_. 7. Assessor on contract Pt_4_. 7. Financial and technical staff hired on contract Pt_5_. 7. Secretarial staff
1.
1. School and Social Inclusion Actions under Priority Axis 3 of Operational Programme Employment, Human Resources and Social Cohesion (CCI 2014CY05M9OP001).
1) Rate for one period of 45 minutes for teachers hired on contract.
2) Daily rate for permanent and temporary teachers.
1) Number of hours worked.
2) Number of days worked.
1) 21 per 45-minute period
2) 300 per day
2. Establishment and Functioning of a Central ADMINISTRATION of Welfare Benefits Service under Priority Axis 3 of Operational Programme Employment, Human Resources and Social Cohesion (CCI 2014CY05M9OP001).
3. Disability and functionality assessments under Priority Axis 3 of Operational Programme Employment, Human Resources and Social Cohesion (CCI 2014CY05M9OP001).
1) Provision of a disability assessment.
2) Provision of a disability and functionality assessment.
1) Disability assessment:190
2) Disability and functionality assessment: 303
4. Reform of the vocational education and training system under under Priority Axis 3 of Operational Programme Employment, Human Resources and Social Cohesion (CCI 2014CY05M9OP001).
1. One day of work by a teacher
2. One month of work by a teacher
3. One hour of work by a teacher hired on contract
4. One hour of work by a laboratory assistant hired on contract
5. One minute of work by a psychologist hired on contract
1. Number of days of work by a teacher, differentiated by salary scale
2. Number of months of work by a teacher
3. Number of teaching hours (45min) of work by a teacher hired on contract
4. Number of teaching hours (45min) of work by a laboratory assistant hired on contract
5. Number of minutes of work by a psychologist hired on contract
2)
3) 34
4) 21
5) 0,63
5. Upgrading of human resources through the evaluation of the knowledge, skill and ability of candidates based on the System of Vocational Qualification (SVQ) under Priority Axis 4 — Skills Development of the labour force and improving the efficiency of Public Administration of Operational Programme Employment, Human Resources and Social Cohesion (CCI 2014CY05M9OP001).
1) One month of work by permanent staff assigned on the project at a fixed proportion of time
2) one hour of work by permanent staff assigned on the project at a variable proportion of time
3) one hour of work of assessor on contract
4) one day of work by in-house financial and technical staff hired on contract
5) one day of work by in-house secretarial staff hired on contract
1) Number of months worked by permanent staff assigned on the project depending on their respective salary scale.
2) Number of hours worked by permanent staff on the project at a variable proportion of time
3) Number of hours worked by assessors on contract
4) Number of days worked by in-house financial and technical staff hired on contract
5) Number of days worked by in-house secretarial staff hired on contract
1) Permanent staff on fixed proportion of time
2) Permanent staff on variable proportion of time
3) Assessor on contract
4) Financial and technical staff hired on contract
5) Secretarial staff
2. Adjustment of amounts The amounts for unit costs 5 may be adjusted in line with inflation.
ANNEX X
(1) Training for the unemployed provided by Education and Training Boards (ETB) under Priority Axis 1 of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001). (2) Training for the unemployed provided by Education and Training Boards (ETB) under Priority Axis 1 of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001). (3) Training for the unemployed provided by Education and Training Boards (ETB) under Priority Axes 1 and 4 of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001). (4) Training for the unemployed provided by Education and Training Boards (ETB) under Priority Axes 1 and 4 of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001). (5) Training for the unemployed provided by Education and Training Boards (ETB) under Priority Axis 1 and 4 of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001). (6) Social inclusion support by SICAP workers to those at a higher risk of social exlusion under Priority Axis 2.1 — Promoting Social Inclusion and combating discrimination in the labour market of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001). Grp. 1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Successful result recorded for a participant on the Bridging programme. All eligible costs of the operation. Number of successful results per participant. 1316 Successful result recorded for a participant on the Specific Skills Training programme. All eligible costs of the operation. Number of successful results. 1631 Successful result recorded for a participant on the Traineeship programme. All eligible costs of the operation. Number of successful results. 1513 Successful result recorded for a participant on the Community Training Centre programme. All eligible costs of the operation. Number of successful results. 4718 Successful result recorded for a participant on the Local Training Initiatives programme. All eligible costs of the operation. Number of successful results. 1658 Annual rate per full-time equivalent (FTE) SICAP worker. All eligible costs of the operation. Number of SICAP workers (FTE) per year. 70262 Grp. 2. Adjustment of amounts The amounts for operation type 6 may be increased on an annual basis in line with movements in the Irish Consumer Price Index. Grp. 3. Lump sums Type of operations Indicator name Category of costs Measurement unit for the indicator Amounts (in EUR) Technical Assistance Priority axis 5 Programme for Employability, Inclusion and Learning Operational Programme 2014-2020 PEIL CCI:2014IE05M9OP001 New total expenditure included in a payment application. (i.e. total eligible expenditure included in a payment application which has not yet been taken into account for calculating an installment of 100000 EUR). All eligible costs. Installments of EUR 100000 of new total expenditure included in a payment application submitted to the European Commission until the maximum amount budgeted under the technical assistance priority axis is reached 2323,03
ANNEX XVII Conditions for reimbursement of expenditure on the basis of standard scales of unit costs and lump sums to Ireland
1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Successful result recorded for a participant on the Bridging programme. All eligible costs of the operation. Number of successful results per participant. 1316 Successful result recorded for a participant on the Specific Skills Training programme. All eligible costs of the operation. Number of successful results. 1631 Successful result recorded for a participant on the Traineeship programme. All eligible costs of the operation. Number of successful results. 1513 Successful result recorded for a participant on the Community Training Centre programme. All eligible costs of the operation. Number of successful results. 4718 Successful result recorded for a participant on the Local Training Initiatives programme. All eligible costs of the operation. Number of successful results. 1658 Annual rate per full-time equivalent (FTE) SICAP worker. All eligible costs of the operation. Number of SICAP workers (FTE) per year. 70262 (1) Training for the unemployed provided by Education and Training Boards (ETB) under Priority Axis 1 of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001). (2) Training for the unemployed provided by Education and Training Boards (ETB) under Priority Axis 1 of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001). (3) Training for the unemployed provided by Education and Training Boards (ETB) under Priority Axes 1 and 4 of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001). (4) Training for the unemployed provided by Education and Training Boards (ETB) under Priority Axes 1 and 4 of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001). (5) Training for the unemployed provided by Education and Training Boards (ETB) under Priority Axis 1 and 4 of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001). (6) Social inclusion support by SICAP workers to those at a higher risk of social exlusion under Priority Axis 2.1 — Promoting Social Inclusion and combating discrimination in the labour market of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001).
1.
1. Training for the unemployed provided by Education and Training Boards (ETB) under Priority Axis 1 of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001).
2. Training for the unemployed provided by Education and Training Boards (ETB) under Priority Axis 1 of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001).
3. Training for the unemployed provided by Education and Training Boards (ETB) under Priority Axes 1 and 4 of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001).
4. Training for the unemployed provided by Education and Training Boards (ETB) under Priority Axes 1 and 4 of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001).
5. Training for the unemployed provided by Education and Training Boards (ETB) under Priority Axis 1 and 4 of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001).
6. Social inclusion support by SICAP workers to those at a higher risk of social exlusion under Priority Axis 2.1 — Promoting Social Inclusion and combating discrimination in the labour market of the Operational Programme for Employability, Inclusion and Learning (2014IE05M9OP001).
2. Adjustment of amounts The amounts for operation type 6 may be increased on an annual basis in line with movements in the Irish Consumer Price Index.
3. Lump sums Type of operations Indicator name Category of costs Measurement unit for the indicator Amounts (in EUR) Technical Assistance Priority axis 5 Programme for Employability, Inclusion and Learning Operational Programme 2014-2020 PEIL CCI:2014IE05M9OP001 New total expenditure included in a payment application. (i.e. total eligible expenditure included in a payment application which has not yet been taken into account for calculating an installment of 100000 EUR). All eligible costs. Installments of EUR 100000 of new total expenditure included in a payment application submitted to the European Commission until the maximum amount budgeted under the technical assistance priority axis is reached 2323,03
ANNEX XI
(1) 2014PT16M3OP001 (Compete 2020): 5 — Strengthening the institutional capacity of public authorities and stakeholders and the efficiency of public administration (2) 2014PT16M2OP001 (Norte 2020): priority axis 9 — Institutional Capacity Building and ICT (3) 2014PT16M2OP002 (Centro 2020): priority axis 8 — Strengthening the institutional capacity of regional entities (4) 2014PT16M2OP003 (Alentejo 2020): priority axis 9 — Institutional Capacity Building and Administrative Modernisation (5) 2014PT16M2OP007 (Cresc Algarve): priority axis 8 — Modernise and empower the Administration Pt_1_. 2. Hourly rate for training provided to people employed in the public sector. Pt_2_. 2. Hourly rate for salaries paid to people employed in the public sector while on a training course. Pt_1_. 3. 7,12 — hourly rate for training Pt_2_. 3. 7,50 — hourly rate covering the salary of the person attending a training. Grp. 1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Any operation concerning the provision of non-formal training to people employed in the public sector with the goal to obtain knowledge and/or learn new skills in the context of the reorganisation and modernisation of public administrations under the following operational programmes: All eligible costs of the operation. Where the salary of the person trained while attending a training course is not an eligible cost, only the hourly rate for the training shall be reimbursed. Where the salary of the person trained is an eligible cost item for this operation, both amounts may be reimbursed. Number of completed hours of training provided to people employed in the public sector per participant. Grp. 2. Adjustment of amounts Unit cost 1 may be adjusted in line with new data on amounts spent on training as reported in the Continuing Vocational Education Survey published by Eurostat (baseline: 2015).
ANNEX XXI Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Portugal
1. Definition of standard scales of unit costs Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts (in EUR) Any operation concerning the provision of non-formal training to people employed in the public sector with the goal to obtain knowledge and/or learn new skills in the context of the reorganisation and modernisation of public administrations under the following operational programmes: All eligible costs of the operation. Where the salary of the person trained while attending a training course is not an eligible cost, only the hourly rate for the training shall be reimbursed. Where the salary of the person trained is an eligible cost item for this operation, both amounts may be reimbursed. Number of completed hours of training provided to people employed in the public sector per participant. (1) 2014PT16M3OP001 (Compete 2020): 5 — Strengthening the institutional capacity of public authorities and stakeholders and the efficiency of public administration (2) 2014PT16M2OP001 (Norte 2020): priority axis 9 — Institutional Capacity Building and ICT (3) 2014PT16M2OP002 (Centro 2020): priority axis 8 — Strengthening the institutional capacity of regional entities (4) 2014PT16M2OP003 (Alentejo 2020): priority axis 9 — Institutional Capacity Building and Administrative Modernisation (5) 2014PT16M2OP007 (Cresc Algarve): priority axis 8 — Modernise and empower the Administration Pt_1_. 2. Hourly rate for training provided to people employed in the public sector. Pt_2_. 2. Hourly rate for salaries paid to people employed in the public sector while on a training course. Pt_1_. 3. 7,12 — hourly rate for training Pt_2_. 3. 7,50 — hourly rate covering the salary of the person attending a training.
2014PT16M3OP001 (Compete 2020): 5 — Strengthening the institutional capacity of public authorities and stakeholders and the efficiency of public administration
2014PT16M2OP001 (Norte 2020): priority axis 9 — Institutional Capacity Building and ICT
2014PT16M2OP002 (Centro 2020): priority axis 8 — Strengthening the institutional capacity of regional entities
2014PT16M2OP003 (Alentejo 2020): priority axis 9 — Institutional Capacity Building and Administrative Modernisation
2014PT16M2OP007 (Cresc Algarve): priority axis 8 — Modernise and empower the Administration
1.
(1) Hourly rate for training provided to people employed in the public sector.
(2) Hourly rate for salaries paid to people employed in the public sector while on a training course.
(1) 7,12 — hourly rate for training
(2) 7,50 — hourly rate covering the salary of the person attending a training.
2. Adjustment of amounts Unit cost 1 may be adjusted in line with new data on amounts spent on training as reported in the Continuing Vocational Education Survey published by Eurostat (baseline: 2015).